X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

37-019-22104

Well Details

Well ID: 37-019-22104
Loading map...
Country: United States
State: Pennsylvania
County: Butler
Municipality: Clinton Township
Operator Name: PENNENERGY RESOURCES LLC
Well Pad ID: 145385
Farm/Lease Name: W74 PER W74 4H
License Status:
Spud Date:
Permit Date: 2013-07-16
Well Type: GAS
Unconventional Well: Y
Configuration: Horizontal Well
Conservation: No
Latitude: 40.718725
Longitude: -79.807811

For data sources see[1][2][3]

Well History

Date Event
2013-07-16 New Permit Application
2013-08-12 Performed Spud Operation
2014-01-26 Drilling Completion
2014-03-07 Perforation
2015-02-11 DEVIATED

For data sources see[4]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2014-04-01 2014-04-04 6,356 6,680,530 0

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Unislik ST50 CESI Friction Reducer Petroleum Distillates, Hydrotreated Light 64742-47-8 30 0.023515 15269.4
I-7L Weatherford Iron Control Triethanolamine Hydroxyacetate 68299-02-5 20 0.00212263 1378.33
Ethylene Glycol 107-21-1 20 0.00212263 1378.33
Glycolic Acid 79-14-1 2.5 0.000265328 172.291
Sand (Proppant) Sargent Proppant Silica 14808-60-7 99.9 11.3824 7,391,130.0
Unihib G GeoSafe Acid Corrosion Inhibitor Glycol Ether 112-34-5 60 0.000523485 339.925
Ethoxylated Alcohol 68002-97-1 35 0.000305367 198.29
Acetophenone 98-86-2 1 0.00000872 5.665
Methanol 67-56-1 5 0.00004362 28.327
Thiourea 62-56-6 1 0.00000872 5.665
Formaldehyde 50-00-0 1 0.00000872 5.665
Hydrochloric Acid (7.5%) Axiall Acidizing Hydrogen Chloride 7647-01-0 40 1.05575 685550
WGA-3 PfP Technology Water Viscosifier Guar Gum 9000-30-0 100 0.001309 850
LEB 10X Weatherford Gel Breaker Ethylene Glycol 107-21-1 40 0.00001380 8.959
Scale Hib A Nalco Scale Inhibitor Ethylene Glycol 107-21-1 30 0.00328171 2130.98
EC6116A Nalco Biocide Dibromoacetonitrile 3252-43-5 5 0.000557169 361.797
Polyethylene Glycol 25322-68-3 60 0.00668602 4341.57
2,2-Dibromo-3-nitrilopropionamide 10222-01-2 30 0.00334301 2170.78
Water PennEnergy Resources Carrier/Base Fluid Water 7732-18-5 100 85.8536 55,749,000.0

For data sources see[5]

Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2013 PENNENERGY RESOURCES LLC 0.00 0 0.00 0 0.00 0
2014 PENNENERGY RESOURCES LLC 1,321,418.72 234 0.00 0 0.00 0
2015 PENNENERGY RESOURCES LLC 1,345,271.00 359 0.00 0 0.00 0
2016 PENNENERGY RESOURCES LLC 1,004,018.00 341 0.00 0 0.00 0
2017 PENNENERGY RESOURCES LLC 863,570.00 345 0.00 0 0.00 0
2018 PENNENERGY RESOURCES LLC 757,491.00 364 0.00 0 0.00 0
2019 PENNENERGY RESOURCES LLC 638,927.00 359 0.00 0 0.00 28

For data sources see[6]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2013 PENNENERGY RESOURCES LLC Drilling Fluid Waste 5,954.90 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE EPA ID: 748-163
2013 PENNENERGY RESOURCES LLC Drill Cuttings 273.00 Tons LANDFILL CID # 28726
2014 PENNENERGY RESOURCES LLC Drilling Fluid Waste 85.00 Bbl CENT WASTE TRT FAC NPDES DISCHARGE EPA ID: 748-163
2014 PENNENERGY RESOURCES LLC General O&G waste not covered by other waste types 4.58 Tons LANDFILL CID # 28726
2014 PENNENERGY RESOURCES LLC Fracturing Fluid Waste 155.70 Tons LANDFILL CID # 28726
2014 PENNENERGY RESOURCES LLC Drill Cuttings 421.30 Tons LANDFILL CID # 28726
2014 PENNENERGY RESOURCES LLC Drilling Fluid Waste 85.00 Bbl CENT WASTE TRT FAC NPDES EPA ID: 748-163
2015 PENNENERGY RESOURCES LLC Produced Fluid 676.25 Bbl INJECTION DISPOSAL WELL 34-155-21438
2016 PENNENERGY RESOURCES LLC Produced Fluid 1,026.65 Bbl INJECTION DISPOSAL WELL 34-155-22403
2016 PENNENERGY RESOURCES LLC Produced Fluid 357.68 Bbl INJECTION DISPOSAL WELL 34-155-23223
2016 PENNENERGY RESOURCES LLC Produced Fluid 31.31 Bbl INJECTION DISPOSAL WELL 34-119-28776
2016 PENNENERGY RESOURCES LLC Produced Fluid 481.21 Bbl INJECTION DISPOSAL WELL 34-155-23196
2016 PENNENERGY RESOURCES LLC Produced Fluid 2,888.97 Bbl REUSE OTHER THAN ROAD SPREADING
2017 PENNENERGY RESOURCES LLC Produced Fluid 2,380.12 Bbl REUSE (AT WELL PAD)
2018 PENNENERGY RESOURCES LLC Produced Fluid 1,826.48 Tons REUSE (AT WELL PAD)
2018 PENNENERGY RESOURCES LLC Produced Fluid 18.67 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW009
2018 PENNENERGY RESOURCES LLC Produced Fluid 58.25 Bbl INJECTION DISPOSAL WELL 34-155-22403
2019 PENNENERGY RESOURCES LLC Produced Fluid 151.95 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW009
2019 PENNENERGY RESOURCES LLC Produced Fluid 74.38 Bbl INJECTION DISPOSAL WELL 34-155-21893
2019 PENNENERGY RESOURCES LLC Produced Fluid 68.09 Bbl INJECTION DISPOSAL WELL 34-155-23223
2019 PENNENERGY RESOURCES LLC Produced Fluid 1,566.93 Bbl REUSE (AT WELL PAD)
2019 PENNENERGY RESOURCES LLC Produced Fluid 33.99 Bbl INJECTION DISPOSAL WELL 34-155-23196

For data sources see[7]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
2197065 Primary Facility 2013-08-16 Drilling/Alteration No Violations Noted
2198170 Primary Facility 2013-08-23 Drilling/Alteration No Violations Noted
2240181 Primary Facility 2014-01-24 Routine/Partial Inspection No Violations Noted
2308035 Primary Facility 2014-09-23 Routine/Partial Inspection No Violations Noted
2539567 Primary Facility 2016-11-22 Routine/Partial Inspection No Violations Noted
2775919 Primary Facility 2018-09-17 Routine/Partial Inspection No Violations Noted On 9/17/2018, WQS Brian MacQuarrie onsite. Site sign maintained at entrance to site. Access road maintained. Well pad fenced in. Four wells in production. The 1H-019-22068, 2H-019-22078, 3H-019-22086 and 4H-019-22104. Two 400 bbl tanks installed within secondary containment. Vegetative growth well established. Post Construction Stormwater wet pond installed and maintained.

For data sources see[8]

References