If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 37-019-22166 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.882536,"lon":-79.749667,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Butler | |
Municipality: Clearfield Township | |
Operator Name: XTO ENERGY INC | |
Well Pad ID: 145088 | |
Farm/Lease Name: CYPHER B UNIT 2H | |
License Status: | |
Spud Date: | |
Permit Date: 2013-11-01 | |
Well Type: GAS | |
Unconventional Well: Y | |
Configuration: Horizontal Well | |
Conservation: No | |
Latitude: 40.882536 | |
Longitude: -79.749667 |
Date | Event |
---|---|
2013-11-01 | New Permit Application |
2013-11-28 | Performed Spud Operation |
2014-03-02 | Drilling Completion |
2014-08-19 | Perforation |
2015-03-11 | DEVIATED |
For data sources see[4]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 2014-10-16 | 2014-12-02 | 5,941 | 7,008,450 | 0 |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | Acid Inhibitor, Unihib G | GeoSafe | Acid Inhibitor | Thiourea | 62-56-6 | 1 | 0.00000537 | 3.553 |
Ethoxylated alcohol | 68002-97-1 | 35 | 0.000188044 | 124.343 | ||||
Short chained glycol ether | 112-34-5 | 60 | 0.000322361 | 213.159 | ||||
Formaldehyde | 50-00-0 | 1 | 0.00000537 | 3.553 | ||||
Acetophenone | 98-86-2 | 1 | 0.00000537 | 3.553 | ||||
Methanol | 67-56-1 | 5 | 0.00002686 | 17.763 | ||||
Biocide, EC6116A | Nalco | Biocide | Polyethylene Glycol | 25322-68-3 | 60 | 0.0123898 | 8192.7 | |
Dibromoacetonitrile | 3252-43-5 | 5 | 0.00103249 | 682.725 | ||||
Other - (non-hazardous) | NA | 5 | 0.00103249 | 682.725 | ||||
2,2-Dibromo-3-nitrilopropionamide | 10222-01-2 | 30 | 0.00619492 | 4096.35 | ||||
Scale Inhibitor, ScaleHib A | Nalco | Scale Inhibitor | Ethylene Glycol | 107-21-1 | 30 | 0.00316042 | 2089.81 | |
Other - (non-hazardous) | NA | 70 | 0.00737432 | 4876.23 | ||||
Friction Reducer, Unislick ST-50 | CESI Chemical | Friction Reducer | Other - (non-hazardous) | NA | 70 | 0.0388283 | 25675 | |
Petroleum distillates, hydrotreated light | 64742-47-8 | 30 | 0.0166407 | 11003.6 | ||||
Hydrochloric Acid (7.5%) | Axiall | Acidizing | Hydrochloric Acid | 7647-01-0 | 7.5 | 0.0183234 | 12116.2 | |
Hydrochloric Acid | 7647-01-0 | 7.5 | 0.0441427 | 29189.1 | ||||
Hydrochloric Acid | 7647-01-0 | 7.5 | 0.020822 | 13768.5 | ||||
Other - (non-hazardous) | NA | 92.5 | 1.02722 | 679244 | ||||
Hydrochloric Acid (15%) | Axiall | Acidizing | Hydrochloric Acid | 7647-01-0 | 15 | 0.0025542 | 1688.95 | |
Hydrochloric Acid | 7647-01-0 | 15 | 0.0054149 | 3580.57 | ||||
Hydrochloric Acid | 7647-01-0 | 15 | 0.00224769 | 1486.27 | ||||
Other - (non-hazardous) | NA | 85 | 0.0578951 | 38282.8 | ||||
Sand (Proppant) | Universal | Proppant | Silica Substrate | NA | 100 | 10.2865 | 6,801,900.0 | |
Water | XTO | Carrier/Base Fluid | Water | 7732-18-5 | 100 | 88.4477 | 58,485,500.0 |
For data sources see[5]
Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
---|---|---|---|---|---|---|---|
2013 | XTO ENERGY INC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2014 | XTO ENERGY INC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2015 | XTO ENERGY INC | 295,184.00 | 220 | 0.00 | 0 | 0.00 | 0 |
2016 | XTO ENERGY INC | 256,674.00 | 327 | 0.00 | 0 | 31.66 | 85 |
2017 | XTO ENERGY INC | 258,003.00 | 231 | 0.00 | 0 | 0.00 | 0 |
2018 | XTO ENERGY INC | 203,690.01 | 179 | 0.00 | 0 | 25.83 | 32 |
2019 | XTO ENERGY INC | 150,310.07 | 186 | 0.00 | 0 | 1.52 | 31 |
For data sources see[6]
Period | Operator | Waste Type | Quantity | Disposal Method | Waste Facility ID |
---|---|---|---|---|---|
2013 | XTO ENERGY INC | Drill Cuttings | 343.00 Tons | LANDFILL | 100403 |
2013 | XTO ENERGY INC | Drill Cuttings | 240.00 Tons | LANDFILL | 101397 |
2014 | XTO ENERGY INC | Fracing Fluid Waste | 811.80 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123SW005 |
2014 | XTO ENERGY INC | Fracing Fluid Waste | 197.50 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NW009 |
2014 | XTO ENERGY INC | Drill Cuttings | 139.36 Tons | LANDFILL | 100403 |
2015 | XTO ENERGY INC | Produced Fluid | 1,057.60 Bbl | INJECTION DISPOSAL WELL | 34-133-24096 |
2015 | XTO ENERGY INC | Produced Fluid | 1,499.00 Bbl | INJECTION DISPOSAL WELL | 34-133-21076 |
2015 | XTO ENERGY INC | Produced Fluid | 17,236.60 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NW009 |
2015 | XTO ENERGY INC | Produced Fluid | 739.60 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123SW005 |
2015 | XTO ENERGY INC | Fracing Fluid Waste | 90.00 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NW009 |
2016 | XTO ENERGY INC | Produced Fluid | 3,143.50 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NW009 |
2016 | XTO ENERGY INC | Produced Fluid | 266.00 Bbl | INJECTION DISPOSAL WELL | 34-133-24189 |
2016 | XTO ENERGY INC | Fracturing Fluid Waste | 0.71 Bbl | RESIDUAL WASTE TRANSFER FACILITY | 101674 |
2016 | XTO ENERGY INC | Produced Fluid | 179.00 Bbl | INJECTION DISPOSAL WELL | 34-133-21076 |
2016 | XTO ENERGY INC | Produced Fluid | 588.30 Bbl | INJECTION DISPOSAL WELL | 34-133-24096 |
2016 | XTO ENERGY INC | Produced Fluid | 3,936.64 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NW009 |
2017 | XTO ENERGY INC | Produced Fluid | 602.89 Bbl | INJECTION DISPOSAL WELL | 34-133-24189 |
2017 | XTO ENERGY INC | Produced Fluid | 416.15 Bbl | INJECTION DISPOSAL WELL | 34-133-24096 |
2017 | XTO ENERGY INC | Other Oil & Gas Wastes | 3.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NW009 |
2017 | XTO ENERGY INC | Produced Fluid | 765.00 Bbl | INJECTION DISPOSAL WELL | 34-133-21076 |
2017 | XTO ENERGY INC | Produced Fluid | 2,728.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NW009 |
2018 | XTO ENERGY INC | Produced Fluid | 571.00 Bbl | INJECTION DISPOSAL WELL | 34-133-24096 |
2018 | XTO ENERGY INC | Produced Fluid | 405.00 Bbl | INJECTION DISPOSAL WELL | 34-133-24189 |
2018 | XTO ENERGY INC | Produced Fluid | 3,240.37 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NW009 |
2019 | XTO ENERGY INC | Produced Fluid | 216.00 Bbl | INJECTION DISPOSAL WELL | 34-133-24189 |
2019 | XTO ENERGY INC | Produced Fluid | 1,014.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NW009 |
2019 | XTO ENERGY INC | Produced Fluid | 650.00 Bbl | INJECTION DISPOSAL WELL | 34-133-21076 |
2019 | XTO ENERGY INC | Produced Fluid | 505.00 Bbl | INJECTION DISPOSAL WELL | 34-133-24096 |
2019 | XTO ENERGY INC | Produced Fluid | 105.00 Bbl | REUSE (AT WELL PAD) |
For data sources see[7]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
2227204 | Primary Facility | 2013-12-04 | Drilling/Alteration | No Violations Noted | |
2231169 | Primary Facility | 2013-12-19 | Routine/Partial Inspection | No Violations Noted | |
2233988 | Primary Facility | 2013-12-31 | Drilling/Alteration | No Violations Noted | |
2235537 | Primary Facility | 2014-01-09 | Routine/Partial Inspection | No Violations Noted | |
2249576 | Primary Facility | 2014-02-24 | Drilling/Alteration | No Violations Noted | |
2251684 | Primary Facility | 2014-03-05 | Drilling/Alteration | No Violations Noted | |
2323914 | Primary Facility | 2014-11-25 | Routine/Partial Inspection | No Violations Noted | |
2532630 | Primary Facility | 2016-10-19 | Routine/Partial Inspection | No Violations Noted | |
2595780 | Primary Facility | 2017-05-19 | Routine/Partial Inspection | No Violations Noted | On site for a partial inspection of the Cypher B Unit 2H Well.
Well is drilled & completed, and in production. Well is attached to production equipment (production tank, GPU, & combustor). Well feeds to a gathering pipeline on site. Well tag in place. Well is fenced & protected with jersey barriers. Well pad has been restored per the PCSM plans. All temporary E/S controls removed. |
2791112 | Primary Facility | 2018-10-18 | Routine/Partial Inspection | No Violations Noted | On site for a routine partial inspection.
Well is drilled, completed, and in production. Well tag in place. Well protected. Site has 10 drilled and completed wells. Wells are fenced. Site has 12 production tanks on containment. Site has 10 GPUs on containment. There is 1 combustor on site. There is a pipeline header on the well pad. |
2815885 | Primary Facility | 2018-12-14 | Routine/Partial Inspection | No Violations Noted | On 12/14/2018, WQSS Scott Lux and WQS Brian MacQuarrie onsite. Well site consists of 10 wells in production permit nos. A1H (019-22019), B1H (019-22020), A2H (019-22053), A3H (019-22054), B2H (019-22166), A4H (019-22167), A5H (019-22173), B5H (019-22174), B4H (019-22175) and B3H (019-22176). Production equipment consists of twelve 400 bbl tanks within stainless steel containment structure, 10 GPUs and one TVO. Site well vegetated and maintained. Earth disturbance permit ESX12-019-0161 terminated on 5/19/2017. |
For data sources see[8]