X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

37-019-22169

Well Details

Well ID: 37-019-22169
Loading map...
Country: United States
State: Pennsylvania
County: Butler
Municipality: Summit Township
Operator Name: XTO ENERGY INC
Well Pad ID: 150096
Farm/Lease Name: GEIBEL UNIT 4H
License Status:
Spud Date:
Permit Date: 2013-12-05
Well Type: GAS
Unconventional Well: Y
Configuration: Horizontal Well
Conservation: No
Latitude: 40.865592
Longitude: -79.783911

For data sources see[1][2][3]

Well History

Date Event
2013-12-05 New Permit Application
2013-12-08 Performed Spud Operation

For data sources see[4]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2014-04-24 2014-06-19 5,920 8,992,240 0

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Acid Corrosion Inhibitor, A12 Nabors Corrosion Inhibitor Other -(non hazardous) NA 3 0.00005993 50.511
Isopropyl Alcohol 67-63-0 30 0.000599298 505.106
Propargyl Alcohol 107-19-7 30 0.000599298 505.106
Short Chained glycol ether 112-34-5 30 0.000599298 505.106
Proprietary Component NA 7 0.000139836 117.858
Sand (Proppant) Nabors Proppant Silica Substrate NA 100 9.30306 7,840,900.0
Water XTO Carrier/Base Fluid Water 7732-18-5 100 89.0337 75,040,300.0
Friction Reducer, EXP F1111-13 Nabors Friction Reducer Alcohol Ethoxylates Component 69227-21-0 5 0.00248197 2091.88
Alcohol Ethoxylates component 68585-36-4 5 0.00248197 2091.88
Anionic Polyacrylamide 38193-60-1 35 0.0173738 14643.1
Sorbitan Monoolite 1338-43-8 5 0.00248197 2091.88
Petroleum distillate hydrotreated light 64742-47-8 35 0.0173738 14643.1
Ethylene Glycol 107-21-1 4 0.00198557 1673.5
Hydrochloric Acid (15%) PPG Industries Acidizing Hydrochloric Acid 7647-01-0 15 0.108121 91127.4
Other - (non-hazardous) NA 85 0.612684 516389
Hydrochloric Acid (7.5%) PPG Industries Acidizing Hydrochloric Acid 7647-01-0 7.5 0.0648724 54676.4
Other - (non-hazardous) NA 92.5 0.800093 674343
Scale Inhibitor, TSC Nabors Scale Inhibitor Propylene glycol 57-55-6 40 0.00391737 3301.67
Other -(non hazardous) NA 15 0.00146901 1238.13
Anionic copolymer NA 15 0.00146901 1238.13
2-Phosphonobutane-1,2,4-tricarboxylic acid, potassium salt 93858-78-7 15 0.00146901 1238.13
Biocide KR-153SL Nabors Biocide 2,2-Dibromo-3-nitrilo-propionamide 10222-01-2 20 0.00321045 2705.87
Other -(non hazardous) NA 30 0.00481568 4058.8
Polyethylene Glycol 25322-68-3 50 0.00802613 6764.67

For data sources see[5]

Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2013 XTO ENERGY INC 0.00 0 0.00 0 0.00 0
2014 XTO ENERGY INC 15,179.00 11 0.00 0 0.00 0
2015 XTO ENERGY INC 95,104.00 230 0.00 0 0.00 0
2016 XTO ENERGY INC 92,398.00 321 0.00 0 42.09 167
2017 XTO ENERGY INC 34,371.00 105 0.00 0 16.68 90
2018 XTO ENERGY INC 48,546.42 138 0.00 0 11.02 88
2019 XTO ENERGY INC 44,526.23 342 0.00 0 39.40 265

For data sources see[6]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2013 XTO ENERGY INC Drill Cuttings 1,002.00 Tons LANDFILL 100403
2014 XTO ENERGY INC Fracing Fluid Waste 2,385.90 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123NW009
2014 XTO ENERGY INC Fracing Fluid Waste 1,353.50 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123SW005
2014 XTO ENERGY INC Fracing Fluid Waste 308.00 Bbl INJECTION DISPOSAL WELL 34-133-24096
2015 XTO ENERGY INC Produced Fluid 883.00 Bbl INJECTION DISPOSAL WELL 34-133-24096
2015 XTO ENERGY INC Produced Fluid 605.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123SW005
2015 XTO ENERGY INC Produced Fluid 5,274.10 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123NW009
2016 XTO ENERGY INC Produced Fluid 333.00 Bbl INJECTION DISPOSAL WELL 34-133-24096
2016 XTO ENERGY INC Produced Fluid 121.60 Bbl INJECTION DISPOSAL WELL 34-133-21076
2016 XTO ENERGY INC Produced Fluid 2,243.20 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123NW009
2016 XTO ENERGY INC Produced Fluid 1,587.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW009
2017 XTO ENERGY INC Produced Fluid 184.40 Bbl INJECTION DISPOSAL WELL 34-133-21076
2017 XTO ENERGY INC Produced Fluid 137.00 Bbl INJECTION DISPOSAL WELL 34-133-24189
2017 XTO ENERGY INC Produced Fluid 120.00 Bbl INJECTION DISPOSAL WELL 34-133-24096
2017 XTO ENERGY INC Produced Fluid 431.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW009
2018 XTO ENERGY INC Produced Fluid 165.74 Bbl INJECTION DISPOSAL WELL 34-133-24189
2018 XTO ENERGY INC Produced Fluid 164.00 Bbl INJECTION DISPOSAL WELL 34-133-24096
2018 XTO ENERGY INC Produced Fluid 805.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW009
2018 XTO ENERGY INC Produced Fluid 80.00 Bbl INJECTION DISPOSAL WELL 34-133-21076
2019 XTO ENERGY INC Produced Fluid 441.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW009
2019 XTO ENERGY INC Produced Fluid 316.00 Bbl INJECTION DISPOSAL WELL 34-133-24189
2019 XTO ENERGY INC Produced Fluid 53.00 Bbl INJECTION DISPOSAL WELL 34-133-24096
2019 XTO ENERGY INC Produced Fluid 75.00 Bbl INJECTION DISPOSAL WELL 34-133-21076

For data sources see[7]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
2231337 Primary Facility 2013-12-16 Drilling/Alteration No Violations Noted
2232416 Primary Facility 2013-12-24 Routine/Partial Inspection No Violations Noted
2313735 Primary Facility 2014-10-15 Routine/Partial Inspection No Violations Noted
2341665 Primary Facility 2015-02-04 Routine/Partial Inspection No Violations Noted
2523279 Primary Facility 2016-09-27 Routine/Partial Inspection No Violations Noted
2598395 Primary Facility 2017-05-30 Routine/Partial Inspection No Violations Noted On site for a partial inspection of the Geibel Unit 4H well.

Well is drilled & completed, and in production. Well tag in place. On site production installed. Well is connected to a gathering pipeline. Site has well development water pipeline equipment on site.

All temporary E/S controls removed. PCSM plan implemented. Site has 100% vegetation.

2634214 Primary Facility 2017-08-30 Routine/Partial Inspection No Violations Noted At the time of inspection, it appears well is shut in. The well integrity was in good condition, with no signs of any leaks or spills at the well. Tubing gauge was reading around 1200 psi. The well is labeled and Emergency Response sign remains posted at the access road entrance. There are 5 line heaters and 6 tanks all contained in a lined, steel dike. There is also a gas buster onsite to destroy any gasses in the tanks.

For data sources see[8]

References