If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 37-019-22264 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.885153,"lon":-80.008444,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Butler | |
Municipality: Connoquenessing Township | |
Operator Name: XTO ENERGY INC | |
Well Pad ID: 151447 | |
Farm/Lease Name: KYNE UNIT 1H | |
License Status: | |
Spud Date: | |
Permit Date: 2014-07-15 | |
Well Type: GAS | |
Unconventional Well: Y | |
Configuration: Horizontal Well | |
Conservation: No | |
Latitude: 40.885153 | |
Longitude: -80.008444 |
Date | Event |
---|---|
2014-07-15 | New Permit Application |
2014-09-15 | Performed Spud Operation |
For data sources see[4]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 2015-06-10 | 2015-07-07 | 5,512 | 11,559,400 | 0 |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | Friction Reducer, Unislick ST-50 | CESI Chemical | Friction Reducer | Other - (non-hazardous) | NA | 70 | 0.0654092 | 70829 |
Petroleum distillates, hydrotreated light | 64742-47-8 | 30 | 0.0280325 | 30355.3 | ||||
Hydrochloric Acid (7.5%) | Axiall | Acidizing | Other - (non-hazardous) | NA | 92.5 | 0.859644 | 930874 | |
Hydrochloric Acid | 7647-01-0 | 7.5 | 0.0369415 | 40002.4 | ||||
Hydrochloric Acid | 7647-01-0 | 7.5 | 0.0174252 | 18869.1 | ||||
Hydrochloric Acid | 7647-01-0 | 7.5 | 0.0153342 | 16604.8 | ||||
Acid Inhibitor, Unihib G | GeoSafe | Acid Inhibitor | Formaldehyde | 50-00-0 | 1 | 0.00000436 | 4.721 | |
Acetophenone | 98-86-2 | 1 | 0.00000436 | 4.721 | ||||
Other - (non-hazardous) | NA | 30 | 0.00311822 | 3376.6 | ||||
Short chained glycol ether | 112-34-5 | 60 | 0.000261607 | 283.284 | ||||
Methanol | 67-56-1 | 5 | 0.00002180 | 23.607 | ||||
Thiourea | 62-56-6 | 1 | 0.00000436 | 4.721 | ||||
2,2-Dibromo-3-nitrilopropionamide | 10222-01-2 | 20 | 0.00207881 | 2251.06 | ||||
Ethoxylated alcohol | 68002-97-1 | 35 | 0.000152604 | 165.249 | ||||
Polyethylene Glycol | 25322-68-3 | 50 | 0.00519704 | 5627.66 | ||||
Hydrochloric Acid (15%) | Axiall | Acidizing | Hydrochloric Acid | 7647-01-0 | 15 | 0.00329473 | 3567.73 | |
Hydrochloric Acid | 7647-01-0 | 15 | 0.00155412 | 1682.89 | ||||
Other - (non-hazardous) | NA | 85 | 0.0352267 | 38145.5 | ||||
Hydrochloric Acid | 7647-01-0 | 15 | 0.00136762 | 1480.94 | ||||
Scale Inhibitor, ScaleHib A | Nalco | Scale Inhibitor | Ethylene Glycol | 107-21-1 | 30 | 0.00630177 | 6823.94 | |
Other - (non-hazardous) | NA | 70 | 0.0147041 | 15922.5 | ||||
Sand (Proppant) | Universal | Proppant | Silica Substrate | NA | 100 | 9.82223 | 10,636,100.0 | |
Water | XTO | Carrier/Base Fluid | Water | 7732-18-5 | 100 | 89.0817 | 96,463,000.0 |
For data sources see[5]
Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
---|---|---|---|---|---|---|---|
2014 | XTO ENERGY INC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2015 | XTO ENERGY INC | 136,832.00 | 88 | 0.00 | 0 | 22.85 | 29 |
2016 | XTO ENERGY INC | 631,090.00 | 331 | 0.00 | 0 | 521.53 | 269 |
2017 | XTO ENERGY INC | 519,864.00 | 337 | 0.00 | 0 | 280.72 | 337 |
2018 | XTO ENERGY INC | 411,411.82 | 332 | 22.10 | 30 | 385.75 | 302 |
2019 | XTO ENERGY INC | 173,611.38 | 187 | 0.00 | 0 | 173.76 | 149 |
For data sources see[6]
Period | Operator | Waste Type | Quantity | Disposal Method | Waste Facility ID |
---|---|---|---|---|---|
2014 | XTO ENERGY INC | Drill Cuttings | 1,504.65 Tons | LANDFILL | 100585 |
2015 | XTO ENERGY INC | Produced Fluid | 844.80 Bbl | INJECTION DISPOSAL WELL | 34-133-24096 |
2015 | XTO ENERGY INC | Produced Fluid | 100.00 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123SW005 |
2015 | XTO ENERGY INC | Drill Cuttings | 282.78 Tons | LANDFILL | 100585 |
2015 | XTO ENERGY INC | Produced Fluid | 13,174.50 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NW009 |
2015 | XTO ENERGY INC | Produced Fluid | 577.00 Bbl | INJECTION DISPOSAL WELL | 34-133-21076 |
2016 | XTO ENERGY INC | Produced Fluid | 6,708.90 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NW009 |
2016 | XTO ENERGY INC | Produced Fluid | 2,342.70 Bbl | INJECTION DISPOSAL WELL | 34-133-24096 |
2016 | XTO ENERGY INC | Produced Fluid | 497.70 Bbl | INJECTION DISPOSAL WELL | 34-133-21076 |
2016 | XTO ENERGY INC | Produced Fluid | 6,923.38 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NW009 |
2016 | XTO ENERGY INC | Other Oil & Gas Wastes | 20.00 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NW009 |
2016 | XTO ENERGY INC | Produced Fluid | 895.00 Bbl | INJECTION DISPOSAL WELL | 34-133-24189 |
2017 | XTO ENERGY INC | Produced Fluid | 1,577.58 Bbl | INJECTION DISPOSAL WELL | 34-133-21076 |
2017 | XTO ENERGY INC | Produced Fluid | 277.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW005 |
2017 | XTO ENERGY INC | Produced Fluid | 1,338.62 Bbl | INJECTION DISPOSAL WELL | 34-133-24189 |
2017 | XTO ENERGY INC | Produced Fluid | 1,885.00 Bbl | INJECTION DISPOSAL WELL | 34-133-24096 |
2017 | XTO ENERGY INC | Produced Fluid | 4,777.62 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NW009 |
2018 | XTO ENERGY INC | Produced Fluid | 4,818.51 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NW009 |
2018 | XTO ENERGY INC | Produced Fluid | 540.00 Bbl | INJECTION DISPOSAL WELL | 34-133-24096 |
2018 | XTO ENERGY INC | Produced Fluid | 80.00 Bbl | INJECTION DISPOSAL WELL | 34-133-24189 |
2019 | XTO ENERGY INC | Soil Contaminated by Oil & Gas Related Spills | 28.95 Tons | RESIDUAL WASTE PROCESSING FACILITY | 101674 |
2019 | XTO ENERGY INC | Soil Contaminated by Oil | 28.95 Tons | RESIDUAL WASTE PROCESSING FACILITY | 101674 |
2019 | XTO ENERGY INC | Other Oil & Gas Wastes | 116.00 Bbl | REUSE (AT WELL PAD) | |
2019 | XTO ENERGY INC | Produced Fluid | 5,725.65 Bbl | INJECTION DISPOSAL WELL | 34-133-24189 |
2019 | XTO ENERGY INC | Produced Fluid | 6,699.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NW009 |
2019 | XTO ENERGY INC | Produced Fluid | 4,016.00 Bbl | INJECTION DISPOSAL WELL | 34-133-21076 |
2019 | XTO ENERGY INC | Produced Fluid | 9,338.00 Bbl | INJECTION DISPOSAL WELL | 34-133-24096 |
For data sources see[7]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
2305392 | Primary Facility | 2014-09-16 | Routine/Partial Inspection | No Violations Noted | |
2308030 | Primary Facility | 2014-09-22 | Routine/Partial Inspection | No Violations Noted | |
2335533 | Primary Facility | 2015-01-13 | Routine/Partial Inspection | No Violations Noted | |
2341639 | Primary Facility | 2015-02-03 | Routine/Partial Inspection | No Violations Noted | |
2390564 | Primary Facility | 2015-07-15 | Drilling/Alteration | No Violations Noted | |
2486245 | Primary Facility | 2016-05-18 | Routine/Partial Inspection | No Violations Noted | |
2686922 | Primary Facility | 2018-01-25 | Routine/Complete Inspection | No Violations Noted | On 1/25/2018, WQS Brian MacQuarrie and WQSS Scott Lux onsite. Site sign maintained at entrance. Access road maintained. Three wells properly tagged and in production. Four 400 bbl tanks installed within stainless steel secondary containment structure. Three gas processing units installed within containment structure. No apparent issues. |
2703102 | Primary Facility | 2018-03-06 | Routine/Partial Inspection | No Violations Noted | At the time of inspection, well was producing. Well integrity was in good condition with no signs of any leaks or spills at the site. Cellar is filled to surface with gravel. The well is properly labeled and the Emergency Response sign remains posted at the entrance to the pad. Pressure was reading somewhere around 550 psi for tubing.
The pad has 3 line heaters located within a lined, steel dike. A separate dike has 4 steel tanks (3 for produced water, 1 for condensate). There was also a gas buster hooked up. |
2835531 | Primary Facility | 2019-02-04 | Routine/Partial Inspection | No Violations Noted | On 2/4/2019, WQS Brian MacQuarrie onsite. While onsite meet with Tom Baun-XTO Energy. Currently, the Kyne 4H (019-22804), Guiher 6H (019-22805) and Kyne 5H (019-22806) are being drilled. Previously, the 1H (019-22264), 2H(019-22265) and 3H(019-22266) were drilled and in production. Production equipment onsite consists of four 400 bbl production tanks installed within stainless steel containment structure and three gas processing units. Soundwall installed around perimeter of well pad. Previously disturbed areas stabilized with vegetative growth. |
For data sources see[8]