If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 37-019-22382 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.76845,"lon":-79.900111,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Butler | |
Municipality: Penn Township | |
Operator Name: PENNENERGY RESOURCES LLC | |
Well Pad ID: 152199 | |
Farm/Lease Name: SHARLOW UNIT | |
License Status: Active | |
Spud Date: 2015-03-02 | |
Permit Date: 2014-12-19 | |
Well Type: GAS | |
Unconventional Well: Y | |
Configuration: Horizontal Well | |
Conservation: No | |
Latitude: 40.768450 | |
Longitude: -79.900111 |
Date | Event |
---|---|
2014-12-19 | New Permit Application |
2015-03-02 | Performed Spud Operation |
For data sources see[4]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 2015-08-24 | 2015-09-07 | 6,111 | 11,876,900 | 0 |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | Scale Inhibitor, LSI-20 | Trican | Scale Inhibitor | organic phosphonic acid salts | Proprietary | 20 | 0.00319419 | 3725.74 |
Methanol | 67-56-1 | 15 | 0.00239564 | 2794.31 | ||||
Breaker, WBO-2 | Trican | Gel Breaker | Sodium Persulfate | 7775-27-1 | 100 | 0.00001800 | 21 | |
Iron Control, FEAC-20 | Trican | Iron Control | Acetic acid | 64-19-7 | 45 | 0.000434631 | 506.959 | |
Citric acid | 77-92-9 | 30 | 0.000289754 | 337.973 | ||||
Acid Inhibitor, AI-11 | Trican | Acid Inhibitor | Prop-2-yn-1-ol | 107-19-7 | 1 | 0.000883479 | 1030.5 | |
Propargyl alcohol derivative | Proprietary | 60 | 0.0530087 | 61830 | ||||
Potassium iodide | 7681-11-0 | 5 | 0.00441739 | 5152.5 | ||||
Sand (Proppant) | Trican | Proppant | Crystalline silica: Quartz (SiO2) | 14808-60-7 | 100 | 14.2499 | 16,621,300.0 | |
Friction Reducer, FR-20 | Trican | Friction Reducer | Mineral oil/ light hydrotreated pet. distillate | 64742-47-8 | 20 | 0.0176696 | 20610 | |
Ethanaminium, N,N,N-trimethyl-2-[(1-oxo-2-propenyl)oxy]-, chloride, polymer with 2-propenamide |
69418-26-4 | 30 | 0.0265044 | 30915 | ||||
Ammonium Chloride | 12125-02-9 | 1 | 0.000883479 | 1030.5 | ||||
9-Octadecenamide,N,N-bis(2-hydroxyethyl)-, (9Z)- | 93-83-4 | 2 | 0.00176696 | 2061 | ||||
Alcohols, C12-16, ethoxylated | 68551-12-2 | 2 | 0.00176696 | 2061 | ||||
Hydrochloric Acid (10%) | Trican | Acidizing | Water | 7732-18-5 | 90 | 0.000703136 | 820.147 | |
Hydrochloric Acid | 7647-01-0 | 10 | 0.00007813 | 91.127 | ||||
Hydrochloric Acid (7.5%) | Trican | Acidizing | Water | 7732-18-5 | 92.5 | 0.61794 | 720773 | |
Hydrochloric Acid | 7647-01-0 | 7.5 | 0.0501033 | 58441.1 | ||||
Chlorine Dioxide | Baker Hughes | Biocide | Chlorine Dioxide | 10049-04-4 | 0.3 | 0.002114 | 1975.53 | |
Water | Rex Energy | Carrier/Base Fluid | Water | 7732-18-5 | 100 | 84.972 | 99,112,400.0 | |
Slurry Gel, WG-111L | Trican | Gel | Mineral oil/ light hydrotreated pet. distillate | 64742-47-8 | 60 | 0.0530087 | 61830 |
For data sources see[5]
Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
---|---|---|---|---|---|---|---|
2015 | RE GAS DEV LLC | 200,103.73 | 43 | 0.00 | 0 | 76.00 | 31 |
2016 | RE GAS DEV LLC | 1,420,744.77 | 355 | 0.00 | 0 | 119.00 | 31 |
2017 | RE GAS DEV LLC | 1,393,910.26 | 353 | 0.00 | 0 | 446.18 | 148 |
2018 | PENNENERGY RESOURCES LLC | 1,126,184.05 | 361 | 0.00 | 0 | 31.22 | 209 |
2019 | PENNENERGY RESOURCES LLC | 973,719.00 | 364 | 0.00 | 0 | 0.00 | 31 |
For data sources see[6]
Period | Operator | Waste Type | Quantity | Disposal Method | Waste Facility ID |
---|---|---|---|---|---|
2015 | RE GAS DEV LLC | Produced Fluid | 900.00 Bbl | CENT WASTE TRT FAC NPDES DISCHARGE | EPA ID: 748-163 |
2015 | RE GAS DEV LLC | Drill Cuttings | 339.60 Tons | LANDFILL | 100585 |
2015 | RE GAS DEV LLC | Fracing Fluid Waste | 950.00 Bbl | CENT WASTE TRT FAC NPDES DISCHARGE | EPA ID: 748-163 |
2015 | RE GAS DEV LLC | Fracing Fluid Waste | 950.00 Bbl | CENT WASTE TRT FAC NPDES | EPA ID: 748-163 |
2015 | RE GAS DEV LLC | Fracturing Fluid Waste | 51.81 Tons | LANDFILL | CID # 28726 |
2015 | RE GAS DEV LLC | Fracing Fluid Waste | 210.00 Bbl | INJECTION DISPOSAL WELL | 34-007-21847 |
2015 | RE GAS DEV LLC | Produced Fluid | 900.00 Bbl | CENT WASTE TRT FAC NPDES | EPA ID: 748-163 |
2016 | RE GAS DEV LLC | Produced Fluid | 1,572.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | WMGR123SW019 |
2016 | RE GAS DEV LLC | Produced Fluid | 385.00 Bbl | INJECTION DISPOSAL WELL | 34-157-25506 |
2016 | RE GAS DEV LLC | Produced Fluid | 789.00 Bbl | INJECTION DISPOSAL WELL | 34-007-21847 |
2016 | RE GAS DEV LLC | Produced Fluid | 1,520.00 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2016 | RE GAS DEV LLC | Produced Fluid | 7,013.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | 3192 |
2017 | RE GAS DEV LLC | Produced Fluid | 902.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | 3192 |
2017 | RE GAS DEV LLC | Produced Fluid | 2,475.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW019 |
2017 | RE GAS DEV LLC | Produced Fluid | 5,644.00 Bbl | INJECTION DISPOSAL WELL | 34-155-24079 |
2017 | RE GAS DEV LLC | Produced Fluid | 4,617.00 Bbl | REUSE (AT WELL PAD) | |
2018 | RE GAS DEV LLC | Produced Fluid | 3,980.00 Bbl | REUSE (AT WELL PAD) | |
2018 | RE GAS DEV LLC | Produced Fluid | 240.00 Bbl | INJECTION DISPOSAL WELL | 34-007-21847 |
2018 | RE GAS DEV LLC | Produced Fluid | 7,197.00 Bbl | INJECTION DISPOSAL WELL | 34-155-24079 |
2019 | PENNENERGY RESOURCES LLC | Produced Fluid | 3,606.00 Bbl | INJECTION DISPOSAL WELL | 34-155-24079 |
2019 | PENNENERGY RESOURCES LLC | Synthetic Liner Materials | 19.49 Tons | RESIDUAL WASTE PROCESSING FACILITY | PAD085690592 |
2019 | PENNENERGY RESOURCES LLC | Produced Fluid | 3,008.00 Bbl | REUSE (AT WELL PAD) | |
2019 | PENNENERGY RESOURCES LLC | Produced Fluid | 87.00 Bbl | INJECTION DISPOSAL WELL | 34-155-23196 |
For data sources see[7]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
2349623 | Primary Facility | 2015-03-03 | Routine/Partial Inspection | No Violations Noted | |
2355793 | Primary Facility | 2015-03-26 | Drilling/Alteration | No Violations Noted | |
2358805 | Primary Facility | 2015-04-02 | Drilling/Alteration | No Violations Noted | |
2692140 | Primary Facility | 2018-02-08 | Routine/Partial Inspection | No Violations Noted | On 2/08/2018, WQS Brian MacQuarrie onsite. Site sign maintained at entrance. Freshwater impoundment fenced in. Two wells tagged and in production. Three 400 bbl ( 2 production and one condensate), installed within stainless steel secondary containment structure. Snow on ground during inspection. |
2776910 | Primary Facility | 2018-09-19 | Routine/Partial Inspection | No Violations Noted | On site for a routine partial inspection.
Well is drilled, completed, and in production. Well tag in place, well permit on site. Well head protected with jersey barriers. Production equipment includes three (3) production tanks, two (2) GPUs, both on containment, and one (1) combustor. Well development impoundment on site. Site has a gathering pipeline in line with production equipment. Site is 100% vegetated and construction E/S controls in place. PCSM E/S not installed. |
For data sources see[8]