If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 37-019-22390 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.843075,"lon":-79.831247,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Butler | |
Municipality: Summit Township | |
Operator Name: XTO ENERGY INC | |
Well Pad ID: 144652 | |
Farm/Lease Name: KOZIK BROTHERS B UNIT 7H | |
License Status: | |
Spud Date: | |
Permit Date: 2015-02-27 | |
Well Type: GAS | |
Unconventional Well: Y | |
Configuration: Horizontal Well | |
Conservation: No | |
Latitude: 40.843075 | |
Longitude: -79.831247 |
Date | Event |
---|---|
2015-02-27 | New Permit Application |
2015-06-04 | Performed Spud Operation |
For data sources see[4]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 2015-11-01 | 2015-11-10 | 6,072 | 13,096,400 | 0 |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | SI-4 | C&J Well Services | Paraffin & Scale Additives | Bis(hexamethylene triaminepenta (methylenephosphonic acid)) |
Proprietary | 10 | 0.001681 | 0 |
HCl Acid (12.5-18.0%), 22 Baume | C&J Well Services | Bulk Acid | Water | 7732-18-5 | 87.5 | 0.031283 | 0 | |
Hydrochloric Acid | 7647-01-0 | 18 | 0.006435 | 0 | ||||
Other Ingredients | C&J Well Services | Other Ingredients | Surfactant Blend | Proprietary | 1 | 0.000599 | 0 | |
Surfactant Blend | Proprietary | 3 | 0.001796 | 0 | ||||
2-Propenamide as residual | 79-06-1 | 0.1 | 0.00006000 | 0 | ||||
Monobromo-3-nitrilopropionamide | 1113-55-9 | 1 | 0.000212 | 0 | ||||
Copolymer | Proprietary | 35 | 0.020952 | 0 | ||||
Proprietary | Proprietary | 0.02 | 0 | 0 | ||||
2,2-Dibromomalonamide | 73003-80-2 | 1 | 0.000212 | 0 | ||||
Water | 7732-18-5 | 48 | 0.000285 | 0 | ||||
Water | 7732-18-5 | 96 | 0.016137 | 0 | ||||
Poly(oxy-1,2-ethanediyl), a-hydro-w-hydroxy-, mono-C10-14-alkyl esthers, phosphates |
68585-36-4 | 3 | 0.001796 | 0 | ||||
Alcohols, C12-18, ethoxylated propoxylated | 69227-21-0 | 2 | 0.001197 | 0 | ||||
Water | 7732-18-5 | 92.5 | 0.507454 | 0 | ||||
Water | 7732-18-5 | 31 | 0.018558 | 0 | ||||
Sodium Hydroxide | 1310-73-2 | 1 | 0.000168 | 0 | ||||
Glycol Ethers | 111-46-6 | 40 | 0.000237 | 0 | ||||
Proprietary | Proprietary | 0.99 | 0.00000600 | 0 | ||||
Water | 7732-18-5 | 32 | 0.006788 | 0 | ||||
Acid Inhibitor 2 (AI-2) | C&J Well Services | Acid Corrosion Inhibitors | Tar bases, quinoline derivs, benzyl chloride-quaternized | 72480-70-7 | 10 | 0.00005900 | 0 | |
Proprietary | Proprietary | 15 | 0.00008900 | 0 | ||||
Isopropyl Alcohol | 67-63-0 | 20 | 0.000119 | 0 | ||||
Propargyl Alcohol | 107-19-7 | 20 | 0.000119 | 0 | ||||
2-Butoxyethanol | 111-76-2 | 20 | 0.000119 | 0 | ||||
FR-16 | C&J Well Services | Friction Reducer | Distillates (Petroleum), Hydrotreated Light | 64742-47-8 | 45 | 0.026939 | 0 | |
Ethylene Glycol | 107-21-1 | 5 | 0.002993 | 0 | ||||
Sand | C&J Well Services | Sand - Bulk - Pennsylvania | Aluminum Oxide | 1344-28-1 | 1.1 | 0.011197 | 0 | |
Crystalline Silica, quartz | 14808-60-7 | 99.9 | 1.01688 | 0 | ||||
Aluminum Oxide | 1344-28-1 | 1.1 | 0.067112 | 0 | ||||
Crystalline Silica, quartz | 14808-60-7 | 99.9 | 3.00904 | 0 | ||||
Crystalline Silica, quartz | 14808-60-7 | 99.9 | 6.09501 | 0 | ||||
Iron Oxide | 1309-37-1 | 0.1 | 0.003012 | 0 | ||||
Titanium Oxide | 13463-67-7 | 0.1 | 0.003012 | 0 | ||||
Aluminum Oxide | 1344-28-1 | 1.1 | 0.033133 | 0 | ||||
Iron Oxide | 1309-37-1 | 0.1 | 0.001018 | 0 | ||||
Titanium Oxide | 13463-67-7 | 0.1 | 0.006101 | 0 | ||||
Titanium Oxide | 13463-67-7 | 0.1 | 0.001018 | 0 | ||||
Iron Oxide | 1309-37-1 | 0.1 | 0.006101 | 0 | ||||
Water | XTO Energy/ExxonMobil | Water | Water | 7732-18-5 | 100 | 89.1861 | 0 | |
HCl Acid (0-7.5%), 22 Baume | C&J Well Services | Bulk Acid | Hydrochloric Acid | 7647-01-0 | 7.5 | 0.041145 | 0 | |
AQUCAR DB 20 | C&J Well Services | Biocides | 2,2-Dibromo-3-nitrilo-propionamide (DBNPA) | 10222-01-2 | 20 | 0.004242 | 0 | |
Dibromoacetonitrile | 3252-43-5 | 3 | 0.000636 | 0 | ||||
Sodium bromide | 7647-15-6 | 4 | 0.000848 | 0 | ||||
Polyethylene glycol | 25322-68-3 | 54.5 | 0.01156 | 0 |
For data sources see[5]
Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
---|---|---|---|---|---|---|---|
2015 | XTO ENERGY INC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2016 | XTO ENERGY INC | 531,665.00 | 256 | 0.00 | 0 | 1,714.38 | 239 |
2017 | XTO ENERGY INC | 1,004,107.00 | 357 | 0.00 | 0 | 726.61 | 327 |
2018 | XTO ENERGY INC | 831,908.11 | 336 | 2.50 | 30 | 118.46 | 282 |
2019 | XTO ENERGY INC | 681,552.96 | 363 | 0.00 | 0 | 35.41 | 243 |
For data sources see[6]
Period | Operator | Waste Type | Quantity | Disposal Method | Waste Facility ID |
---|---|---|---|---|---|
2015 | XTO ENERGY INC | Drill Cuttings | 1,387.27 Tons | LANDFILL | 100585 |
2015 | XTO ENERGY INC | Drilling Fluid Waste | 323.00 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NW009 |
2016 | XTO ENERGY INC | Produced Fluid | 12,889.05 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NW009 |
2016 | XTO ENERGY INC | Filter Socks | 0.05 Tons | LANDFILL | 100403 |
2016 | XTO ENERGY INC | Produced Fluid | 330.00 Bbl | INJECTION DISPOSAL WELL | 34-133-24096 |
2016 | XTO ENERGY INC | Produced Fluid | 120.00 Bbl | INJECTION DISPOSAL WELL | 34-133-21076 |
2016 | XTO ENERGY INC | Fracturing Fluid Waste | 69.78 Tons | RESIDUAL WASTE TRANSFER FACILITY | 101674 |
2016 | XTO ENERGY INC | Produced Fluid | 6,784.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NW009 |
2016 | XTO ENERGY INC | Produced Fluid | 227.30 Bbl | INJECTION DISPOSAL WELL | 34-133-24189 |
2017 | XTO ENERGY INC | Produced Fluid | 2,303.36 Bbl | INJECTION DISPOSAL WELL | 34-133-21076 |
2017 | XTO ENERGY INC | Produced Fluid | 422.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW005 |
2017 | XTO ENERGY INC | Produced Fluid | 2,678.17 Bbl | INJECTION DISPOSAL WELL | 34-133-24189 |
2017 | XTO ENERGY INC | Produced Fluid | 12,437.57 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NW009 |
2017 | XTO ENERGY INC | Produced Fluid | 1,034.93 Bbl | INJECTION DISPOSAL WELL | 34-133-24096 |
2018 | XTO ENERGY INC | Produced Fluid | 80.00 Bbl | INJECTION DISPOSAL WELL | 34-133-24189 |
2018 | XTO ENERGY INC | Produced Fluid | 10,996.76 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NW009 |
2018 | XTO ENERGY INC | Produced Fluid | 752.74 Bbl | INJECTION DISPOSAL WELL | 34-133-24096 |
2019 | XTO ENERGY INC | Produced Fluid | 4,163.96 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NW009 |
2019 | XTO ENERGY INC | Produced Fluid | 2,482.86 Bbl | INJECTION DISPOSAL WELL | 34-133-24096 |
2019 | XTO ENERGY INC | Produced Fluid | 1,545.00 Bbl | INJECTION DISPOSAL WELL | 34-133-24189 |
2019 | XTO ENERGY INC | Produced Fluid | 1,087.45 Bbl | INJECTION DISPOSAL WELL | 34-133-21076 |
For data sources see[7]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
2377854 | Primary Facility | 2015-06-09 | Routine/Partial Inspection | No Violations Noted | |
2383831 | Primary Facility | 2015-06-24 | Drilling/Alteration | No Violations Noted | |
2384725 | Primary Facility | 2015-07-02 | Drilling/Alteration | No Violations Noted | |
2386676 | Primary Facility | 2015-07-09 | Routine/Partial Inspection | No Violations Noted | |
2569616 | Primary Facility | 2017-02-28 | Routine/Partial Inspection | No Violations Noted | |
2692736 | Primary Facility | 2018-02-09 | Routine/Partial Inspection | No Violations Noted | On 2//09/2018, WQS Brian MacQuarrie onsite. Site sign posted and maintained at entrance. Five wells properly tagged and in production. Six 400 bbl tanks installed within secondary containment. Five gas processing units installed within secondary containment. Snow on ground during inspection. No apparent issues. |
For data sources see[8]