X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

37-019-22426

Well Details

Well ID: 37-019-22426
Loading map...
Country: United States
State: Pennsylvania
County: Butler
Municipality: Clay Township
Operator Name: PENNENERGY RESOURCES LLC
Well Pad ID: 152443
Farm/Lease Name: FLEEGER 2 UNIT 1H
License Status:
Spud Date: 2015-07-04
Permit Date: 2015-04-22
Well Type: GAS
Unconventional Well: Y
Configuration: Horizontal Well
Conservation: No
Latitude: 40.976703
Longitude: -79.892936

For data sources see[1][2][3]

Well History

Date Event
2015-04-22 New Permit Application
2015-07-03 Performed Spud Operation
2015-10-23 Drilling Completion
2016-01-23 Deviated
2016-02-22 Perforation
2016-02-22 Performed Stage 1 of Stimulation
2016-02-22 Performed Stage 2 of Stimulation
2016-02-26 Performed Stage 3 of Stimulation
2016-02-27 Performed Stage 4 of Stimulation
2016-02-27 Performed Stage 5 of Stimulation
2016-02-28 Performed Stage 6 of Stimulation
2016-02-29 Performed Stage 7 of Stimulation
2016-03-01 Perforation
2016-03-01 Performed Stage 8 of Stimulation
2016-03-02 Performed Stage 9 of Stimulation
2016-03-03 Performed Stage 10 of Stimulation
2016-03-04 Performed Stage 11 of Stimulation
2016-03-05 Performed Stage 13 of Stimulation
2016-03-06 Perforation
2016-03-06 Performed Stage 14 of Stimulation
2016-03-06 Performed Stage 15 of Stimulation
2016-03-07 Performed Stage 16 of Stimulation
2016-03-08 Performed Stage 17 of Stimulation
2016-03-09 Performed Stage 18 of Stimulation
2016-03-09 Performed Stage 19 of Stimulation
2016-03-10 Performed Stage 20 of Stimulation
2016-03-11 Performed Stage 21 of Stimulation
2016-03-11 Performed Stage 22 of Stimulation
2016-03-12 Performed Stage 23 of Stimulation
2016-03-13 Perforation
2016-03-13 Performed Stage 24 of Stimulation
2016-03-13 Performed Stage 25 of Stimulation
2016-03-14 Performed Stage 26 of Stimulation
2016-03-15 Performed Stage 27 of Stimulation
2016-03-16 Performed Stage 28 of Stimulation
2016-03-16 Performed Stage 29 of Stimulation
2016-03-17 Performed Stage 30 of Stimulation
2016-03-18 Performed Stage 31 of Stimulation
2016-03-18 Performed Stage 32 of Stimulation
2016-03-20 Perforation
2016-03-20 Performed Stage 33 of Stimulation
2016-03-20 Performed Stage 34 of Stimulation
2016-03-22 Performed Stage 35 of Stimulation
2016-03-29 Perforation

For data sources see[4]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2016-02-22 2016-03-29 5,519 19,837,000 0

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Sand (Proppant) Keane Proppant Crystalline silica: Quartz (SiO2) 14808-60-7 100 11.9186 22,581,300.0
Breaker, WBO-2 Keane Gel Breaker Sodium Persulfate 7775-27-1 100 0.00000929 17.6
Hydrochloric Acid (7.5%) Keane Acidizing Water 7732-18-5 92.5 0.581216 1,101,180.0
Hydrochloric Acid 7647-01-0 7.5 0.0471256 89285
Scaletrol 720 Baker Hughes Scale Inhibitor Ethylene Glycol 107-21-1 30 0.00959908 11747.6
2-propenoic, polymer with sodium phosphinate, sodium salt 71050-62-9 0 0.00639939 7831.75
Sodium Chloride 7647-14-5 0 0.000319969 391.587
Calcium Chloride 10043-52-4 5 0.00159985 1957.94
Potassium Chloride 7447-40-7 0 0.000319969 391.587
Water 7732-18-5 0 0.0159985 19579.4
Friction Reducer, FR PRO 200 ECM Friction Reducer Ethoxylated alcohols 68551-12-2 4 0.00308 5694.52
Water 7732-18-5 50 0.03855 71181.5
Ethoxylated alcohols 68002-97-1 4 0.00308 5694.52
2-Propenoic acid, ammonium

salt,
polymer with 2- propenamide, sodium salt.

910644-97-2 45 0.03469 64063.4
Hydrotreated Petroleum

Distillate

64742-47-8 35 0.02698 49827.1
Ethoxylated alcohols 68439-50-9 4 0.00308 5694.52
Ammonium acetate 631-61-8 12 0.00925 17083.6
Acid Inhibitor, AI-11 Keane Acid Inhibitor Potassium iodide 7681-11-0 5 0.00004542 86.058
Propargyl alcohol derivative Proprietary 60 0.000545067 1032.69
Prop-2-yn-1-ol 107-19-7 1 0.00000908 17.212
Slurry Gel, WG-111L Keane Gel Mineral oil/ light hydrotreated pet. distillate 64742-47-8 60 0.000769199 1457.34
Iron Control, FEAC-20 Keane Iron Control Citric acid 77-92-9 30 0.000643179 1218.58
Acetic acid 64-19-7 45 0.000964769 1827.87
Water Rex Energy Carrier/Base Fluid Water 7732-18-5 100 87.3735 165,539,000.0
Chlorine Dioxide Baker Hughes Biocide Chlorine Dioxide 10049-04-4 0.3 0.00202 2471.77

For data sources see[5]

Stimulation Data

Stimulation Date Phase Number Chemical Agent Volume (gal) Treating Pressure (psi) Breakdown Pressure (psi)
2016-02-22 1 Sand 0 7,262 5,922
2016-02-22 2 Sand 0 7,329 5,213
2016-02-26 3 Sand 0 7,955 4,726
2016-02-27 4 Sand 0 6,801 5,032
2016-02-27 5 Sand 0 7,905 4,737
2016-02-28 6 Sand 0 7,388 4,857
2016-02-29 7 Sand 0 6,720 4,978
2016-03-01 8 Sand 0 7,279 5,085
2016-03-02 9 Sand 0 7,528 4,884
2016-03-03 10 Sand 0 7,432 5,715
2016-03-04 11 Sand 0 7,009 4,860
12 Sand 0 7,297 5,139
2016-03-05 13 Sand 0 7,699 5,330
2016-03-06 14 Sand 0 7,223 5,187
2016-03-06 15 Sand 0 6,519 5,419
2016-03-07 16 Sand 0 6,730 4,888
2016-03-08 17 Sand 0 6,847 5,785
2016-03-09 18 Sand 0 6,953 5,474
2016-03-09 19 Sand 0 6,920 5,217
2016-03-10 20 Sand 0 6,854 5,369
2016-03-11 21 Sand 0 6,888 5,751
2016-03-11 22 Sand 0 6,595 5,547
2016-03-12 23 Sand 0 6,720 5,665
2016-03-13 24 Sand 0 6,895 5,717
2016-03-13 25 Sand 0 6,218 5,539
2016-03-14 26 Sand 0 6,884 4,835
2016-03-15 27 Sand 0 6,654 5,482
2016-03-16 28 Sand 0 6,411 5,646
2016-03-16 29 Sand 0 6,566 5,296
2016-03-17 30 Sand 0 6,413 5,784
2016-03-18 31 Sand 0 6,455 5,354
2016-03-18 32 Sand 0 6,406 5,281
2016-03-20 33 Sand 0 6,387 5,623
2016-03-20 34 Sand 0 5,836 5,571
2016-03-22 35 Sand 0 6,540 5,542

For data sources see[6]

Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2015 RE GAS DEV LLC 0.00 0 0.00 0 0.00 0
2016 RE GAS DEV LLC 326,790.03 83 0.00 0 3,290.68 85
2017 RE GAS DEV LLC 1,046,167.23 352 0.00 0 7,647.71 352
2018 PENNENERGY RESOURCES LLC 835,510.91 357 0.00 0 6,672.37 357
2019 PENNENERGY RESOURCES LLC 755,197.00 355 0.00 0 5,428.00 355

For data sources see[7]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2015 RE GAS DEV LLC Drill Cuttings 1,220.08 Tons LANDFILL 100585
2016 RE GAS DEV LLC Produced Fluid 6,984.00 Bbl REUSE OTHER THAN ROAD SPREADING
2016 RE GAS DEV LLC Produced Fluid 776.23 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR123SW019
2016 RE GAS DEV LLC Produced Fluid 2,727.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW019
2016 RE GAS DEV LLC Produced Fluid 104.00 Bbl INJECTION DISPOSAL WELL 34-157-25506
2016 RE GAS DEV LLC Produced Fluid 620.00 Bbl INJECTION DISPOSAL WELL 34-007-21847
2017 RE GAS DEV LLC Produced Fluid 3,041.10 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW019
2017 RE GAS DEV LLC Produced Fluid 200.00 Bbl INJECTION DISPOSAL WELL 34-007-21847
2017 RE GAS DEV LLC Produced Fluid 180.00 Bbl INJECTION DISPOSAL WELL 34-133-24462
2017 RE GAS DEV LLC Produced Fluid 8,121.50 Bbl REUSE (AT WELL PAD)
2017 RE GAS DEV LLC Produced Fluid 6,465.00 Bbl INJECTION DISPOSAL WELL 34-155-24079
2018 RE GAS DEV LLC Produced Fluid 2,112.00 Bbl REUSE (AT WELL PAD)
2018 RE GAS DEV LLC Produced Fluid 240.00 Bbl INJECTION DISPOSAL WELL 34-007-21847
2018 RE GAS DEV LLC Produced Fluid 6,535.00 Bbl INJECTION DISPOSAL WELL 34-155-24079
2019 PENNENERGY RESOURCES LLC Produced Fluid 2,646.90 Bbl REUSE (AT WELL PAD)
2019 PENNENERGY RESOURCES LLC Produced Fluid 2,564.35 Bbl INJECTION DISPOSAL WELL 34-155-24079
2019 PENNENERGY RESOURCES LLC Waste Water Treatment Sludge 0.40 Tons RESIDUAL WASTE PROCESSING FACILITY 2014-541
2019 PENNENERGY RESOURCES LLC Produced Fluid 80.00 Bbl INJECTION DISPOSAL WELL 34-155-23196

For data sources see[8]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
2385362 Primary Facility 2015-07-06 Routine/Partial Inspection No Violations Noted
2393927 Primary Facility 2015-07-30 Drilling/Alteration No Violations Noted
2418863 Primary Facility 2015-10-26 Routine/Partial Inspection No Violations Noted
2496022 Primary Facility 2016-06-27 Administrative/File Review No Violations Noted
2539611 Primary Facility 2016-11-29 Administrative/File Review No Violations Noted
2840109 Primary Facility 2019-02-05 Routine/Partial Inspection No Violations Noted On site for a routine partial inspection.

Well is drilled, completed, and in production. Well tag in place. Production equipment in place (tanks, GPU) and on containment. Gathering pipeline header on site.

PCSM BMPs in place, maintained, and functioning. Site stabilized with vegetation.

For data sources see[9]

References