X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

37-019-22428

Well Details

Well ID: 37-019-22428
Loading map...
Country: United States
State: Pennsylvania
County: Butler
Municipality: Clay Township
Operator Name: PENNENERGY RESOURCES LLC
Well Pad ID: 152443
Farm/Lease Name: FLEEGER 2 UNIT
License Status: Active
Spud Date: 2015-07-05
Permit Date: 2015-04-22
Well Type: GAS
Unconventional Well: Y
Configuration: Horizontal Well
Conservation: No
Latitude: 40.976706
Longitude: -79.892883

For data sources see[1][2][3]

Well History

Date Event
2015-04-22 New Permit Application
2015-07-03 Performed Spud Operation

For data sources see[4]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2016-02-22 2016-03-30 5,383 14,091,500 0

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Slurry Gel, WG-111L Keane Gel Mineral oil/ light hydrotreated pet. distillate 64742-47-8 60 0.00553021 7379.22
Iron Control, FEAC-20 Keane Iron Control Acetic acid 64-19-7 45 0.00139477 1861.1
Citric acid 77-92-9 30 0.000929845 1240.73
Breaker, WBO-2 Keane Gel Breaker Sodium Persulfate 7775-27-1 100 0.000103946 138.7
Hydrochloric Acid (7.5%) Keane Acidizing Water 7732-18-5 92.5 0.840264 1,121,200.0
Hydrochloric Acid 7647-01-0 7.5 0.0681295 90908.3
Friction Reducer, FR PRO 200 ECM Friction Reducer Ethoxylated alcohols 68551-12-2 4 0.00308 3848.38
2-Propenoic acid, ammonium

salt,
polymer with 2- propenamide, sodium salt.

910644-97-2 45 0.03469 43294.3
Water 7732-18-5 50 0.03855 48104.8
Ammonium acetate 631-61-8 12 0.00925 11545.1
Hydrotreated Petroleum

Distillate

64742-47-8 35 0.02698 33673.3
Ethoxylated alcohols 68439-50-9 4 0.00308 3848.38
Ethoxylated alcohols 68002-97-1 4 0.00308 3848.38
Sand (Proppant) Keane Proppant Crystalline silica: Quartz (SiO2) 14808-60-7 100 10.8775 14,514,300.0
Scaletrol 720 Baker Hughes Scale Inhibitor 2-propenoic, polymer with sodium phosphinate, sodium salt 71050-62-9 0 0.00634055 7336.21
Sodium Chloride 7647-14-5 0 0.000317028 366.811
Ethylene Glycol 107-21-1 30 0.00951083 11004.3
Calcium Chloride 10043-52-4 5 0.00158514 1834.05
Water 7732-18-5 0 0.0158514 18340.5
Potassium Chloride 7447-40-7 0 0.000317028 366.811
Acid Inhibitor, AI-11 Keane Acid Inhibitor Potassium iodide 7681-11-0 5 0.00006567 87.623
Prop-2-yn-1-ol 107-19-7 1 0.00001313 17.525
Propargyl alcohol derivative Proprietary 60 0.000788004 1051.47
Chlorine Dioxide Baker Hughes Biocide Chlorine Dioxide 10049-04-4 0.3 0.001804 2086.86
Water Rex Energy Carrier/Base Fluid Water 7732-18-5 100 88.1283 117,594,000.0

For data sources see[5]

Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2015 RE GAS DEV LLC 0.00 0 0.00 0 0.00 0
2016 RE GAS DEV LLC 300,647.03 82 0.00 0 4,053.03 85
2017 RE GAS DEV LLC 866,691.27 358 0.00 0 8,764.39 358
2018 PENNENERGY RESOURCES LLC 670,421.97 357 0.00 0 6,542.54 357
2019 PENNENERGY RESOURCES LLC 595,457.00 355 0.00 0 5,450.00 355

For data sources see[6]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2015 RE GAS DEV LLC Drill Cuttings 822.23 Tons LANDFILL 100585
2015 RE GAS DEV LLC Produced Fluid 241.00 Bbl INJECTION DISPOSAL WELL 34-157-25506
2016 RE GAS DEV LLC Produced Fluid 90.00 Bbl INJECTION DISPOSAL WELL 34-133-24462
2016 RE GAS DEV LLC Produced Fluid 6,199.00 Bbl REUSE OTHER THAN ROAD SPREADING
2016 RE GAS DEV LLC Produced Fluid 947.53 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR123SW019
2016 RE GAS DEV LLC Produced Fluid 750.00 Bbl INJECTION DISPOSAL WELL 34-007-21847
2016 RE GAS DEV LLC Produced Fluid 2,227.50 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW019
2016 RE GAS DEV LLC Fracturing Fluid Waste 200.00 Bbl INJECTION DISPOSAL WELL 34-007-21847
2016 RE GAS DEV LLC Fracturing Fluid Waste 181.16 Tons LANDFILL 100585
2017 RE GAS DEV LLC Produced Fluid 4,448.88 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW019
2017 RE GAS DEV LLC Produced Fluid 180.00 Bbl INJECTION DISPOSAL WELL 34-007-21847
2017 RE GAS DEV LLC Produced Fluid 80.00 Bbl INJECTION DISPOSAL WELL 34-099-20974
2017 RE GAS DEV LLC Produced Fluid 180.00 Bbl INJECTION DISPOSAL WELL 34-133-24462
2017 RE GAS DEV LLC Produced Fluid 7,133.00 Bbl INJECTION DISPOSAL WELL 34-155-24079
2017 RE GAS DEV LLC Produced Fluid 6,320.00 Bbl REUSE (AT WELL PAD)
2018 RE GAS DEV LLC Produced Fluid 240.00 Bbl INJECTION DISPOSAL WELL 34-007-21847
2018 RE GAS DEV LLC Produced Fluid 2,966.00 Bbl REUSE (AT WELL PAD)
2018 RE GAS DEV LLC Produced Fluid 5,669.00 Bbl INJECTION DISPOSAL WELL 34-155-24079
2019 PENNENERGY RESOURCES LLC Produced Fluid 90.00 Bbl INJECTION DISPOSAL WELL 34-155-23196
2019 PENNENERGY RESOURCES LLC Produced Fluid 2,063.07 Bbl REUSE (AT WELL PAD)
2019 PENNENERGY RESOURCES LLC Produced Fluid 6,938.56 Bbl INJECTION DISPOSAL WELL 34-155-24079
2019 PENNENERGY RESOURCES LLC Waste Water Treatment Sludge 0.31 Tons RESIDUAL WASTE PROCESSING FACILITY 2014-541

For data sources see[7]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
2385363 Primary Facility 2015-07-06 Routine/Partial Inspection No Violations Noted
2393916 Primary Facility 2015-07-27 Routine/Partial Inspection No Violations Noted
2416348 Primary Facility 2015-10-19 Routine/Partial Inspection No Violations Noted
2496024 Primary Facility 2016-06-27 Administrative/File Review No Violations Noted
2511389 Primary Facility 2016-08-16 Administrative/File Review No Violations Noted
2539613 Primary Facility 2016-11-29 Administrative/File Review No Violations Noted
2840112 Primary Facility 2019-02-05 Routine/Partial Inspection No Violations Noted On site for a routine partial inspection.

Well is drilled, completed, and in production. Well tag in place. Production equipment in place (tanks, GPU) and on containment. Gathering pipeline header on site.

BMPs in place, maintained, and functioning. Site stabilized with vegetation. Snow cover at time of inspection.

For data sources see[8]

References