X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

37-019-22429

Well Details

Well ID: 37-019-22429
Loading map...
Country: United States
State: Pennsylvania
County: Butler
Municipality: Clay Township
Operator Name: PENNENERGY RESOURCES LLC
Well Pad ID: 152443
Farm/Lease Name: FLEEGER 2 UNIT 3H
License Status:
Spud Date: 2015-07-06
Permit Date: 2015-04-22
Well Type: GAS
Unconventional Well: Y
Configuration: Horizontal Well
Conservation: No
Latitude: 40.976708
Longitude: -79.892828

For data sources see[1][2][3]

Well History

Date Event
2015-03-29 Perforation
2015-04-22 New Permit Application
2015-07-03 Performed Spud Operation
2015-09-21 New Permit Application
2015-10-07 Drilling Completion
2016-02-22 Perforation
2016-02-22 Performed Stage 1 of Stimulation
2016-02-23 Performed Stage 2 of Stimulation
2016-02-26 Performed Stage 3 of Stimulation
2016-02-29 Performed Stage 4 of Stimulation
2016-03-01 Performed Stage 5 of Stimulation
2016-03-01 Performed Stage 6 of Stimulation
2016-03-02 Performed Stage 7 of Stimulation
2016-03-02 Performed Stage 8 of Stimulation
2016-03-03 Perforation
2016-03-03 Performed Stage 10 of Stimulation
2016-03-03 Performed Stage 9 of Stimulation
2016-03-04 Performed Stage 11 of Stimulation
2016-03-04 Performed Stage 12 of Stimulation
2016-03-05 Performed Stage 13 of Stimulation
2016-03-06 Performed Stage 14 of Stimulation
2016-03-07 Performed Stage 15 of Stimulation
2016-03-08 Performed Stage 16 of Stimulation
2016-03-08 Performed Stage 17 of Stimulation
2016-03-09 Perforation
2016-03-09 Performed Stage 18 of Stimulation
2016-03-10 Performed Stage 19 of Stimulation
2016-03-10 Performed Stage 20 of Stimulation
2016-03-11 Performed Stage 21 of Stimulation
2016-03-12 Performed Stage 22 of Stimulation
2016-03-12 Performed Stage 23 of Stimulation
2016-03-13 Performed Stage 24 of Stimulation
2016-03-14 Perforation
2016-03-14 Performed Stage 25 of Stimulation
2016-03-15 Performed Stage 26 of Stimulation
2016-03-15 Performed Stage 27 of Stimulation
2016-03-16 Performed Stage 28 of Stimulation
2016-03-17 Performed Stage 29 of Stimulation
2016-03-19 Performed Stage 30 of Stimulation
2016-03-20 Performed Stage 31 of Stimulation
2016-03-21 Performed Stage 32 of Stimulation
2016-03-21 Performed Stage 33 of Stimulation
2016-03-22 Perforation
2016-03-22 Performed Stage 34 of Stimulation
2016-03-23 Performed Stage 35 of Stimulation
2018-01-24 Deviated

For data sources see[4]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2016-02-22 2016-03-30 5,285 20,157,500 0

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Hydrochloric Acid (7.5%) Keane Acidizing Hydrochloric Acid 7647-01-0 7.5 0.0495689 95129.1
Water 7732-18-5 92.5 0.61135 1,173,260.0
Scaletrol 720 Baker Hughes Scale Inhibitor 2-propenoic, polymer with sodium phosphinate, sodium salt 71050-62-9 0 0.00640697 10849.8
Sodium Chloride 7647-14-5 0 0.000320349 542.49
Calcium Chloride 10043-52-4 5 0.001602 2712.45
Potassium Chloride 7447-40-7 0 0.000320349 542.49
Ethylene Glycol 107-21-1 30 0.00961 16274.7
Water 7732-18-5 0 0.0160174 27124.5
Water Rex Energy Carrier/Base Fluid Water 7732-18-5 100 87.6513 168,214,000.0
Iron Control, FEAC-20 Keane Iron Control Citric acid 77-92-9 30 0.000676526 1298.34
Acetic acid 64-19-7 45 0.00101479 1947.51
Sand (Proppant) Keane Proppant Crystalline silica: Quartz (SiO2) 14808-60-7 100 11.604 22,269,600.0
Breaker, WBO-2 Keane Gel Breaker Sodium Persulfate 7775-27-1 100 0.00007045 135.2
Friction Reducer, FR PRO 200 ECM Friction Reducer Hydrotreated Petroleum

Distillate

64742-47-8 35 0.02698 49928
2-Propenoic acid, ammonium

salt,
polymer with 2- propenamide, sodium salt.

910644-97-2 45 0.03469 64193.1
Water 7732-18-5 50 0.03855 71325.7
Ammonium acetate 631-61-8 12 0.00925 17118.2
Ethoxylated alcohols 68002-97-1 4 0.00308 5706.06
Ethoxylated alcohols 68551-12-2 4 0.00308 5706.06
Ethoxylated alcohols 68439-50-9 4 0.00308 5706.06
Slurry Gel, WG-111L Keane Gel Mineral oil/ light hydrotreated pet. distillate 64742-47-8 60 0.00369524 7091.64
Acid Inhibitor, AI-11 Keane Acid Inhibitor Propargyl alcohol derivative Proprietary 60 0.000573327 1100.29
Potassium iodide 7681-11-0 5 0.00004778 91.691
Prop-2-yn-1-ol 107-19-7 1 0.00000956 18.338
Chlorine Dioxide Baker Hughes Biocide Chlorine Dioxide 10049-04-4 0.3 0.001785 3022.19

For data sources see[5]

Stimulation Data

Stimulation Date Phase Number Chemical Agent Volume (gal) Treating Pressure (psi) Breakdown Pressure (psi)
2016-02-22 1 Sand 17,988,978 7,310 5,244
2016-02-23 2 Sand 17,988,978 7,972 5,339
2016-02-26 3 Sand 17,988,978 7,011 5,558
2016-02-29 4 Sand 17,988,978 7,579 5,409
2016-03-01 5 Sand 17,988,978 7,150 5,698
2016-03-01 6 Sand 17,988,978 6,695 5,415
2016-03-02 7 Sand 17,988,978 7,296 5,271
2016-03-02 8 Sand 17,988,978 6,859 5,534
2016-03-03 9 Sand 17,988,978 6,555 5,573
2016-03-03 10 Sand 17,988,978 6,648 5,607
2016-03-04 11 Sand 17,988,978 7,425 5,334
2016-03-04 12 Sand 17,988,978 8,591 5,185
2016-03-05 13 Sand 17,988,978 6,457 4,775
2016-03-06 14 Sand 17,988,978 7,121 5,507
2016-03-07 15 Sand 17,988,978 7,163 5,619
2016-03-08 16 Sand 17,988,978 6,885 5,253
2016-03-08 17 Sand 17,988,978 6,377 5,646
2016-03-09 18 Sand 17,988,978 6,566 5,364
2016-03-10 19 Sand 17,988,978 7,049 5,667
2016-03-10 20 Sand 17,988,978 6,525 5,715
2016-03-11 21 Sand 17,988,978 6,884 5,587
2016-03-12 22 Sand 17,988,978 6,753 5,802
2016-03-12 23 Sand 17,988,978 6,340 5,945
2016-03-13 24 Sand 17,988,978 6,896 5,699
2016-03-14 25 Sand 17,988,978 6,655 5,712
2016-03-15 26 Sand 17,988,978 6,811 5,187
2016-03-15 27 Sand 17,988,978 5,967 5,547
2016-03-16 28 Sand 17,988,978 5,870 5,656
2016-03-17 29 Sand 17,988,978 6,984 6,082
2016-03-19 30 Sand 17,988,978 6,428 5,221
2016-03-20 31 Sand 17,988,978 6,332 5,649
2016-03-21 32 Sand 17,988,978 6,414 6,316
2016-03-21 33 Sand 17,988,978 6,471 6,130
2016-03-22 34 Sand 17,988,978 6,326 6,060
2016-03-23 35 Sand 17,988,978 6,462 5,461

For data sources see[6]

Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2015 RE GAS DEV LLC 0.00 0 0.00 0 0.00 0
2016 RE GAS DEV LLC 251,212.89 83 0.00 0 4,062.63 87
2017 RE GAS DEV LLC 795,128.62 357 0.00 0 7,590.95 357
2018 PENNENERGY RESOURCES LLC 632,282.62 357 0.00 0 6,261.31 357
2019 PENNENERGY RESOURCES LLC 563,665.00 354 0.00 0 4,768.00 354

For data sources see[7]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2015 RE GAS DEV LLC Drill Cuttings 1,012.28 Tons LANDFILL 100585
2016 RE GAS DEV LLC Produced Fluid 9,813.50 Bbl REUSE OTHER THAN ROAD SPREADING
2016 RE GAS DEV LLC Produced Fluid 1,284.38 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR123SW019
2016 RE GAS DEV LLC Produced Fluid 3,376.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW019
2016 RE GAS DEV LLC Produced Fluid 210.00 Bbl INJECTION DISPOSAL WELL 34-157-25506
2016 RE GAS DEV LLC Produced Fluid 1,612.00 Bbl INJECTION DISPOSAL WELL 34-007-21847
2017 RE GAS DEV LLC Produced Fluid 7,144.98 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW019
2017 RE GAS DEV LLC Produced Fluid 270.00 Bbl INJECTION DISPOSAL WELL 34-007-21847
2017 RE GAS DEV LLC Produced Fluid 90.00 Bbl INJECTION DISPOSAL WELL 34-133-24462
2017 RE GAS DEV LLC Produced Fluid 9,746.50 Bbl REUSE (AT WELL PAD)
2017 RE GAS DEV LLC Produced Fluid 9,369.00 Bbl INJECTION DISPOSAL WELL 34-155-24079
2018 RE GAS DEV LLC Produced Fluid 2,844.00 Bbl REUSE (AT WELL PAD)
2018 RE GAS DEV LLC Produced Fluid 200.00 Bbl INJECTION DISPOSAL WELL 34-157-25507
2018 RE GAS DEV LLC Produced Fluid 80.00 Bbl INJECTION DISPOSAL WELL 34-007-21847
2018 RE GAS DEV LLC Produced Fluid 7,894.00 Bbl INJECTION DISPOSAL WELL 34-155-24079
2019 PENNENERGY RESOURCES LLC Produced Fluid 1,979.79 Bbl REUSE (AT WELL PAD)
2019 PENNENERGY RESOURCES LLC Produced Fluid 2,819.85 Bbl INJECTION DISPOSAL WELL 34-155-24079
2019 PENNENERGY RESOURCES LLC Waste Water Treatment Sludge 0.30 Tons RESIDUAL WASTE PROCESSING FACILITY 2014-541

For data sources see[8]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
2385365 Primary Facility 2015-07-06 Routine/Partial Inspection No Violations Noted
2392603 Primary Facility 2015-07-21 Drilling/Alteration No Violations Noted
2416231 Primary Facility 2015-10-14 Routine/Partial Inspection No Violations Noted
2496025 Primary Facility 2016-06-27 Administrative/File Review No Violations Noted
2539617 Primary Facility 2016-11-29 Administrative/File Review No Violations Noted
2840114 Primary Facility 2019-02-05 Routine/Partial Inspection No Violations Noted On site for a routine partial inspection.

Well is drilled, completed, and in production. Well tag in place. Production equipment in place (tanks, GPU) and on containment. Gathering pipeline header on site.

BMPs in place, maintained, and functioning. Site stabilized with vegetation. Snow cover at time of inspection.

For data sources see[9]

References