X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

37-019-22445

Well Details

Well ID: 37-019-22445
Loading map...
Country: United States
State: Pennsylvania
County: Butler
Municipality: Clearfield Township
Operator Name: XTO ENERGY INC
Well Pad ID: 152624
Farm/Lease Name: GALAN A UNIT
License Status: Active
Spud Date: 2015-07-28
Permit Date: 2015-06-23
Well Type: GAS
Unconventional Well: Y
Configuration: Horizontal Well
Conservation: No
Latitude: 40.822772
Longitude: -79.752464

For data sources see[1][2][3]

Well History

Date Event
2015-06-23 New Permit Application
2015-07-27 Performed Spud Operation
2015-09-04 Drilling Completion
2016-04-21 Perforation
2016-05-11 Perforation
2016-05-11 Performed Stage 1 of Stimulation
2016-05-12 Perforation
2016-05-12 Performed Stage 2 of Stimulation
2016-05-13 Perforation
2016-05-13 Performed Stage 3 of Stimulation
2016-05-14 Perforation
2016-05-14 Performed Stage 4 of Stimulation
2016-05-16 Perforation
2016-05-16 Performed Stage 5 of Stimulation
2016-05-17 Perforation
2016-05-17 Performed Stage 6 of Stimulation
2016-05-18 Perforation
2016-05-18 Performed Stage 7 of Stimulation
2016-05-19 Perforation
2016-05-19 Performed Stage 8 of Stimulation
2016-05-20 Perforation
2016-05-20 Performed Stage 10 of Stimulation
2016-05-20 Performed Stage 9 of Stimulation
2016-05-21 Perforation
2016-05-21 Performed Stage 11 of Stimulation
2016-05-23 Perforation
2016-05-23 Performed Stage 12 of Stimulation
2016-05-24 Performed Stage 13 of Stimulation
2016-05-25 Perforation
2016-05-25 Performed Stage 14 of Stimulation
2016-05-26 Perforation
2016-05-26 Performed Stage 15 of Stimulation
2016-05-26 Performed Stage 16 of Stimulation
2016-05-27 Perforation
2016-05-27 Performed Stage 17 of Stimulation
2016-05-28 Perforation
2016-05-28 Performed Stage 18 of Stimulation
2016-05-31 Perforation
2016-05-31 Performed Stage 19 of Stimulation
2016-05-31 Performed Stage 20 of Stimulation
2016-06-01 Perforation
2016-06-01 Performed Stage 21 of Stimulation
2016-06-02 Perforation
2016-06-02 Performed Stage 22 of Stimulation
2016-06-02 Performed Stage 23 of Stimulation
2016-06-03 Perforation
2016-06-03 Performed Stage 24 of Stimulation
2016-06-04 Perforation
2016-06-04 Performed Stage 25 of Stimulation
2016-06-06 Perforation
2016-06-06 Performed Stage 26 of Stimulation
2016-06-06 Performed Stage 27 of Stimulation
2017-01-03 Deviated

For data sources see[4]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2016-05-11 2016-06-06 6,153 14,693,800 0

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Water XTO Energy/ExxonMobil Carrier Water 7732-18-5 100 90.2528 0
Sand C&J Well Services Sand - Bulk - Pennsylvania Titanium Oxide 13463-67-7 0.1 0.004855 0
Iron Oxide 1309-37-1 0.1 0.002392 0
Crystalline Silica, quartz 14808-60-7 99.9 0.824693 0
Crystalline Silica, quartz 14808-60-7 99.9 4.85018 0
Aluminum Oxide 1344-28-1 1.1 0.009081 0
Crystalline Silica, quartz 14808-60-7 99.9 2.3899 0
Titanium Oxide 13463-67-7 0.1 0.000826 0
Iron Oxide 1309-37-1 0.1 0.000826 0
Titanium Oxide 13463-67-7 0.1 0.002392 0
Aluminum Oxide 1344-28-1 1.1 0.053405 0
Iron Oxide 1309-37-1 0.1 0.004855 0
Aluminum Oxide 1344-28-1 1.1 0.026315 0
Other Ingredients C&J Well Services Other Ingredients Poly(oxy-1,2-ethanediyl), a-hydro-w-hydroxy-,
mono-C10-14-alkyl esthers, phosphates
68585-36-4 3 0.002732 0
CJENERGY-Surfactant-00025 Proprietary 3 0.002732 0
CJENERGY-Surfactant-00026 Proprietary 1 0.000911 0
2-Propenamide as residual 79-06-1 0.1 0.00009100 0
Water 7732-18-5 92.5 0.70315 0
CJENERGY-Polymer-00024 Proprietary 35 0.031876 0
Water 7732-18-5 96 0.017428 0
Water 7732-18-5 31 0.028233 0
Alcohols, C12-18, ethoxylated propoxylated 69227-21-0 2 0.001821 0
Water 7732-18-5 85 0.03002 0
CI-3 C&J Well Services Acid Corrosion Inhibitors Tar bases, quinoline derivs, benzyl chloride-quaternized 72480-70-7 15 0.112384 0
2-Butoxyethanol 111-76-2 15 0.112384 0
1-OCTANOL 111-87-5 2.5 0.018731 0
Isopropyl Alcohol 67-63-0 2.5 0.018731 0
Triethyl Phosphate 78-40-0 2.5 0.018731 0
Nonyphenol (branched), ethoxylated 127087-87-0 5 0.037461 0
Ethylene Glycol 107-21-1 40 0.299692 0
Cinnamaldehyde 104-55-2 15 0.112384 0
1-DECANOL 112-30-1 5 0.037461 0
Dimethylformamide 68-12-2 20 0.149846 0
BIO-CLEAR 2000 C&J Well Services Biocides 2,2-Dibromo-3-nitrilo-propionamide (DBNPA) 10222-01-2 30 0.006122 0
FR-16 PA-Only C&J Well Services PA-Proprietary Ethylene Glycol 107-21-1 5 0.004554 0
Distillates (Petroleum), Hydrotreated Light 64742-47-8 45 0.040983 0
HC-7.5 C&J Well Services Bulk Acid Hydrochloric Acid 7647-01-0 7.5 0.057012 0
SI-6 PA-Only C&J Well Services PA-Proprietary Methanol 67-56-1 1 0.000182 0
Monoethanolamine hydrochloride 2002-24-6 2 0.000363 0
CJENERGY-Phosphate-00040 Proprietary 6 0.001089 0
Ammonium Chloride 12125-02-9 2 0.000363 0
HC-15 C&J Well Services Bulk Acid Hydrochloric Acid 7647-01-0 15 0.005298 0

For data sources see[5]

Stimulation Data

Stimulation Date Phase Number Chemical Agent Volume (gal) Treating Pressure (psi) Breakdown Pressure (psi)
2016-05-11 1 SAND 12,267,752 7,349 4,576
2016-05-12 2 SAND 12,267,752 7,639 6,325
2016-05-13 3 SAND 12,267,752 7,551 6,115
2016-05-14 4 SAND 12,267,752 7,481 5,475
2016-05-16 5 SAND 12,267,752 7,682 5,502
2016-05-17 6 SAND 12,267,752 7,304 6,226
2016-05-18 7 SAND 12,267,752 7,885 6,101
2016-05-19 8 SAND 12,267,752 7,169 6,099
2016-05-20 9 SAND 12,267,752 6,933 5,288
2016-05-20 10 SAND 12,267,752 7,358 6,779
2016-05-21 11 SAND 12,267,752 7,046 6,929
2016-05-23 12 SAND 12,267,752 7,438 6,222
2016-05-24 13 SAND 12,267,752 6,872 6,337
2016-05-25 14 SAND 12,267,752 6,812 5,642
2016-05-26 15 SAND 12,267,752 7,224 6,155
2016-05-26 16 SAND 12,267,752 6,900 6,011
2016-05-27 17 SAND 12,267,752 7,278 6,205
2016-05-28 18 SAND 12,267,752 6,713 6,475
2016-05-31 19 SAND 12,267,752 7,421 6,644
2016-05-31 20 SAND 12,267,752 6,779 6,199
2016-06-01 21 SAND 12,267,752 6,306 6,694
2016-06-02 22 SAND 12,267,752 7,196 6,844
2016-06-02 23 SAND 12,267,752 6,550 5,963
2016-06-03 24 SAND 12,267,752 6,132 6,312
2016-06-04 25 SAND 12,267,752 7,213 7,555
2016-06-06 26 SAND 12,267,752 7,035 6,039
2016-06-06 27 SAND 12,267,752 6,789 8,039

For data sources see[6]

Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2015 XTO ENERGY INC 0.00 0 0.00 0 0.00 0
2016 XTO ENERGY INC 0.00 0 0.00 0 0.00 0
2017 XTO ENERGY INC 1,036,998.00 354 0.00 0 71.66 231
2018 XTO ENERGY INC 774,031.31 345 1.25 29 6.24 149
2019 XTO ENERGY INC 735,954.66 364 0.00 0 0.83 28

For data sources see[7]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2015 XTO ENERGY INC Drill Cuttings 1,245.94 Tons LANDFILL 100585
2016 XTO ENERGY INC Fracturing Fluid Waste 6,140.00 Bbl REUSE OTHER THAN ROAD SPREADING
2016 XTO ENERGY INC Fracturing Fluid Waste 47.55 Tons RESIDUAL WASTE PROCESSING FACILITY 101674
2016 XTO ENERGY INC Fracturing Fluid Waste 71.70 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW009
2017 XTO ENERGY INC Produced Fluid 5,897.56 Bbl INJECTION DISPOSAL WELL 34-133-21076
2017 XTO ENERGY INC Produced Fluid 395.40 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW005
2017 XTO ENERGY INC Produced Fluid 11,551.34 Bbl INJECTION DISPOSAL WELL 34-133-24189
2017 XTO ENERGY INC Produced Fluid 4,350.74 Bbl INJECTION DISPOSAL WELL 34-133-24096
2017 XTO ENERGY INC Produced Fluid 14,265.58 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW009
2018 XTO ENERGY INC Produced Fluid 368.22 Bbl INJECTION DISPOSAL WELL 34-133-24189
2018 XTO ENERGY INC Produced Fluid 237.00 Bbl INJECTION DISPOSAL WELL 34-133-24096
2018 XTO ENERGY INC Produced Fluid 110.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW005
2018 XTO ENERGY INC Produced Fluid 7,764.83 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW009
2018 XTO ENERGY INC Produced Fluid 209.65 Bbl INJECTION DISPOSAL WELL 34-133-21076
2019 XTO ENERGY INC Produced Fluid 2,970.76 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW009
2019 XTO ENERGY INC Produced Fluid 2,470.00 Bbl INJECTION DISPOSAL WELL 34-133-24096
2019 XTO ENERGY INC Produced Fluid 645.00 Bbl INJECTION DISPOSAL WELL 34-133-21076
2019 XTO ENERGY INC Produced Fluid 1,425.00 Bbl INJECTION DISPOSAL WELL 34-133-24189

For data sources see[8]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
2393266 Primary Facility 2015-07-27 Drilling/Alteration No Violations Noted
2393918 Primary Facility 2015-07-28 Routine/Partial Inspection No Violations Noted
2397122 Primary Facility 2015-08-06 Drilling/Alteration No Violations Noted
2405017 Primary Facility 2015-09-02 Drilling/Alteration No Violations Noted
2405022 Primary Facility 2015-09-03 Drilling/Alteration No Violations Noted
2486237 Primary Facility 2016-05-18 Complaint Inspection No Violations Noted
2535907 Primary Facility 2016-11-14 Administrative/File Review No Violations Noted
2544148 Primary Facility 2016-12-02 Routine/Partial Inspection No Violations Noted
2583107 Primary Facility 2017-04-05 Routine/Partial Inspection No Violations Noted
2681464 Primary Facility 2018-01-10 Routine/Complete Inspection No Violations Noted On 1/10/2018, WQS Brian MacQuarrie onsite. Site sign posted and maintained at entrance. Three wells properly tagged and in production. Four 400 bbl production tanks in containment. Snow on ground. No apparent issues.
2698866 Primary Facility 2018-02-27 Routine/Partial Inspection No Violations Noted On site for a routine partial inspection.

All wells on site are in production. Well tags in place. Wellheads fenced and protected with a jersey barrier.

Production equipment, tank battery & GPUs, on containment. Combustor on site. Production equipment fenced. Sound wall installed on pad. Gathering pipeline connected to wells, with a pipeline launcher/receiver on pad.

All temporary E/S controls removed. PCSM plan implemented & PCSM BMPs installed. Site is 100% vegetated.

2835575 Primary Facility 2019-02-04 Routine/Partial Inspection No Violations Noted On 2/4/2019, WQS Brian MacQuarrie onsite. Site sign posted at entrance to site. Access road maintained. Three wells in production, 2H(019-22445), 6H(019-22446) and 10H(019-22454). Tank battery consists of four 400 bbl tanks installed within containment. Post construction BMPs maintained.

For data sources see[9]

References