X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

37-019-22511

Well Details

Well ID: 37-019-22511
Loading map...
Country: United States
State: Pennsylvania
County: Butler
Municipality: Jackson Township
Operator Name: PENNENERGY RESOURCES LLC
Well Pad ID: 153349
Farm/Lease Name: PER B34
License Status: Active
Spud Date: 2017-10-12
Permit Date: 2015-12-29
Well Type: GAS
Unconventional Well: Y
Configuration: Horizontal Well
Conservation: No
Latitude: 40.746417
Longitude: -80.150931

For data sources see[1][2][3]

Well History

Date Event
2015-12-29 New Permit Application
2016-12-15 Permit Renewal Application
2017-10-11 Performed Spud Operation
2018-01-15 Drilling Completion
2018-06-29 Perforation
2018-06-29 Performed Stage 1 of Stimulation
2018-06-29 Performed Stage 2 of Stimulation
2018-06-29 Performed Stage 3 of Stimulation
2018-06-29 Performed Stage 4 of Stimulation
2018-06-30 Perforation
2018-06-30 Performed Stage 5 of Stimulation
2018-06-30 Performed Stage 6 of Stimulation
2018-07-02 Perforation
2018-07-02 Performed Stage 7 of Stimulation
2018-07-02 Performed Stage 8 of Stimulation
2018-07-02 Performed Stage 9 of Stimulation
2018-07-03 Perforation
2018-07-03 Performed Stage 10 of Stimulation
2018-07-03 Performed Stage 11 of Stimulation
2018-07-03 Performed Stage 12 of Stimulation
2018-07-03 Performed Stage 13 of Stimulation
2018-07-03 Performed Stage 14 of Stimulation
2018-07-03 Performed Stage 15 of Stimulation
2018-07-03 Performed Stage 16 of Stimulation
2018-07-04 Perforation
2018-07-04 Performed Stage 17 of Stimulation
2018-07-04 Performed Stage 18 of Stimulation
2018-07-05 Perforation
2018-07-05 Performed Stage 19 of Stimulation
2018-07-05 Performed Stage 20 of Stimulation
2018-07-05 Performed Stage 21 of Stimulation
2018-07-05 Performed Stage 22 of Stimulation
2018-07-05 Performed Stage 23 of Stimulation
2018-07-06 Perforation
2018-07-06 Performed Stage 24 of Stimulation
2018-07-06 Performed Stage 25 of Stimulation
2018-07-06 Performed Stage 26 of Stimulation
2018-07-06 Performed Stage 27 of Stimulation
2019-07-03 Perforation
2019-10-17 Deviated

For data sources see[4]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2018-06-29 2018-07-06 5,273 11,235,700 0

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Glutaraldehyde 111-30-8 30 0.00546727 5942.91
Hydrochloric Acid 7647-01-0 7.5 0.152053 165282
Alcohol Alkoxylates Not Assigned 5 0.00344877 3748.81
Sodium Phosphate, Tribasic 7601-54-9 5 0.000941209 1023.09
Amine Triphosphate Not Assigned 30 0.00564726 6138.56
Ethylene Glycol 107-21-1 5 0.000941209 1023.09
Aliphatic Hydrocarbon Not Assigned 30 0.0206926 22492.8
Alcohols C10-16, ethoxylated 0068002-97-1 50 0.000454086 493.59
Oxyalkylated alcohol Not Assigned 5 0.00191969 2086.7
Formaldehyde 0000050-00-0 1 0.00000908 9.872
Ammonium persulfate 7727-54-0 100 0.000496781 540
Silica Substrate 14808-60-7 100 11.569 12,575,500.0
Inorganic Salt Not Assigned 10 0.00383938 4173.4
Substituted alkylamine Not Assigned 1 0.000383938 417.34
Thiourea 0000062-56-6 1 0.00000908 9.872
Hydrotreated Light Distillate Not Assigned 30 0.0115181 12520.2
Methanol 0000067-56-1 5 0.00004541 49.359
Butyl digycol 0000112-34-5 75 0.000681128 740.385
AP Breaker Lubrizol Breaker Listed Below Listed Below 0 0 0
Water PennEnergy Resources Carrier/Base Fluid Water 7732-18-5 100 86.2578 93,762,000.0
Other Chemical(s) Listed Above See Trade Name(s) List Water 7732-18-5 92.5 1.87533 2,038,480.0
Hydrochloric Acid (7.5%) PVS Acidizing Listed Below Listed Below 0 0 0
TRS 17888 Tight Rock Solutions Friction Reducer Listed Below Listed Below 0 0 0
TRS 3001 Tight Rock Solutions Scale Control Listed Below Listed Below 0 0 0
Sand (Proppant) Sargent/Momentive/Prefferred Proppant Listed Below Listed Below 0 0 0
BIOC12031A Nalco Biocide Listed Below Listed Below 0 0 0
TRS 805X Tight Rock Solutions Friction Reducer Listed Below Listed Below 0 0 0
Unihib G Geosafe Corrosion Inhibitor Listed Below Listed Below 0 0 0

For data sources see[5]

Stimulation Data

Stimulation Date Phase Number Chemical Agent Volume (gal) Treating Pressure (psi) Breakdown Pressure (psi)
2018-06-29 1 Sand 90,000 6,663 6,150
2018-06-29 2 Sand 90,000 6,348 6,584
2018-06-29 3 Sand 90,000 6,306 6,466
2018-06-29 4 Sand 90,000 6,390 5,444
2018-06-30 5 Sand 90,000 6,441 5,563
2018-06-30 6 Sand 90,000 6,088 4,312
2018-07-02 7 Sand 90,000 6,401 6,175
2018-07-02 8 Sand 90,000 7,206 6,428
2018-07-02 9 Sand 90,000 6,643 6,044
2018-07-03 10 Sand 90,000 6,120 6,139
2018-07-03 11 Sand 90,000 6,355 5,991
2018-07-03 12 Sand 90,000 6,229 6,188
2018-07-03 13 Sand 90,000 6,323 5,951
2018-07-03 14 Sand 90,000 5,852 5,973
2018-07-03 15 Sand 90,000 5,701 6,077
2018-07-03 16 Sand 90,000 6,362 6,280
2018-07-04 17 Sand 90,000 5,692 6,195
2018-07-04 18 Sand 90,000 5,506 5,884
2018-07-05 19 Sand 90,000 6,035 6,604
2018-07-05 20 Sand 90,000 5,969 6,047
2018-07-05 21 Sand 90,000 5,883 6,306
2018-07-05 22 Sand 90,000 5,920 6,214
2018-07-05 23 Sand 90,000 5,989 5,672
2018-07-06 24 Sand 90,000 5,731 5,825
2018-07-06 25 Sand 90,000 5,856 6,044
2018-07-06 26 Sand 90,000 5,816 6,531
2018-07-06 27 Sand 90,000 5,832 7,051

For data sources see[6]

Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2017 PENNENERGY RESOURCES LLC 0.00 0 0.00 0 0.00 0
2018 PENNENERGY RESOURCES LLC 217,514.00 92 0.00 0 2,144.00 91
2019 PENNENERGY RESOURCES LLC 715,647.00 354 0.00 0 3,933.00 354

For data sources see[7]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2017 PENNENERGY RESOURCES LLC Drilling Fluid Waste 100.00 Bbl INJECTION DISPOSAL WELL 34-155-23196
2017 PENNENERGY RESOURCES LLC Drilling Fluid Waste 54.00 Bbl INJECTION DISPOSAL WELL 34-155-23223
2017 PENNENERGY RESOURCES LLC Produced Fluid 34.67 Bbl REUSE (AT WELL PAD)
2017 PENNENERGY RESOURCES LLC Drill Cuttings 246.33 Tons RESIDUAL WASTE PROCESSING FACILITY PAD085690592
2018 PENNENERGY RESOURCES LLC Drill Cuttings 374.82 Tons RESIDUAL WASTE PROCESSING FACILITY PAD085690592
2018 PENNENERGY RESOURCES LLC Other Oil & Gas Wastes 13.00 Bbl INJECTION DISPOSAL WELL 34-155-23196
2018 PENNENERGY RESOURCES LLC Filter Socks 0.32 Tons RESIDUAL WASTE PROCESSING FACILITY 2014-541
2018 PENNENERGY RESOURCES LLC Produced Fluid 8,372.65 Bbl REUSE (AT WELL PAD)
2018 PENNENERGY RESOURCES LLC Produced Fluid 2.63 Tons RESIDUAL WASTE PROCESSING FACILITY 2014-541
2018 PENNENERGY RESOURCES LLC Drilling Fluid Waste 288.00 Bbl INJECTION DISPOSAL WELL 34-155-23223
2018 PENNENERGY RESOURCES LLC Soil Contaminated by Oil & Gas Related Spills 28.71 Tons RESIDUAL WASTE PROCESSING FACILITY PAD085690592
2018 PENNENERGY RESOURCES LLC Produced Fluid 40.00 Bbl INJECTION DISPOSAL WELL 34-155-21893
2018 PENNENERGY RESOURCES LLC Drilling Fluid Waste 640.83 Bbl INJECTION DISPOSAL WELL 34-155-23196
2018 PENNENERGY RESOURCES LLC Produced Fluid 29.95 Tons RESIDUAL WASTE PROCESSING FACILITY PAD085690592
2018 PENNENERGY RESOURCES LLC Other Oil & Gas Wastes 25.50 Bbl INJECTION DISPOSAL WELL 34-155-23223
2018 PENNENERGY RESOURCES LLC Drilling Fluid Waste 87.27 Bbl REUSE (AT WELL PAD)
2018 PENNENERGY RESOURCES LLC Servicing Fluid 12.22 Tons RESIDUAL WASTE PROCESSING FACILITY PAD085690592
2018 PENNENERGY RESOURCES LLC Soil Contaminated by Oil 28.71 Tons RESIDUAL WASTE PROCESSING FACILITY PAD085690592
2019 PENNENERGY RESOURCES LLC Produced Fluid 152.33 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW009
2019 PENNENERGY RESOURCES LLC Produced Fluid 47.19 Bbl INJECTION DISPOSAL WELL 34-155-21893
2019 PENNENERGY RESOURCES LLC Produced Fluid 301.68 Bbl INJECTION DISPOSAL WELL 34-155-23223
2019 PENNENERGY RESOURCES LLC Produced Fluid 14,354.88 Bbl REUSE (AT WELL PAD)
2019 PENNENERGY RESOURCES LLC Synthetic Liner Materials 2.42 Tons RESIDUAL WASTE PROCESSING FACILITY PAD085690592
2019 PENNENERGY RESOURCES LLC Produced Fluid 433.88 Bbl INJECTION DISPOSAL WELL 34-155-23196
2019 PENNENERGY RESOURCES LLC Produced Fluid 122.58 Bbl INJECTION DISPOSAL WELL 34-155-23795
2019 PENNENERGY RESOURCES LLC Produced Fluid 29.15 Bbl INJECTION DISPOSAL WELL 34-155-22403
2019 PENNENERGY RESOURCES LLC Waste Water Treatment Sludge 4.95 Tons RESIDUAL WASTE PROCESSING FACILITY 2014-541

For data sources see[8]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
2650363 Primary Facility 2017-10-12 Routine/Partial Inspection No Violations Noted At the time of inspection, Rocky Mountain is onsite with a Soilmec auger rig working on cellar for 3H and 4H wells. This well had 16" set to 42' with 2 centralizers within a 20" hole. The cellar has been set in well. Cement not poured yet. The cuttings are being moved to the area where the freshwater impoundment is being built. This has not been lined yet. The impoundment is fenced in. Posts are set around pad, but no fencing yet. The Emergency Response sign and permit are posted at the entrance to the access road.
2659545 Primary Facility 2017-11-08 Drilling/Alteration No Violations Noted At the time of inspection, Highlands rig 9 is waiting on cement floowing intermediate casing job, which plugged down at 3:20 AM. Surface casing for this well was cemented using 370 sxs (80 bbls) Class H, 2% Gypsum, 2% CaCl2, 5% salt, 15.8 ppg, 1.22 yield. Plug bumped and floats held. 16 bbls cement returned to surface.

Intermediate casing was cemented using 685 sxs (146 bbls) Class H, 2% Gypsum, 2% CaCl2, 5% salt, 15.8 ppg, 1.2 yield. Plug bumped and floats held. 20 bbls cement returned to surface. A float shoe and float collar were used for both strings of casing. Surface casing had 9 centralizers and intermediate had 32 centralizers installed. Blue book was available on computer. 115 bbls/hr water 1st encountered at 1280'. It is not believed to be freshwater. No signs that containment was compromised during job.

2666977 Primary Facility 2017-12-04 Routine/Partial Inspection No Violations Noted On site for a routine partial inspection.

Permitted wells spudded. Wells fenced with a cattle gate and steel plate covering holes. No production equipment set. Temporary storage tanks installed. Pad liner installed & intact.

Well pad is fenced. Site ID sign in place. Well and ESCGP2 permits on site. Well development impoundment completed, fenced, &liner installed. All E/S controls &BMPs installed, in place, intact, and functioning. Site has good vegetation growth.

2678994 Primary Facility 2018-01-08 Administrative/File Review No Violations Noted
2684492 Primary Facility 2018-01-22 Administrative/File Review No Violations Noted
2687310 Primary Facility 2018-01-17 Drilling/Alteration No Violations Noted At the time of inspection, Halliburton was onsite waiting on parts to cement. Snow was covering containment. All chemicals were on it.

Email was sent later describing how production casing was cemented. They used a lead 1 of 260 sxs HalCem (52.5 bbls), 14.5 ppg, 1.132 yield, a lead 2 of 670 sxs ShaleCem (135 bbls), 14.5 ppg, 1.135 yield and tail of 570 sxs SoluCem (185 bbls), 15.2 ppg, 1.819 yield. Displacement was 234 bbls freshwater. Plug was bumped and floats held. 30 bbls returned to surface. A float shoe and float collar were used along with 259 centralizers.

2786593 Primary Facility 2018-10-10 Administrative/File Review No Violations Noted
2814866 Primary Facility 2018-12-13 Routine/Partial Inspection No Violations Noted On 12/13/2018, WQS Brian MacQuarrie onsite. Contractors onsite filling cellars with gravel to surface. Site consists of six wells completed; 1H-019-22649, 2H-019-22511, 3H-019-22650, 4H-019-22651, 5H-019-22652 and 6H-019-22653. Tank battery consists of three 400 bbl tanks installed within stainless steel containment structure. Large AST onsite containing impaired water. Five 500 bbl frac tanks (empty) staged onsite. Freshwater impoundment lined and fenced in. Erosion and Sedimentation BMPs installed and maintained. Vegetative growth well established in previously disturbed areas.
2836139 Primary Facility 2019-02-05 Routine/Partial Inspection No Violations Noted On 2/5/2019, WQS Brian MacQuarrie onsite. Six wells in production, 1H (019-22649), 2H (019-22511), 3H (019-22650), 4H (019-22651), 5H (019-22652) and 6H (019-22653). Tank battery consists of three 400 bbl tanks installed within secondary containment structure. One large AST onsite. Five frac tanks staged onsite. Freshwater impoundment fenced in and locked. Erosion and Sedimentation BMPs installed and maintained. Previously disturbed areas vegetated.

For data sources see[9]

References