X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

37-019-22579

Well Details

Well ID: 37-019-22579
Loading map...
Country: United States
State: Pennsylvania
County: Butler
Municipality: Jefferson Township
Operator Name: PENNENERGY RESOURCES LLC
Well Pad ID: 151656
Farm/Lease Name: WEST PAD 55 1H
License Status:
Spud Date: 2017-05-11
Permit Date: 2016-10-25
Well Type: GAS
Unconventional Well: Y
Configuration: Horizontal Well
Conservation: No
Latitude: 40.756650
Longitude: -79.800144

For data sources see[1][2][3]

Well History

Date Event
Deviated
2016-10-25 New Permit Application
2017-05-10 Performed Spud Operation
2017-08-17 Drilling Completion

For data sources see[4]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2017-11-27 2017-12-07 6,246 12,353,300 0

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Water PennEnergy Resources Carrier/Base Fluid Water 7732-18-5 100 87.1285 103,728,000.0
Sand (Proppant) Sargent Proppant Silica 14808-60-7 99.9 10.3005 12,262,800.0
Unihib G GeoSafe Acid Corrosion Inhibitor Acetophenone 98-86-2 1 0.00001082 12.883
Methanol 67-56-1 5 0.00005411 64.415
Thiourea 62-56-6 1 0.00001082 12.883
Formaldehyde 50-00-0 1 0.00001082 12.883
Glycol Ether 112-34-5 60 0.000649284 772.981
Ethoxylated Alcohol 68002-97-1 35 0.000378749 450.905
Hydrochloric Acid (7.5%) Axiall Acidizing Hydrogen Chloride 7647-01-0 40 0.966423 1,150,540.0
Other Chemical(s) Listed Above See Trade Name(s) List Ethylene Glycol 107-21-1 5 0.000432587 515
Ethoxylated Alcohol 68002-97-1 35 0.000378749 450.905
Glutaraldehyde 111-30-8 30 0.00237629 2829
Acetophenone 98-86-2 1 0.00001082 12.883
Amine Triphosphate Proprietary 30 0.00259552 3090
Hydrotreated Light Distillate 64742-47-8 30 0.0148814 17716.6
Sodium Phosphate, Tribasic 7601-54-9 5 0.000432587 515
Sulfuric Acid 7664-93-9 1 0.00000348 4.14
Oxyalkylated Alcohol Proprietary 5 0.00248024 2952.76
Alkyl Alcohol Proprietary 10 0.00496048 5905.52
Thiourea 62-56-6 1 0.00001082 12.883
Methanol 67-56-1 1 0.00007980 95
Inorganic Salt Proprietary 10 0.00496048 5905.52
Substitued Alkylamine Proprietary 10 0.00496048 5905.52
Methanol 67-56-1 5 0.00005411 64.415
Formaldehyde 50-00-0 1 0.00001082 12.883
TRS17888, TRS3001, BIOC12031A, TRS11800 TightRock Solutions Frac Fluid Additives Hydrotreated Light Distillate 64742-47-8 30 0.0148814 17716.6
Inorganic Salt Proprietary 10 0.00496048 5905.52
Ethylene Glycol 107-21-1 5 0.000432587 515
Oxyalkylated Alcohol Proprietary 5 0.00248024 2952.76
Glutaraldehyde 111-30-8 30 0.00237629 2829
Alkyl Alcohol Proprietary 10 0.00496048 5905.52
Amine Triphosphate Proprietary 30 0.00259552 3090
Methanol 67-56-1 1 0.00007980 95
Sodium Phosphate, Tribasic 7601-54-9 5 0.000432587 515
Substitued Alkylamine Proprietary 10 0.00496048 5905.52
Breaker Lubrizol Breaker Ammonium Peroxydisulfate 7727-54-0 100 0.000347749 414
Sulfuric Acid 7664-93-9 1 0.00000348 4.14

For data sources see[5]

Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2017 PENNENERGY RESOURCES LLC 4,125.00 3 0.00 0 0.00 0
2018 PENNENERGY RESOURCES LLC 1,197,896.00 365 0.00 0 0.00 0
2019 PENNENERGY RESOURCES LLC 816,215.00 359 0.00 0 0.00 28

For data sources see[6]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2017 PENNENERGY RESOURCES LLC Other Oil & Gas Wastes 636.33 Bbl INJECTION DISPOSAL WELL 34-155-23223
2017 PENNENERGY RESOURCES LLC Drilling Fluid Waste 241.67 Bbl INJECTION DISPOSAL WELL 34-155-23196
2017 PENNENERGY RESOURCES LLC Other Oil & Gas Wastes 707.00 Bbl INJECTION DISPOSAL WELL 34-155-23196
2017 PENNENERGY RESOURCES LLC Drilling Fluid Waste 410.00 Bbl CENT WASTE TRT FAC NPDES EPA ID: 748-163
2017 PENNENERGY RESOURCES LLC Drilling Fluid Waste 235.00 Bbl INJECTION DISPOSAL WELL 34-155-23223
2017 PENNENERGY RESOURCES LLC Produced Fluid 2,841.74 Bbl REUSE (AT WELL PAD)
2017 PENNENERGY RESOURCES LLC Drilling Fluid Waste 410.00 Bbl CENT WASTE TRT FAC NPDES DISCHARGE EPA ID: 748-163
2017 PENNENERGY RESOURCES LLC Drill Cuttings 687.97 Tons RESIDUAL WASTE PROCESSING FACILITY PAD085690592
2018 PENNENERGY RESOURCES LLC Synthetic Liner Materials 60.27 Tons RESIDUAL WASTE PROCESSING FACILITY PAD085690592
2018 PENNENERGY RESOURCES LLC Filter Socks 0.09 Tons RESIDUAL WASTE PROCESSING FACILITY 2014-541
2018 PENNENERGY RESOURCES LLC Produced Fluid 41,508.29 Tons REUSE (AT WELL PAD)
2018 PENNENERGY RESOURCES LLC Produced Fluid 28.73 Tons RESIDUAL WASTE PROCESSING FACILITY 2014-541
2018 PENNENERGY RESOURCES LLC Produced Fluid 35.33 Bbl INJECTION DISPOSAL WELL 34-155-22403
2018 PENNENERGY RESOURCES LLC Produced Fluid 10.00 Bbl INJECTION DISPOSAL WELL 34-155-23223
2018 PENNENERGY RESOURCES LLC Produced Fluid 5.54 Tons RESIDUAL WASTE PROCESSING FACILITY PAD085690592
2018 PENNENERGY RESOURCES LLC Servicing Fluid 6.72 Tons RESIDUAL WASTE PROCESSING FACILITY PAD085690592
2019 PENNENERGY RESOURCES LLC Produced Fluid 551.40 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW009
2019 PENNENERGY RESOURCES LLC Produced Fluid 41.16 Bbl INJECTION DISPOSAL WELL 34-155-21893
2019 PENNENERGY RESOURCES LLC Produced Fluid 1,231.61 Bbl INJECTION DISPOSAL WELL 34-155-23223
2019 PENNENERGY RESOURCES LLC Produced Fluid 5,544.30 Bbl REUSE (AT WELL PAD)
2019 PENNENERGY RESOURCES LLC Produced Fluid 37.19 Bbl INJECTION DISPOSAL WELL 34-155-22403
2019 PENNENERGY RESOURCES LLC Produced Fluid 258.61 Bbl INJECTION DISPOSAL WELL 34-155-23795
2019 PENNENERGY RESOURCES LLC Produced Fluid 518.59 Bbl INJECTION DISPOSAL WELL 34-155-23196

For data sources see[7]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
2593421 Primary Facility 2017-05-12 Routine/Partial Inspection No Violations Noted
2608938 Primary Facility 2017-06-29 Drilling/Alteration No Violations Noted
2608941 Primary Facility 2017-06-27 Routine/Partial Inspection No Violations Noted
2620387 Primary Facility 2017-07-06 Routine/Partial Inspection No Violations Noted
2629460 Primary Facility 2017-08-23 Routine/Partial Inspection No Violations Noted At the time of inspection, Patterson 259 is onsite on the 3H well. This well had production casing cemented using a lead 1 of 250 sxs (53 bbls) HalCem, 14.5 ppg, 1.2 yield, a lead 2 of 760 sxs (162 bbls) ShaleCem, 14.5 ppg, 1.2 yield and tail of 650 sxs (211 bbls) SoluCem, 15.2 ppg, 1.825 yield. Displaced with 229 bbls and bumped plug. Floats held (3.5 bbls back). 80 bbls of cement returned to surface. A float shoe and float collar were used along with 186 centralizers.
2629532 Primary Facility 2017-08-15 Drilling/Alteration No Violations Noted
2645087 Primary Facility 2017-10-10 Administrative/File Review No Violations Noted
2668283 Primary Facility 2017-12-07 Routine/Partial Inspection No Violations Noted On site for a routine partial inspection.

Post stimulation tear down and activity in progress.

All temporary storage tanks, fuel storage, and portable generators, etc on containment. Well development pipeline being removed. Pad liner in place and intact. AST installed with containment.

Gathering pipeline work continues. Pipeline header installed. E/S controls in place, intact, and functioning. Sound wall installed. Site has good vegetation growth.

2670149 Primary Facility 2017-12-04 Drilling/Alteration No Violations Noted At the time of inspection, Universal Well Services was onsite stimulating well. Notification was given that stage 17 of job communicated with Snyder Brothers' Concordia Lutheran Church 2-679 well. The Snyder well was shut in and is around 1000' from the wellbore of this well. There were no releases with the communication and integrity of both wells remain intact. Penn Energy and Snyder Brothers met and had an agreement on pumping pressures, which would be around 70 bbls/min.

Currently, stimulating stage 18. Unsure of total stages because some are not breaking down and may be re-perfed.

2678361 Primary Facility 2018-01-04 Administrative/File Review No Violations Noted
2679437 Primary Facility 2018-01-04 Routine/Complete Inspection No Violations Noted On 1/04/2018, WQS Brian MacQuarrie and WQSS Scott Lux onsite. Meet with Frank Kocher (Penn Energy subcontractor). Sandtraps setup at three wellheads. Large AST setup onsite for impaired water. Secondary containment maintained on well site. Snow on ground. No apparent violations.

For data sources see[8]

References