X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

37-019-22606

Well Details

Well ID: 37-019-22606
Loading map...
Country: United States
State: Pennsylvania
County: Butler
Municipality: Winfield Township
Operator Name: PENNENERGY RESOURCES LLC
Well Pad ID: 154293
Farm/Lease Name: PER W22
License Status: Active
Spud Date: 2017-07-01
Permit Date: 2017-04-25
Well Type: GAS
Unconventional Well: Y
Configuration: Horizontal Well
Conservation: No
Latitude: 40.8133
Longitude: -79.724789

For data sources see[1][2][3]

Well History

Date Event
2017-04-25 New Permit Application
2017-07-01 Performed Spud Operation
2017-09-30 Drilling Completion
2017-12-18 Perforation
2017-12-18 Performed Stage 1 of Stimulation
2017-12-19 Perforation
2017-12-19 Performed Stage 2 of Stimulation
2017-12-19 Performed Stage 3 of Stimulation
2018-01-18 Perforation
2018-01-18 Performed Stage 4 of Stimulation
2018-01-18 Performed Stage 5 of Stimulation
2018-01-18 Performed Stage 6 of Stimulation
2018-01-19 Perforation
2018-01-19 Performed Stage 7 of Stimulation
2018-01-19 Performed Stage 8 of Stimulation
2018-01-19 Performed Stage 9 of Stimulation
2018-01-20 Perforation
2018-01-20 Performed Stage 10 of Stimulation
2018-01-22 Perforation
2018-01-22 Performed Stage 11 of Stimulation
2018-01-22 Performed Stage 12 of Stimulation
2018-01-23 Perforation
2018-01-23 Performed Stage 13 of Stimulation
2018-01-23 Performed Stage 14 of Stimulation
2018-01-23 Performed Stage 15 of Stimulation
2018-01-23 Performed Stage 16 of Stimulation
2018-01-23 Performed Stage 17 of Stimulation
2018-01-24 Perforation
2018-01-24 Performed Stage 18 of Stimulation
2018-01-24 Performed Stage 19 of Stimulation
2018-01-24 Performed Stage 20 of Stimulation
2018-01-24 Performed Stage 21 of Stimulation
2018-01-24 Performed Stage 22 of Stimulation
2018-01-25 Perforation
2018-01-25 Performed Stage 23 of Stimulation
2018-01-25 Performed Stage 24 of Stimulation
2018-01-25 Performed Stage 25 of Stimulation
2018-01-25 Performed Stage 26 of Stimulation
2018-01-25 Performed Stage 27 of Stimulation
2018-01-25 Performed Stage 28 of Stimulation
2018-01-26 Perforation
2018-01-26 Performed Stage 29 of Stimulation
2018-01-26 Performed Stage 30 of Stimulation
2018-01-26 Performed Stage 31 of Stimulation
2018-01-26 Performed Stage 32 of Stimulation
2018-01-26 Performed Stage 33 of Stimulation
2018-01-26 Performed Stage 34 of Stimulation
2018-01-29 Perforation
2018-01-29 Performed Stage 35 of Stimulation
2018-01-29 Performed Stage 36 of Stimulation
2018-01-29 Performed Stage 37 of Stimulation
2018-01-29 Performed Stage 38 of Stimulation
2018-01-30 Perforation
2018-01-30 Performed Stage 38 of Stimulation
2018-01-30 Performed Stage 39 of Stimulation
2019-01-23 Perforation
2019-02-19 Deviated

For data sources see[4]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2018-01-18 2018-01-30 6,356 18,441,800 0

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Hydrochloric Acid (7.5%) PVS Acidizing Listed Below
AP Breaker Lubrizol Breaker Listed Below
Hydrochloric Acid 7647-01-0 7.5 0.166219 296528
Sodium Phosphate, Tribasic 7601-54-9 5 0.000962925 1717.81
Ammonium persulfate 7727-54-0 100 0.00042602 760
Alcohols C10-16, ethoxylated 0068002-97-1 50 0.000480715 857.574
Oxyalkylated alcohol Not Assigned 5 0.0027111 4836.47
Butyl digycol 0000112-34-5 75 0.000721073 1286.36
Amine Triphosphate Not Assigned 30 0.00577755 10306.9
Formaldehyde 0000050-00-0 1 0.00000961 17.151
Inorganic Salt Not Assigned 10 0.00395885 7062.41
Hydrotreated Light Distillate 64742-47-8 30 0.0162666 29018.8
Alkyl Alcohol Not Assigned 10 0.0054222 9672.95
Water 7732-18-5 92.5 2.05004 3,657,170.0
Methanol 0000067-56-1 5 0.00004807 85.757
Oxyalkylated alcohol Not Assigned 5 0.0027111 4836.47
Alcohols C10-16, ethoxylated 0068002-97-1 50 0.000480715 857.574
Glutaraldehyde 111-30-8 30 0.00548045 9776.87
Hydrotreated Light Distillate 64742-47-8 30 0.0118765 21187.2
Oxyalkylated alcohol Not Assigned 5 0.00197942 3531.2
Inorganic Salt Not Assigned 10 0.0054222 9672.95
Inorganic Salt Not Assigned 10 0.0054222 9672.95
Silica Substrate 14808-60-7 100 11.3839 20,308,300.0
Methanol 0000067-56-1 5 0.00004807 85.757
Oxyalkylated alcohol Not Assigned 5 0.00197942 3531.2
Substituted alkylamine Not Assigned 1 0.000395885 706.241
Water 7732-18-5 92.5 2.05004 3,657,170.0
Ethylene Glycol 107-21-1 5 0.000962925 1717.81
Thiourea 0000062-56-6 1 0.00000961 17.151
Thiourea 0000062-56-6 1 0.00000961 17.151
Sodium Phosphate, Tribasic 7601-54-9 5 0.000962925 1717.81
Ethylene Glycol 107-21-1 5 0.000962925 1717.81
Substituted alkylamine Not Assigned 1 0.000395885 706.241
Alkyl Alcohol Not Assigned 10 0.0054222 9672.95
Inorganic Salt Not Assigned 10 0.00395885 7062.41
Water 7732-18-5 100 86.2671 153,897,000.0
Formaldehyde 0000050-00-0 1 0.00000961 17.151
BIOC12031A Nalco Biocide Listed Below
TRS 17888 Tight Rock Solutions Friction Reducer Listed Below
TRS 11800 Tight Rock Solutions Friction Reducer Listed Below
TRS 3001 Tight Rock Solutions Scale Control Listed Below
Water Company 1 Carrier/Base Fluid Listed Below
Unihib G Geosafe Corrosion Inhibitor Listed Below
Sand (Proppant) Sargent/Momentive/Prefferred Proppant Listed Below

For data sources see[5]

Stimulation Data

Stimulation Date Phase Number Chemical Agent Volume (gal) Treating Pressure (psi) Breakdown Pressure (psi)
2017-12-18 1 Sand 12,276,378 7,784 5,690
2017-12-19 2 Sand 12,276,378 7,464 4,916
2017-12-19 3 Sand 12,276,378 7,755 5,229
2018-01-18 4 Sand 12,276,378 7,584 5,222
2018-01-18 5 Sand 12,276,378 7,704 5,433
2018-01-18 6 Sand 12,276,378 7,501 5,476
2018-01-19 7 Sand 12,276,378 8,436 5,306
2018-01-19 8 Sand 12,276,378 7,101 6,354
2018-01-19 9 Sand 12,276,378 7,206 5,858
2018-01-20 10 Sand 12,276,378 7,240 5,668
2018-01-22 11 Sand 12,276,378 7,663 6,630
2018-01-22 12 Sand 12,276,378 7,732 6,637
2018-01-23 13 Sand 12,276,378 7,652 5,699
2018-01-23 14 Sand 12,276,378 7,146 5,233
2018-01-23 15 Sand 12,276,378 7,043 6,252
2018-01-23 16 Sand 12,276,378 7,254 5,798
2018-01-23 17 Sand 12,276,378 7,355 5,751
2018-01-24 18 Sand 12,276,378 6,846 5,473
2018-01-24 19 Sand 12,276,378 6,934 5,733
2018-01-24 20 Sand 12,276,378 6,929 5,311
2018-01-24 21 Sand 12,276,378 7,042 6,387
2018-01-24 22 Sand 12,276,378 7,720 7,657
2018-01-25 23 Sand 12,276,378 7,239 5,837
2018-01-25 24 Sand 12,276,378 7,104 6,957
2018-01-25 25 Sand 12,276,378 6,486 5,491
2018-01-25 26 Sand 12,276,378 7,225 7,383
2018-01-25 27 Sand 12,276,378 7,545 6,285
2018-01-25 28 Sand 12,276,378 7,081 5,714
2018-01-26 29 Sand 12,276,378 6,724 4,673
2018-01-26 30 Sand 12,276,378 6,603 6,226
2018-01-26 31 Sand 12,276,378 6,673 6,197
2018-01-26 32 Sand 12,276,378 6,624 6,000
2018-01-26 33 Sand 12,276,378 6,492 6,892
2018-01-26 34 Sand 12,276,378 6,532 5,955
2018-01-29 35 Sand 12,276,378 7,090 5,799
2018-01-29 36 Sand 12,276,378 7,112 6,843
2018-01-29 37 Sand 12,276,378 6,830 5,595
2018-01-29 38 Sand 12,276,378 8,048 8,107
2018-01-30 39 Sand 12,276,378 6,219 7,639

For data sources see[6]

Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2017 PENNENERGY RESOURCES LLC 0.00 0 0.00 0 0.00 0
2018 PENNENERGY RESOURCES LLC 930,313.00 198 0.00 0 0.00 0
2019 PENNENERGY RESOURCES LLC 1,092,792.00 364 0.00 0 0.00 31

For data sources see[7]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2017 PENNENERGY RESOURCES LLC Other Oil & Gas Wastes 132.00 Bbl INJECTION DISPOSAL WELL 34-155-23223
2017 PENNENERGY RESOURCES LLC Drilling Fluid Waste 680.00 Bbl INJECTION DISPOSAL WELL 34-155-23196
2017 PENNENERGY RESOURCES LLC Produced Fluid 281.00 Bbl INJECTION DISPOSAL WELL 34-155-23223
2017 PENNENERGY RESOURCES LLC Drilling Fluid Waste 525.00 Bbl INJECTION DISPOSAL WELL 34-155-23223
2017 PENNENERGY RESOURCES LLC Produced Fluid 240.00 Bbl REUSE (AT WELL PAD)
2017 PENNENERGY RESOURCES LLC Produced Fluid 185.00 Bbl INJECTION DISPOSAL WELL 34-155-23196
2017 PENNENERGY RESOURCES LLC Drill Cuttings 907.37 Tons RESIDUAL WASTE PROCESSING FACILITY PAD085690592
2018 PENNENERGY RESOURCES LLC Drill Cuttings 2.12 Tons RESIDUAL WASTE PROCESSING FACILITY PAD085690592
2018 PENNENERGY RESOURCES LLC Filter Socks 0.47 Tons RESIDUAL WASTE PROCESSING FACILITY 2014-541
2018 PENNENERGY RESOURCES LLC Produced Fluid 9,352.12 Bbl REUSE (AT WELL PAD)
2018 PENNENERGY RESOURCES LLC Produced Fluid 6.85 Tons RESIDUAL WASTE PROCESSING FACILITY 2014-541
2018 PENNENERGY RESOURCES LLC Soil Contaminated by Oil & Gas Related Spills 0.61 Tons RESIDUAL WASTE PROCESSING FACILITY PAD085690592
2018 PENNENERGY RESOURCES LLC Produced Fluid 34.33 Bbl INJECTION DISPOSAL WELL 34-155-23223
2018 PENNENERGY RESOURCES LLC Produced Fluid 42.70 Tons RESIDUAL WASTE PROCESSING FACILITY PAD085690592
2018 PENNENERGY RESOURCES LLC Produced Fluid 49.79 Bbl INJECTION DISPOSAL WELL 34-155-23196
2018 PENNENERGY RESOURCES LLC Drilling Fluid Waste 3.33 Bbl REUSE (AT WELL PAD)
2018 PENNENERGY RESOURCES LLC Servicing Fluid 12.68 Tons RESIDUAL WASTE PROCESSING FACILITY PAD085690592
2018 PENNENERGY RESOURCES LLC Soil Contaminated by Oil 0.61 Tons RESIDUAL WASTE PROCESSING FACILITY PAD085690592
2019 PENNENERGY RESOURCES LLC Produced Fluid 420.28 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW009
2019 PENNENERGY RESOURCES LLC Produced Fluid 51.89 Bbl INJECTION DISPOSAL WELL 34-099-23158
2019 PENNENERGY RESOURCES LLC Produced Fluid 4,210.30 Bbl INJECTION DISPOSAL WELL 34-155-23223
2019 PENNENERGY RESOURCES LLC Produced Fluid 14,049.39 Bbl REUSE (AT WELL PAD)
2019 PENNENERGY RESOURCES LLC Produced Fluid 3,265.58 Bbl INJECTION DISPOSAL WELL 34-155-23196
2019 PENNENERGY RESOURCES LLC Produced Fluid 139.20 Bbl INJECTION DISPOSAL WELL 34-155-22403
2019 PENNENERGY RESOURCES LLC Produced Fluid 16.74 Bbl INJECTION DISPOSAL WELL 34-099-2-3171
2019 PENNENERGY RESOURCES LLC Produced Fluid 557.06 Bbl INJECTION DISPOSAL WELL 34-155-23795
2019 PENNENERGY RESOURCES LLC Waste Water Treatment Sludge 10.24 Tons RESIDUAL WASTE PROCESSING FACILITY 2014-541
2019 PENNENERGY RESOURCES LLC Synthetic Liner Materials 2.65 Tons RESIDUAL WASTE PROCESSING FACILITY PAD085690592
2019 PENNENERGY RESOURCES LLC Produced Fluid 180.47 Bbl INJECTION DISPOSAL WELL 34-155-21893

For data sources see[8]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
2613225 Primary Facility 2017-07-07 Routine/Partial Inspection No Violations Noted
2617608 Primary Facility 2017-07-19 Drilling/Alteration No Violations Noted
2619167 Primary Facility 2017-07-26 Routine/Partial Inspection No Violations Noted
2644841 Primary Facility 2017-09-26 Routine/Partial Inspection No Violations Noted At the time of inspection, Patterson 259 was drilling 8 1/2" hole. Chemicals were all on containment. Pad has multiple layers of containment down. BOP was tested on 9/21 to 5000 psi and passed. 5 1/2" will be used for production casing.
2645173 Primary Facility 2017-10-10 Administrative/File Review No Violations Noted
2647378 Primary Facility 2017-10-03 Routine/Partial Inspection No Violations Noted At the time of inspection, Patterson 259 is onsite over the #2H well. This well had production casing cemented using a lead 1 of 270 sxs HalCem (57 bbls), 14.5 ppg, 1.2 yield and a lead 2 of 770 sxs ShaleCem (165 bbls), 14.5 ppg, 1.2 yield. Tail cement was 1210 sxs SoluCem (406 bbls), 15.2 ppg, 1.83 yield. Plug was bumped, floats held. No cement returned to surface, company man unsure where top was at. They plan to run bond log.

BOP was tested yesterday after moving off of this well.

2661714 Primary Facility 2017-11-17 Routine/Partial Inspection No Violations Noted Pressure Testing Notification submitted 11/16/17 for 11/17/17. Containment onsite. Pressure test in progress. Currently holding pressure while running a log. Renegade Services onsite for pressure test.
2701953 Primary Facility 2018-03-07 Administrative/File Review No Violations Noted
2727920 Primary Facility 2018-05-09 Administrative/File Review No Violations Noted
2755012 Primary Facility 2018-07-23 Routine/Partial Inspection No Violations Noted On 7/23/2018, WQS Brian MacQuarrie onsite. Site sign maintained at entrance. Six wells drilled; 1H-019-22606, 2H-019-22607, 3H-019-22608, 4H-019-22609, 5H-019-22610 and 6H-019-22611. Erosion and Sedimentation BMPs maintained. Vegetative growth well established in previously disturbed areas.
2803258 Primary Facility 2018-11-14 Routine/Partial Inspection No Violations Noted On 11/14/2018, WQS Brian MacQuarrie onsite. Six wells in production, 1H-019-22606, 2H-019-22607, 3H-019-22608, 4H-019-22609, 5H-019-22610 and 6H-019-22611. Tank battery consists of three 400 bbl tanks installed within secondary containment. Tank pad has large AST installed containing impaired water. Freshwater impoundment installed and fenced in. Well development pipeline installed along access road. Erosion and Sedimentation BMPs maintained. Well site vegetated in previously disturbed areas.
2838724 Primary Facility 2019-02-08 Routine/Partial Inspection No Violations Noted On 2/8/2019, WQS Brian MacQuarrie onsite. Site sign maintained at entrance to site. Six wells in production; the 1H (019-22606), 2H (019-22607), 3H (019-22608), 4H (019-22609), 5H (019-22610) and 6H (019-22611). Wells are properly tagged at well head. Production equipment consists of three multi well gas processing units. Tank battery consists of three 400 bbl tanks installed within stainless steel containment structure. Temporary AST installed and maintained on tank pad. Freshwater impoundment fenced in and locked. Erosion and Sedimentation BMPs installed and maintained. Previously disturbed areas well vegetated.

For data sources see[9]

References