37-019-22632

Well Details

Well ID: 37-019-22632
Loading map...
Country: United States
State: Pennsylvania
County: Butler
Municipality: Jefferson Township
Operator Name: PENNENERGY RESOURCES LLC
Well Pad ID: 154359
Farm/Lease Name: PER W71 1H
License Status:
Spud Date: 2018-02-07
Permit Date: 2017-07-21
Well Type: GAS
Unconventional Well: Y
Configuration: Horizontal Well
Conservation: No
Latitude: 40.747342
Longitude: -79.8376

For data sources see[1][2][3]

Well History

Date Event
Deviated
2017-07-21 New Permit Application
2017-10-31 MOD
2018-02-07 Performed Spud Operation
2018-11-15 MOD
2019-04-16 Drilling Completion

For data sources see[4]


Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2019 PENNENERGY RESOURCES LLC 437,877.00 89 0.00 0 0.00 29

For data sources see[5]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2018 PENNENERGY RESOURCES LLC Produced Fluid 492.70 Bbl REUSE (AT WELL PAD)
2018 PENNENERGY RESOURCES LLC Drill Cuttings 190.72 Tons RESIDUAL WASTE PROCESSING FACILITY PAD085690592
2018 PENNENERGY RESOURCES LLC Drilling Fluid Waste 51.67 Bbl REUSE (AT WELL PAD)
2018 PENNENERGY RESOURCES LLC Drilling Fluid Waste 20.00 Bbl INJECTION DISPOSAL WELL 34-155-23196
2018 PENNENERGY RESOURCES LLC Drilling Fluid Waste 26.67 Bbl INJECTION DISPOSAL WELL 34-155-23223
2019 PENNENERGY RESOURCES LLC Drill Cuttings 584.71 Tons RESIDUAL WASTE PROCESSING FACILITY PAD085690592
2019 PENNENERGY RESOURCES LLC Filter Socks 1.86 Tons RESIDUAL WASTE PROCESSING FACILITY 2014-541
2019 PENNENERGY RESOURCES LLC Produced Fluid 210.90 Bbl INJECTION DISPOSAL WELL 34-155-24079
2019 PENNENERGY RESOURCES LLC Servicing Fluid 25.00 Bbl INJECTION DISPOSAL WELL 34-155-23223
2019 PENNENERGY RESOURCES LLC Produced Fluid 79.17 Bbl INJECTION DISPOSAL WELL 34-155-22403
2019 PENNENERGY RESOURCES LLC Produced Fluid 497.11 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW009
2019 PENNENERGY RESOURCES LLC Produced Fluid 8,958.00 Bbl INJECTION DISPOSAL WELL 34-155-23196
2019 PENNENERGY RESOURCES LLC Produced Fluid 15,765.06 Bbl REUSE (AT WELL PAD)
2019 PENNENERGY RESOURCES LLC Drilling Fluid Waste 638.00 Bbl INJECTION DISPOSAL WELL 34-155-23196
2019 PENNENERGY RESOURCES LLC Produced Fluid 20.00 Bbl INJECTION DISPOSAL WELL 34-155-23795
2019 PENNENERGY RESOURCES LLC Produced Fluid 9,249.50 Bbl INJECTION DISPOSAL WELL 34-099-23158
2019 PENNENERGY RESOURCES LLC Produced Fluid 49.87 Tons RESIDUAL WASTE PROCESSING FACILITY 2014-541
2019 PENNENERGY RESOURCES LLC Produced Fluid 8,230.00 Bbl INJECTION DISPOSAL WELL 34-155-23223
2019 PENNENERGY RESOURCES LLC Servicing Fluid 14.77 Tons RESIDUAL WASTE PROCESSING FACILITY PAD085690592
2019 PENNENERGY RESOURCES LLC Drilling Fluid Waste 878.00 Bbl INJECTION DISPOSAL WELL 34-155-23223

For data sources see[6]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
2691188 Primary Facility 2018-02-06 Administrative/File Review No Violations Noted
2692948 Primary Facility 2018-02-08 Routine/Partial Inspection No Violations Noted At the time of inspection, Rocky Mountain was onsite plowing snow from around the well stakes. A SR-30 Soilmec auger rig was started and being cleared of the ice/snow. None of the wells have been spud yet. 8' x 8' cellars were sitting on a trailer and 16" conductor pipe was being unloaded from another. ER sign was posted at the lease entrance. Permit sign was being installed while I was leaving site. There was a company rep onsite that had paper copies of all the permits.
2695477 Primary Facility 2018-02-12 Routine/Partial Inspection No Violations Noted At the time of inspection, a welder was onsite welding well plates with well numbers on to each well. 16" conductor pipe has been cemented in and are 40' in depth. Cellar is also cemented in. Pad was snow covered. Well was covered with a steel plate and a cattle fence was surrounding. There is still construction activity just off of the pad, along the lease road.
2706897 Primary Facility 2018-03-19 Routine/Partial Inspection No Violations Noted On 3/19/2018, WQS Brian MacQuarrie onsite. Site sign installed and maintained at entrance. Site constructed with exception to freshwater impoundment. Erosion and Sedimentation best management practices installed. Site temporarily stabilized with seed and mulch. Drilling commenced at six locations on the well pad ( 1H-Permit No. 37-019-22632, 2H- Permit No. 37-019-22656, 3H- Permit No. 37-019-22657, 4H- Permit No. 37-019-22658, 5H- Permit No. 37-019-22659 and 6H-Permit No. 37-019-22660. Steel plates and cages installed at each location.
2731843 Primary Facility 2018-05-21 Administrative/File Review No Violations Noted
2735683 Primary Facility 2018-05-24 Drilling/Alteration No Violations Noted At the time of inspection, Highlands rig 9 was onsite drilling 10 7/8" hole. Berms for containment were being repaired as well. Chemicals were on containment and fuel within double containment. Sound walls were up on side of pad facing the access road. Surface casing has been cemented using 315 sxs Class A (67 bbls), 1% CaCl2, 1% Gypsum, 15.8 ppg, 1.2 yield. This was displaced with 61 bbls water. Plug was bumped and floats held. 15 bbls cement returned to surface.
2735985 Primary Facility 2018-05-30 Routine/Partial Inspection No Violations Noted At the time of inspection, Highlands rig 9 was onsite drilling on the #2H well. This well had intermediate casing cemented using 770 sxs Class A (163 bbls), 0.5% CaCl2, 1% Gypsum, 15.8 ppg, 1.19 yield. This was displaced with 173 bbls water. Plug was bumped and floats held. 26 bbls cement returned to surface.
2763613 Primary Facility 2018-08-14 Routine/Partial Inspection No Violations Noted On 8/14/2018, WQS Brian MacQuarrie onsite. Site sign installed at entrance . Erosion and Sedimentation plan onsite. Freshwater impoundment excavated and fenced in not lined. Two infiltration basins installed. The well pad consists of six wells partially drilled Permit Nos. 019-22632, 019-22656, 019-22657, 019-22658, 019-22659 and 019-22660. Containment liner setup around wells. Five frac tanks staged within containment. No activity onsite.

For data sources see[7]