X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

37-019-22682

Well Details

Well ID: 37-019-22682
Loading map...
Country: United States
State: Pennsylvania
County: Butler
Municipality: Winfield Township
Operator Name: PENNENERGY RESOURCES LLC
Well Pad ID: 153870
Farm/Lease Name: PER W45 4H
License Status:
Spud Date: 2018-09-13
Permit Date: 2017-10-17
Well Type: GAS
Unconventional Well: Y
Configuration: Horizontal Well
Conservation: No
Latitude: 40.776011
Longitude: -79.729486

For data sources see[1][2][3]

Well History

Date Event
Deviated
2017-10-17 New Permit Application
2018-09-13 Performed Spud Operation
2018-09-14 MOD
2019-02-24 Drilling Completion

For data sources see[4]


Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2019 PENNENERGY RESOURCES LLC 1,233,450.00 164 0.00 0 0.00 31

For data sources see[5]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2018 PENNENERGY RESOURCES LLC Drill Cuttings 347.12 Tons RESIDUAL WASTE PROCESSING FACILITY PAD085690592
2018 PENNENERGY RESOURCES LLC Drilling Fluid Waste 1,619.12 Bbl REUSE (AT WELL PAD)
2019 PENNENERGY RESOURCES LLC Drill Cuttings 868.93 Tons RESIDUAL WASTE PROCESSING FACILITY PAD085690592
2019 PENNENERGY RESOURCES LLC Drilling Fluid Waste 1,020.00 Bbl INJECTION DISPOSAL WELL 34-155-23196
2019 PENNENERGY RESOURCES LLC Drilling Fluid Waste 120.00 Bbl REUSE (AT WELL PAD)
2019 PENNENERGY RESOURCES LLC Waste Water Treatment Sludge 8.30 Tons RESIDUAL WASTE PROCESSING FACILITY 2014-541
2019 PENNENERGY RESOURCES LLC Produced Fluid 467.26 Bbl INJECTION DISPOSAL WELL 34-099-23158
2019 PENNENERGY RESOURCES LLC Drilling Fluid Waste 600.00 Bbl INJECTION DISPOSAL WELL 34-155-23223
2019 PENNENERGY RESOURCES LLC Produced Fluid 27.69 Bbl INJECTION DISPOSAL WELL 34-155-23196
2019 PENNENERGY RESOURCES LLC Produced Fluid 35.85 Tons RESIDUAL WASTE PROCESSING FACILITY 2014-541
2019 PENNENERGY RESOURCES LLC Produced Fluid 34,093.70 Bbl REUSE (AT WELL PAD)
2019 PENNENERGY RESOURCES LLC Servicing Fluid 25.05 Tons RESIDUAL WASTE PROCESSING FACILITY PAD085690592

For data sources see[6]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
2793303 Primary Facility 2018-10-22 Routine/Partial Inspection No Violations Noted At the time of inspection, this well has been spud to a depth of 40' by Rocky Mountain Drilling. This was started on September 13th.

Currently, a Highland 8 is over the 7H well. This well will have top hole drilled soon.

2794575 Primary Facility 2018-10-24 Routine/Partial Inspection No Violations Noted On 10/24/2018, WQS Brian MacQuarrie onsite. Meet with Ken Silvis -onsite drill manager. Highlands Rig #8 onsite drilling top portion (approximately 2,800 feet), of 6 wells; 2H-019-22566, 3H-019-22681, 4H-019-22682, 6H-019-22683, 7H-019-22684 and 8H-019-22685. Well site secondary containment setup on pad. Frac tanks installed within secondary containment. Freshwater impoundment fenced in and lined. Erosion and Sedimentation BMPs installed and maintained. Vegetative growth well established.
2797626 Primary Facility 2018-11-02 Administrative/File Review No Violations Noted Cement job log received by email on 10/30/18.
2797651 Primary Facility 2018-11-02 Administrative/File Review No Violations Noted Cement job 8-5/8 log received by email.
2801803 Primary Facility 2018-11-13 Routine/Partial Inspection No Violations Noted On 11/13/2018, WQS Brian MacQuarrie onsite. Highlands drill rig #8 no longer onsite. Six wells top hole drilled, 2H-019-22566, 3H-019-22681, 4H-019-22682, 6H-019-22683, 7H-019-22684 and 8H-019-22685. No current activity onsite. Well containment setup. Frac tanks staged on tank pad. Well development impoundment fenced in and maintained. Erosion and Sedimentation best management practices maintained. Vegetation well established.
2827777 Primary Facility 2019-01-15 Routine/Partial Inspection No Violations Noted On 1/15/19, WQS Brian MacQuarrie onsite. Patterson Rig # 259 onsite completing the drilling of six wells; 2H-019-22566, 3H-019-22681, 4H-019-22682, 6H-019-22683, 7H-019-22684 and 8H-019-22685. Well site secondary containment maintained. Snow on ground during inspection.
2832687 Primary Facility 2019-01-28 Routine/Partial Inspection No Violations Noted On 1/28/2019, WQS Brian MacQuarrie onsite. Patterson Rig #259 onsite. Drilling completed at the 6H-019-22683, 7H-019-22684 and 8H-019-22685. Drilling at the 2H-019-22566, 3H-019-22681 and 4H-019-22682 still in process. Well site secondary containment maintained. Freshwater impoundment fenced in and lined. Snow on ground during inspection.
2852372 Primary Facility 2019-03-12 Administrative/File Review No Violations Noted Production casing cementing report received 2/26/19

For data sources see[7]

References