37-019-22695

Well Details

Well ID: 37-019-22695
Loading map...
Country: United States
State: Pennsylvania
County: Butler
Municipality: Penn Township
Operator Name: PENNENERGY RESOURCES LLC
Well Pad ID: 154783
Farm/Lease Name: HOFER UNIT 4H
License Status:
Spud Date: 2017-12-16
Permit Date: 2017-10-16
Well Type: GAS
Unconventional Well: Y
Configuration: Horizontal Well
Conservation: No
Latitude: 40.747567
Longitude: -79.905067

For data sources see[1][2][3]

Well History

Date Event
Deviated
2017-10-16 New Permit Application
2017-12-14 Performed Spud Operation
2017-12-15 MOD
2018-01-20 Drilling Completion

For data sources see[4]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2018-03-27 2018-04-17 6,099 10,467,800 0

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 FR 9400 StimStream Friction Reducer Ammonium acetate 631-61-8 10 0.007661 7775
Alcohols C10-16 68002-97-1 3.6 0.00275796 2799
Alcohols C12-16 ethoxylated 68551-12-2 3.6 0.00275796 2799
Distillates (petroleum), hydrotreated light 64742-47-8 25 0.019153 19438
Alcohols C12-14 ethoxylated 68439-50-9 3.6 0.00275796 2799
StimLube F FloTek Friction Reducer Water 7732-18-5 60 0.00139744 1418.23
Ethoxylated alcohols 68439-50-9 5 0.000116453 118.186
Hydrotreated light distillate 64742-47-8 30 0.000698719 709.116
Ammonium Chloride 12125-02-9 20 0.000465813 472.744
Ammonium acrylate 10604-69-0 1 0.00002329 23.637
Ethoxylated alcohols 68002-97-1 5 0.000116453 118.186
Ethoxylated alcohols 68551-12-2 5 0.000116453 118.186
Alpha 123 Baker Hughes Biocide Ethanol 64-17-5 2 0.000594159 603
Glutaraldehyde 111-30-8 12.5 0.00371078 3766
Water 7732-18-5 82.5 0.0244925 24857
Alkyl Quaternary Compound 7173-51-5 1.2 0.000356692 362
Quarternary Ammonium Compound 68424-85-1 1.8 0.000534053 542
FR 7020 ECM Friction Reducer Water 2-Propenoic Acid, Ammonium Salt 7732-18-5 50 0.00548439 5566
Ethoxylated alcohols 68002-97-1 4 0.00003941 40
Ammonium acetate 631-61-8 20 0.000987309 1002
Ethoxylated alcohols 68439-50-9 4 0.00003941 40
Ethoxylated alcohols 68551-12-2 4 0.00003941 40
Hydrotreated Petroleum Distaillate 64742-47-8 45 0.00246827 2505
Polymer with 2-Propenamide, Sodium salt 910644-97-2 45 0.00246827 2505
Sand ProFrac Proppant Silica Substrate 14808-60-7 100 12.5037 12,689,800.0
ProHib 100 ProFrac Acid Inhibitor Water 7732-18-5 85 0.0106929 10852
2-Polyn-1-ol compound w/ methyloxirane 38172-91-7 15 0.00188692 1915
Scaletrol 767W Baker Hughes Biocide Methanol 67-56-1 30 0.00697028 7074
Ammonium Chloride 12125-02-9 1 0.00023254 236
Water 7732-18-5 75 0.0174257 17685
Organophosphonate 129828-36-0 15 0.00348514 3537
Water Rex Energy Carrier/Base Water 7732-18-5 100 86.0729 87,353,700.0
Hydrochloric Acid (7.5%) Cooper Natural Acidizing Hydrochloric Acid (Hydrogen Chloride) 7647-01-0 28 0.352119 357359
Water 7732-18-5 72 0.905451 918924
ProFE 105 ProFrac Iron Control Water 7732-18-5 70 0.00316885 3216
Citric Acid 77-92-9 40 0.00181105 1838
Sulphamic Acid 5329-14-6 5 0.000226628 230
StimLube W FloTek Friction Reducer Hydrotreated light distillate 64742-47-8 30 0.00152181 1544.46
Ethoxylated alcohols 68551-12-2 5 0.000253636 257.41
Ammonium acetate 631-61-8 10 0.000232906 236.372
Ethoxylated alcohols 68002-97-1 5 0.000253636 257.41
Water 7732-18-5 40 0.000931626 945.489
Ethoxylated alcohols 68439-50-9 5 0.000253636 257.41
Butylated hydroxytoluene 128-37-0 0.9 0.00002096 21.273
Other Chemical(s) Listed Above See Trade Name(s) List Ethoxylated alcohols 68002-97-1 4 0.00003941 40
Glutaraldehyde 111-30-8 12.5 0.00371078 3766
Ethoxylated alcohols 68551-12-2 5 0.000253636 257.41
Ethoxylated alcohols 68439-50-9 5 0.000116453 118.186
Ammonium acetate 631-61-8 20 0.000987309 1002
Water 7732-18-5 60 0.00139744 1418.23
Quarternary Ammonium Compound 68424-85-1 1.8 0.000534053 542
Ethoxylated alcohols 68002-97-1 5 0.000116453 118.186
Water 7732-18-5 40 0.000931626 945.489
Ethoxylated alcohols 68551-12-2 4 0.00003941 40
Hydrotreated Petroleum Distaillate 64742-47-8 45 0.00246827 2505
Ethanol 64-17-5 2 0.000594159 603
Ammonium acetate 631-61-8 10 0.000232906 236.372
Ethoxylated alcohols 68002-97-1 5 0.000253636 257.41
Ammonium acrylate 10604-69-0 1 0.00002329 23.637
Alkyl Quaternary Compound 7173-51-5 1.2 0.000356692 362
Citric Acid 77-92-9 40 0.00181105 1838
Water 7732-18-5 75 0.0174257 17685
Polymer with 2-Propenamide, Sodium salt 910644-97-2 45 0.00246827 2505
Organophosphonate 129828-36-0 15 0.00348514 3537
Alcohols C10-16 68002-97-1 3.6 0.00275796 2799
Ammonium acetate 631-61-8 10 0.007661 7775
Butylated hydroxytoluene 128-37-0 0.9 0.00002096 21.273
Ethoxylated alcohols 68439-50-9 5 0.000253636 257.41
Ethoxylated alcohols 68439-50-9 4 0.00003941 40
Water 7732-18-5 85 0.0106929 10852
Hydrochloric Acid (Hydrogen Chloride) 7647-01-0 28 0.352119 357359
Sulphamic Acid 5329-14-6 5 0.000226628 230
Ammonium Chloride 12125-02-9 20 0.000465813 472.744
Alcohols C12-16 ethoxylated 68551-12-2 3.6 0.00275796 2799
Ammonium Chloride 12125-02-9 1 0.00023254 236
Ethoxylated alcohols 68551-12-2 5 0.000116453 118.186
Alcohols C12-14 ethoxylated 68439-50-9 3.6 0.00275796 2799

For data sources see[5]

Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2017 RE GAS DEV LLC 0.00 0 0.00 0 0.00 0
2018 PENNENERGY RESOURCES LLC 1,043,132.89 210 0.00 0 0.00 0
2019 PENNENERGY RESOURCES LLC 1,409,525.00 364 0.00 0 0.00 31

For data sources see[6]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2017 RE GAS DEV LLC Drill Cuttings 117.88 Tons LANDFILL 100585
2018 RE GAS DEV LLC Produced Fluid 1,790.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC010
2018 RE GAS DEV LLC Produced Fluid 3,526.00 Bbl REUSE (AT WELL PAD)
2018 RE GAS DEV LLC Produced Fluid 910.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0254185
2018 RE GAS DEV LLC Drilling Fluid Waste 12.38 Tons CENT WASTE TRT FAC NPDES DISCHARGE EPA ID: 748-163
2018 RE GAS DEV LLC Drill Cuttings 789.90 Tons LANDFILL 100585
2018 PENNENERGY RESOURCES LLC Produced Fluid 777.30 Bbl INJECTION DISPOSAL WELL 34-155-23223
2018 RE GAS DEV LLC Produced Fluid 55.02 Tons CENT WASTE TRT FAC NPDES EPA ID: 748-163
2018 RE GAS DEV LLC Produced Fluid 10,892.00 Bbl INJECTION DISPOSAL WELL 34-099-23158
2018 PENNENERGY RESOURCES LLC Produced Fluid 629.30 Bbl INJECTION DISPOSAL WELL 34-155-23196
2018 RE GAS DEV LLC Drilling Fluid Waste 12.38 Tons CENT WASTE TRT FAC NPDES EPA ID: 748-163
2018 RE GAS DEV LLC Produced Fluid 1,790.00 Bbl INJECTION DISPOSAL WELL 34-155-24079
2018 RE GAS DEV LLC Produced Fluid 55.02 Tons CENT WASTE TRT FAC NPDES DISCHARGE EPA ID: 748-163
2018 RE GAS DEV LLC Drilling Fluid Waste 2,650.00 Bbl INJECTION DISPOSAL WELL 34-155-24079
2019 PENNENERGY RESOURCES LLC Produced Fluid 1,344.94 Bbl INJECTION DISPOSAL WELL 34-099-23158
2019 PENNENERGY RESOURCES LLC Produced Fluid 1,597.95 Bbl REUSE (AT WELL PAD)
2019 PENNENERGY RESOURCES LLC Produced Fluid 740.00 Bbl INJECTION DISPOSAL WELL 34-155-23223
2019 PENNENERGY RESOURCES LLC Waste Water Treatment Sludge 0.64 Tons RESIDUAL WASTE PROCESSING FACILITY 2014-541
2019 PENNENERGY RESOURCES LLC Produced Fluid 296.61 Bbl INJECTION DISPOSAL WELL 34-155-23196

For data sources see[7]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
2673342 Primary Facility 2017-12-20 Routine/Partial Inspection No Violations Noted On site for a routine partial inspection.

Spudding operations underway at time of inspection.

All E/S controls and BMPs installed. Well pad and site construction and rocking has been completed. Sound wall installed. Construction of AST pad still ongoing. Site stabilized with mulching and tracking. Work on gathering pipeline also underway at well pad.

The Department requests that hill slope adjacent to well pad that is not mulched be mulched as soon as possible.

2675161 Primary Facility 2017-12-19 Routine/Partial Inspection No Violations Noted At the time of inspection, HAD Drilling Contractors was onsite using a DR-24 rotary rig rotating 24" conductor into the 3H well. The same size conductor was set on this well to a depth of 80'. Cuttings were being sent to an open top tank. Pad is still being worked on. There were several piles of gravel onsite to be spread out on the location. Some matting boards were sitting on the pad as well. There were 32' sound walls surrounding the entire pad. The permit signs and Emergency Response sign were posted at the entrance to the access road.
2684488 Primary Facility 2018-01-22 Administrative/File Review No Violations Noted
2684575 Primary Facility 2018-01-22 Administrative/File Review No Violations Noted
2687348 Primary Facility 2018-01-17 Drilling/Alteration No Violations Noted At the time of inspection, Sidewinder 62 was onsite and just finished drilling tangent on air. Circulating hole on air then will load well with diesel-based mud.

Surface casing was cemented using 490 sxs Class A (107 bbls), 3% CaCl2, 2% Gypsum, 15.6 ppg, 1.23 yield. Displacement was 64 bbls water. Plug landed and floats held. 26 bbls cement were returned to surface. A float shoe and float collar were used along with 7 centralizers. Intermediate casing had been cemented using a lead of 135 sxs Class A (30 bbls), 2% CaCl2, 15.2 ppg, 1.26 yield and tail of 500 sxs Class A (109 bbls), 2% CaCl2, 2% Gypsum, 15.6 ppg, 1.22 yield. Displacement was 141 bbls water. Plug landed and floats held. 30 bbls cement were returned to surface. A float shoe and float collar were used along with 23 centralizers. BOP was tested on 1/14. 700 bbls/hr brine water was encountered starting at 1430'.

2687365 Primary Facility 2018-01-22 Drilling/Alteration No Violations Noted At the time of inspection, Sidewinder 62 was waiting on cement. A catwalk issue had slowed things down on casing run so cement job did not complete until 6 AM this morning.

Production casing was cemented using a lead of 755 sxs Class A (197 bbls), 4% Bentonite, 14.4 ppg, 1.47 yield and tail of 960 sxs Class A (338 bbls), 14.8 ppg, 1.98 yield. Displacement was 280 bbls water. Plug landed on 2nd attempt and floats held. 80 bbls spacer were returned to surface. Top of cement calculated to be about 230' down. A float shoe and float collar were used along with 254 centralizers.

2703819 Primary Facility 2018-03-12 Administrative/File Review No Violations Noted
2704936 Primary Facility 2018-03-14 Administrative/File Review No Violations Noted
2720700 Primary Facility 2018-04-19 Routine/Partial Inspection No Violations Noted On 4/19/2018, WQS Brian MacQuarrie onsite to conduct inspection. Sign installed at entrance to site. Access road maintained. Profrac onsite conducting well stimulation operations at 5 wells, 3 wells completed. The permit numbers for the wells are: 1H-019-22717, 2H- 019-22698, 3H-019-22718, 4H-019-22695 and the 8H-019-22699. Secondary containment setup onsite. Erosion and Sedimentation best management practices installed and maintained. Site stabilized with seed and mulch.
2734886 Primary Facility 2018-05-29 Administrative/File Review No Violations Noted
2779548 Primary Facility 2018-09-24 Routine/Partial Inspection No Violations Noted On 9/24/2018, WQS Brian MacQuarrie onsite. Five wells in production, 1H(019-22717), 2H(019-22698), 3H(019-22718), 4H(019-22695) and 8H(019-22700). Six 400 bbl tanks in stainless installed within steel containment structure. Erosion and Sedimentation BMPs installed and maintained. Vegetative growth well established.
2830315 Primary Facility 2019-01-17 Routine/Partial Inspection No Violations Noted On 1/17/2019, WQSS Scott Lux and WQS Brian MacQuarrie onsite. Snow covered ground during inspection. Site consists of five wells in production; 1H-019-22717, 2H-019-22698, 3H-019-22718, 4H-019-22695 and 8H-019-22699. Tank battery consists of six 400 bbl tanks installed within stainless steel containment structure. On 9/7/2018, operator submitted well site restoration extension request through e-submission. The most recent well drilled was the 3H. Drilling on this well was completed on 3/2/2018. On 9/24/2018, WQS Brian MacQuarrie conducted inspection and observed that site was stabilized and erosion and sedimentation best management practices were installed and maintained. Therefore, the well site restoration request is approved until 9/6/2020.

For data sources see[8]