If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 37-019-22698 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.747525,"lon":-79.905067,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Butler | |
Municipality: Penn Township | |
Operator Name: PENNENERGY RESOURCES LLC | |
Well Pad ID: 154783 | |
Farm/Lease Name: HOFER UNIT 2H | |
License Status: | |
Spud Date: 2017-12-14 | |
Permit Date: 2017-12-05 | |
Well Type: GAS | |
Unconventional Well: Y | |
Configuration: Horizontal Well | |
Conservation: No | |
Latitude: 40.747525 | |
Longitude: -79.905067 |
Date | Event |
---|---|
Deviated | |
2017-12-05 | New Permit Application |
2017-12-14 | Performed Spud Operation |
2018-01-10 | Drilling Completion |
For data sources see[4]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 2018-03-26 | 2018-04-16 | 6,108 | 9,916,370 | 0 |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | Hydrochloric Acid (7.5%) | Cooper Natural | Acidizing | Water | 7732-18-5 | 72 | 0.0834697 | 79138 |
Hydrochloric Acid (Hydrogen Chloride) | 7647-01-0 | 28 | 0.0324605 | 30776 | ||||
Sand | ProFrac | Proppant | Silica Substrate | 14808-60-7 | 100 | 12.4471 | 11,801,100.0 | |
ProHib 100 | ProFrac | Acid Inhibitor | 2-Polyn-1-ol compound w/ methyloxirane | 38172-91-7 | 15 | 0.00482964 | 4579 | |
Water | 7732-18-5 | 85 | 0.0273693 | 25949 | ||||
Water | Rex Energy | Carrier/Base | Water | 7732-18-5 | 100 | 87.2816 | 82,752,100.0 | |
Other Chemical(s) | Listed Above | See Trade Name(s) List | Ammonium acetate | 631-61-8 | 10 | 0.00353547 | 3352 | |
Alcohols C12-16 ethoxylated | 68551-12-2 | 3.6 | 0.00127307 | 1207 | ||||
Ethoxylated alcohols | 68002-97-1 | 4 | 0.00003059 | 29 | ||||
Quarternary Ammonium Compound | 68424-85-1 | 1.8 | 0.00053686 | 509 | ||||
Sulphamic Acid | 5329-14-6 | 5 | 0.00057905 | 549 | ||||
Polymer with 2-Propenamide, Sodium salt | 910644-97-2 | 45 | 0.00378756 | 3591 | ||||
Ethoxylated alcohols | 68439-50-9 | 4 | 0.00003059 | 29 | ||||
Hydrochloric Acid (Hydrogen Chloride) | 7647-01-0 | 28 | 0.0324605 | 30776 | ||||
Water | 7732-18-5 | 75 | 0.0180929 | 17154 | ||||
Distillates (petroleum), hydrotreated light | 64742-47-8 | 45 | 0.0476435 | 45171 | ||||
Citric Acid | 77-92-9 | 40 | 0.00463556 | 4395 | ||||
Alcohols C12-14 ethoxylated | 68439-50-9 | 3.6 | 0.00127307 | 1207 | ||||
Ammonium Chloride | 12125-02-9 | 1 | 0.000241534 | 229 | ||||
Hydrotreated Petroleum Distaillate | 64742-47-8 | 45 | 0.00378756 | 3591 | ||||
Alkyl Quaternary Compound | 7173-51-5 | 1.2 | 0.000357555 | 339 | ||||
Alcohols C10-16 | 68002-97-1 | 3.6 | 0.00127307 | 1207 | ||||
Ethanol | 64-17-5 | 2 | 0.000595926 | 565 | ||||
Organophosphonate | 129828-36-0 | 15 | 0.0036188 | 3431 | ||||
Water | 7732-18-5 | 85 | 0.0273693 | 25949 | ||||
Ethoxylated alcohols | 68551-12-2 | 4 | 0.00003059 | 29 | ||||
Glutaraldehyde | 111-30-8 | 12.5 | 0.00372638 | 3533 | ||||
Ammonium acetate | 631-61-8 | 20 | 0.0007573 | 718 | ||||
FR 7020 | ECM | Friction Reducer | Ethoxylated alcohols | 68439-50-9 | 4 | 0.00003059 | 29 | |
Ammonium acetate | 631-61-8 | 20 | 0.0007573 | 718 | ||||
Ethoxylated alcohols | 68002-97-1 | 4 | 0.00003059 | 29 | ||||
Polymer with 2-Propenamide, Sodium salt | 910644-97-2 | 45 | 0.00378756 | 3591 | ||||
Water 2-Propenoic Acid, Ammonium Salt | 7732-18-5 | 50 | 0.00841785 | 7981 | ||||
Hydrotreated Petroleum Distaillate | 64742-47-8 | 45 | 0.00378756 | 3591 | ||||
Ethoxylated alcohols | 68551-12-2 | 4 | 0.00003059 | 29 | ||||
Alpha 123 | Baker Hughes | Biocide | Water | 7732-18-5 | 82.5 | 0.0245922 | 23316 | |
Ethanol | 64-17-5 | 2 | 0.000595926 | 565 | ||||
Quarternary Ammonium Compound | 68424-85-1 | 1.8 | 0.00053686 | 509 | ||||
Glutaraldehyde | 111-30-8 | 12.5 | 0.00372638 | 3533 | ||||
Alkyl Quaternary Compound | 7173-51-5 | 1.2 | 0.000357555 | 339 | ||||
ProFE 105 | ProFrac | Iron Control | Sulphamic Acid | 5329-14-6 | 5 | 0.00057905 | 549 | |
Water | 7732-18-5 | 70 | 0.00811303 | 7692 | ||||
Citric Acid | 77-92-9 | 40 | 0.00463556 | 4395 | ||||
FR 9400 | StimStream | Friction Reducer | Ammonium acetate | 631-61-8 | 10 | 0.00353547 | 3352 | |
Distillates (petroleum), hydrotreated light | 64742-47-8 | 25 | 0.00883869 | 8380 | ||||
Alcohols C12-14 ethoxylated | 68439-50-9 | 3.6 | 0.00127307 | 1207 | ||||
Alcohols C10-16 | 68002-97-1 | 3.6 | 0.00127307 | 1207 | ||||
Alcohols C12-16 ethoxylated | 68551-12-2 | 3.6 | 0.00127307 | 1207 | ||||
ProBreak 100 | ProFrac | Oxidizer | Ammonium Persulfate | 7727-54-0 | 100 | 0.000932386 | 884 | |
4.0 Guar Slurry | ProFrac | Proppant Transport | Guar Gum | 9000-30-0 | 55 | 0.0582299 | 55208 | |
Distillates (petroleum), hydrotreated light | 64742-47-8 | 45 | 0.0476435 | 45171 | ||||
Scaletrol 767W | Baker Hughes | Biocide | Methanol | 67-56-1 | 30 | 0.00723654 | 6861 | |
Water | 7732-18-5 | 75 | 0.0180929 | 17154 | ||||
Ammonium Chloride | 12125-02-9 | 1 | 0.000241534 | 229 | ||||
Organophosphonate | 129828-36-0 | 15 | 0.0036188 | 3431 |
For data sources see[5]
Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
---|---|---|---|---|---|---|---|
2017 | RE GAS DEV LLC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2018 | PENNENERGY RESOURCES LLC | 951,935.55 | 210 | 0.00 | 0 | 0.00 | 0 |
2019 | PENNENERGY RESOURCES LLC | 1,313,518.00 | 364 | 0.00 | 0 | 0.00 | 31 |
For data sources see[6]
Period | Operator | Waste Type | Quantity | Disposal Method | Waste Facility ID |
---|---|---|---|---|---|
2017 | RE GAS DEV LLC | Drilling Fluid Waste | 110.00 Bbl | REUSE (AT WELL PAD) | |
2017 | RE GAS DEV LLC | Drill Cuttings | 63.59 Tons | LANDFILL | 100585 |
2018 | RE GAS DEV LLC | Produced Fluid | 285.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NC010 |
2018 | RE GAS DEV LLC | Produced Fluid | 6,077.00 Bbl | REUSE (AT WELL PAD) | |
2018 | RE GAS DEV LLC | Drilling Fluid Waste | 880.00 Bbl | REUSE (AT WELL PAD) | |
2018 | RE GAS DEV LLC | Produced Fluid | 120.00 Bbl | INJECTION DISPOSAL WELL | 34-157-25506 |
2018 | RE GAS DEV LLC | Produced Fluid | 1,020.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0254185 |
2018 | RE GAS DEV LLC | Drilling Fluid Waste | 13.73 Tons | CENT WASTE TRT FAC NPDES DISCHARGE | EPA ID: 748-163 |
2018 | RE GAS DEV LLC | Drill Cuttings | 852.00 Tons | LANDFILL | 100585 |
2018 | PENNENERGY RESOURCES LLC | Produced Fluid | 562.30 Bbl | INJECTION DISPOSAL WELL | 34-155-23223 |
2018 | RE GAS DEV LLC | Produced Fluid | 478.08 Bbl | CENT WASTE TRT FAC NPDES | EPA ID: 748-163 |
2018 | RE GAS DEV LLC | Produced Fluid | 11,352.00 Bbl | INJECTION DISPOSAL WELL | 34-099-23158 |
2018 | PENNENERGY RESOURCES LLC | Produced Fluid | 438.30 Bbl | INJECTION DISPOSAL WELL | 34-155-23196 |
2018 | RE GAS DEV LLC | Drilling Fluid Waste | 13.73 Tons | CENT WASTE TRT FAC NPDES | EPA ID: 748-163 |
2018 | RE GAS DEV LLC | Produced Fluid | 1,953.00 Bbl | INJECTION DISPOSAL WELL | 34-155-24079 |
2018 | RE GAS DEV LLC | Produced Fluid | 478.08 Bbl | CENT WASTE TRT FAC NPDES DISCHARGE | EPA ID: 748-163 |
2018 | RE GAS DEV LLC | Drilling Fluid Waste | 2,215.00 Bbl | INJECTION DISPOSAL WELL | 34-155-24079 |
2019 | PENNENERGY RESOURCES LLC | Produced Fluid | 1,264.04 Bbl | INJECTION DISPOSAL WELL | 34-099-23158 |
2019 | PENNENERGY RESOURCES LLC | Produced Fluid | 863.07 Bbl | REUSE (AT WELL PAD) | |
2019 | PENNENERGY RESOURCES LLC | Produced Fluid | 90.00 Bbl | INJECTION DISPOSAL WELL | 34-155-23223 |
2019 | PENNENERGY RESOURCES LLC | Waste Water Treatment Sludge | 0.60 Tons | RESIDUAL WASTE PROCESSING FACILITY | 2014-541 |
2019 | PENNENERGY RESOURCES LLC | Produced Fluid | 134.99 Bbl | INJECTION DISPOSAL WELL | 34-155-23196 |
For data sources see[7]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
2675159 | Primary Facility | 2017-12-19 | Routine/Partial Inspection | No Violations Noted | At the time of inspection, HAD Drilling Contractors was onsite using a DR-24 rotary rig rotating 24" conductor into the 3H well. The same size conductor was set on this well to a depth of 80'. Cuttings were being sent to an open top tank. Pad is still being worked on. There were several piles of gravel onsite to be spread out on the location. Some matting boards were sitting on the pad as well. There were 32' sound walls surrounding the entire pad. The permit signs and Emergency Response sign were posted at the entrance to the access road. |
2678970 | Primary Facility | 2018-01-03 | Drilling/Alteration | No Violations Noted | At the time of inspection, Sidewinder 62 was picking up BHA for intermediate section. BOP was tested this morning. Surface casing was cemented using 465 sxs (102 bbls) Class A, 15.6 ppg, 1.23 yield. 68 bbls freshwater was used to displace. Plug was bumped and floats held. 22 bbls cement returned to surface. A float shoe and float collar 441') were set along with 7 centralizers.
No oil, gas, or water has been noticed so far. Containment appeared to be in good condition and chemicals/fuel were contained. |
2680468 | Primary Facility | 2018-01-10 | Administrative/File Review | No Violations Noted | |
2684440 | Primary Facility | 2018-01-11 | Drilling/Alteration | No Violations Noted | At the time of inspection, C & J was onsite setting up to cement production casing. Safety meeting took place while onsite. Intermediate casing had been cemented using a lead of 160 sxs Class A (36 bbls), 15.2 ppg, 1.26 yield and tail of 503 sxs Class A (109 bbls), 15.6 ppg, 1.22 yield. Displacement was 139 bbls water. Plug landed and floats held. 30 bbls cement were returned to surface. A float shoe and float collar were used along with 23 centralizers. 500 bbls/hr brine water was encountered starting at 1460'.
Production casing was set to 11838' with a float shoe and collar and 232 centralizers. Containment looked good and cementing was going well while onsite. |
2703760 | Primary Facility | 2018-03-12 | Administrative/File Review | No Violations Noted | |
2704937 | Primary Facility | 2018-03-14 | Administrative/File Review | No Violations Noted | |
2720701 | Primary Facility | 2018-04-19 | Routine/Partial Inspection | No Violations Noted | On 4/19/2018, WQS Brian MacQuarrie onsite to conduct inspection. Sign installed at entrance to site. Access road maintained. Profrac onsite conducting well stimulation operations at 5 wells, 3 wells completed. The permit numbers for the wells are: 1H-019-22717, 2H- 019-22698, 3H-019-22718, 4H-019-22695 and the 8H-019-22699. Secondary containment setup onsite. Erosion and Sedimentation best management practices installed and maintained. Site stabilized with seed and mulch. |
2734858 | Primary Facility | 2018-05-29 | Administrative/File Review | No Violations Noted | |
2779550 | Primary Facility | 2018-09-24 | Routine/Partial Inspection | No Violations Noted | On 9/24/2018, WQS Brian MacQuarrie onsite. Five wells in production, 1H(019-22717), 2H(019-22698), 3H(019-22718), 4H(019-22695) and 8H(019-22700). Six 400 bbl tanks in stainless installed within steel containment structure. Erosion and Sedimentation BMPs installed and maintained. Vegetative growth well established. |
2830319 | Primary Facility | 2019-01-17 | Routine/Partial Inspection | No Violations Noted | On 1/17/2019, WQSS Scott Lux and WQS Brian MacQuarrie onsite. Snow covered ground during inspection. Site consists of five wells in production; 1H-019-22717, 2H-019-22698, 3H-019-22718, 4H-019-22695 and 8H-019-22699. Tank battery consists of six 400 bbl tanks installed within stainless steel containment structure. On 9/7/2018, operator submitted well site restoration extension request through e-submission. The most recent well drilled was the 3H. Drilling on this well was completed on 3/2/2018. On 9/24/2018, WQS Brian MacQuarrie conducted inspection and observed that site was stabilized and erosion and sedimentation best management practices were installed and maintained. Therefore, the well site restoration request is approved until 9/6/2020. |
For data sources see[8]