X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

37-019-22718

Well Details

Well ID: 37-019-22718
Loading map...
Country: United States
State: Pennsylvania
County: Butler
Municipality: Penn Township
Operator Name: PENNENERGY RESOURCES LLC
Well Pad ID: 154783
Farm/Lease Name: HOFER UNIT 3H
License Status:
Spud Date:
Permit Date: 2017-12-13
Well Type: GAS
Unconventional Well: Y
Configuration: Horizontal Well
Conservation: No
Latitude: 40.747586
Longitude: -79.905142

For data sources see[1][2][3]

Well History

Date Event
Deviated
2017-12-13 New Permit Application
2017-12-15 Performed Spud Operation

For data sources see[4]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2018-04-18 2018-05-11 6,144 13,158,100 0

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Water Rex Energy Carrier/Base Water 7732-18-5 100 85.937 109,804,000.0
ProHib 100 ProFrac Acid Inhibitor Water 7732-18-5 85 0.00966322 12347
2-Polyn-1-ol compound w/ methyloxirane 38172-91-7 15 0.00170537 2179
ProFE 105 ProFrac Iron Control Water 7732-18-5 70 0.00281749 3600
Citric Acid 77-92-9 40 0.00163728 2092
Sulphamic Acid 5329-14-6 5 0.000204268 261
Other Chemical(s) Listed Above See Trade Name(s) List Ethoxylated alcohols 68439-50-9 5 0.000123657 158
Ammonium Chloride 12125-02-9 1 0.00022853 292
Alcohols C10-16 68002-97-1 3.6 0.000231661 296
Sulphamic Acid 5329-14-6 5 0.000204268 261
Ethanol 64-17-5 2 0.000565064 722
Quarternary Ammonium Compound 68424-85-1 1.8 0.000508714 650
Hydrochloric Acid (Hydrogen Chloride) 7647-01-0 28 0.22919 292843
Water 7732-18-5 40 0.000992384 1268
Alcohols C12-14 ethoxylated 68439-50-9 3.6 0.000231661 296
Alcohols C12-16 ethoxylated 68551-12-2 3.6 0.000231661 296
Ethoxylated alcohols 68002-97-1 5 0.000123657 158
Ammonium acetate 631-61-8 10 0.000248096 317
Ethoxylated alcohols 68551-12-2 5 0.000123657 158
Glutaraldehyde 111-30-8 12.5 0.00353204 4513
Organophosphonate 129828-36-0 15 0.00342795 4380
Citric Acid 77-92-9 40 0.00163728 2092
Water 7732-18-5 75 0.017139 21899
Ammonium acetate 631-61-8 10 0.000643328 822
Alkyl Quaternary Compound 7173-51-5 1.2 0.000338882 433
Water 7732-18-5 85 0.00966322 12347
Butylated hydroxytoluene 128-37-0 0.9 0.00002270 29
Sand ProFrac Proppant Silica Substrate 14808-60-7 100 12.7785 16,327,500.0
StimLube W FloTek Friction Reducer Ethoxylated alcohols 68002-97-1 5 0.000123657 158
Butylated hydroxytoluene 128-37-0 0.9 0.00002270 29
Hydrotreated light distillate 64742-47-8 30 0.000744288 951
Ethoxylated alcohols 68439-50-9 5 0.000123657 158
Water 7732-18-5 40 0.000992384 1268
Ammonium acetate 631-61-8 10 0.000248096 317
Ethoxylated alcohols 68551-12-2 5 0.000123657 158
Alpha 123 Baker Hughes Biocide Alkyl Quaternary Compound 7173-51-5 1.2 0.000338882 433
Glutaraldehyde 111-30-8 12.5 0.00353204 4513
Ethanol 64-17-5 2 0.000565064 722
Water 7732-18-5 82.5 0.0233093 29783
Quarternary Ammonium Compound 68424-85-1 1.8 0.000508714 650
FR 9400 StimStream Friction Reducer Alcohols C12-14 ethoxylated 68439-50-9 3.6 0.000231661 296
Distillates (petroleum), hydrotreated light 64742-47-8 25 0.0016091 2056
Alcohols C10-16 68002-97-1 3.6 0.000231661 296
Ammonium acetate 631-61-8 10 0.000643328 822
Alcohols C12-16 ethoxylated 68551-12-2 3.6 0.000231661 296
Hydrochloric Acid (7.5%) Cooper Natural Acidizing Hydrochloric Acid (Hydrogen Chloride) 7647-01-0 28 0.22919 292843
Water 7732-18-5 72 0.818536 1,045,870.0
Scaletrol 767W Baker Hughes Biocide Ammonium Chloride 12125-02-9 1 0.00022853 292
Organophosphonate 129828-36-0 15 0.00342795 4380
Water 7732-18-5 75 0.017139 21899
Methanol 67-56-1 30 0.0068559 8760

For data sources see[5]

Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2017 RE GAS DEV LLC 0.00 0 0.00 0 0.00 0
2018 PENNENERGY RESOURCES LLC 1,330,218.28 207 0.00 0 0.00 0
2019 PENNENERGY RESOURCES LLC 1,518,032.00 294 0.00 0 0.00 0

For data sources see[6]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2017 RE GAS DEV LLC Drilling Fluid Waste 50.00 Bbl REUSE (AT WELL PAD)
2018 RE GAS DEV LLC Produced Fluid 850.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC010
2018 RE GAS DEV LLC Produced Fluid 15.65 Tons LANDFILL 06-08438
2018 RE GAS DEV LLC Drilling Fluid Waste 3,235.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW009
2018 RE GAS DEV LLC Produced Fluid 1,020.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0254185
2018 RE GAS DEV LLC Produced Fluid 7,609.00 Bbl REUSE (AT WELL PAD)
2018 RE GAS DEV LLC Drilling Fluid Waste 9.16 Tons CENT WASTE TRT FAC NPDES DISCHARGE EPA ID: 748-163
2018 PENNENERGY RESOURCES LLC Produced Fluid 1,016.30 Bbl INJECTION DISPOSAL WELL 34-155-23223
2018 RE GAS DEV LLC Produced Fluid 213.27 Bbl CENT WASTE TRT FAC NPDES EPA ID: 748-163
2018 RE GAS DEV LLC Produced Fluid 11,314.00 Bbl INJECTION DISPOSAL WELL 34-099-23158
2018 PENNENERGY RESOURCES LLC Produced Fluid 737.30 Bbl INJECTION DISPOSAL WELL 34-155-23196
2018 RE GAS DEV LLC Drilling Fluid Waste 9.16 Tons CENT WASTE TRT FAC NPDES EPA ID: 748-163
2018 RE GAS DEV LLC Produced Fluid 1,850.00 Bbl INJECTION DISPOSAL WELL 34-155-24079
2018 RE GAS DEV LLC Drilling Fluid Waste 986.87 Tons LANDFILL 100585
2018 RE GAS DEV LLC Produced Fluid 213.27 Bbl CENT WASTE TRT FAC NPDES DISCHARGE EPA ID: 748-163
2018 RE GAS DEV LLC Produced Fluid 80.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW009
2019 PENNENERGY RESOURCES LLC Produced Fluid 386.56 Bbl INJECTION DISPOSAL WELL 34-099-23158
2019 PENNENERGY RESOURCES LLC Produced Fluid 273.00 Bbl INJECTION DISPOSAL WELL 34-155-23223
2019 PENNENERGY RESOURCES LLC Produced Fluid 1,220.04 Bbl REUSE (AT WELL PAD)
2019 PENNENERGY RESOURCES LLC Waste Water Treatment Sludge 0.24 Tons RESIDUAL WASTE PROCESSING FACILITY 2014-541
2019 PENNENERGY RESOURCES LLC Produced Fluid 286.00 Bbl INJECTION DISPOSAL WELL 34-155-23196

For data sources see[7]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
2675164 Primary Facility 2017-12-19 Drilling/Alteration No Violations Noted At the time of inspection, HAD Drilling Contractors was onsite using a DR-24 rotary rig rotating 24" conductor into the well. Plan is to set conductor to a depth of 80'. Cellars have not been set. Cuttings were being sent to an open top tank. Pad is still being worked on. There were several piles of gravel onsite to be spread out on the location. Some matting boards were sitting on the pad as well. There were 32' sound walls surrounding the entire pad. The permit signs and Emergency Response sign were posted at the entrance to the access road.
2695524 Primary Facility 2018-02-20 Administrative/File Review No Violations Noted
2695535 Primary Facility 2018-02-20 Administrative/File Review No Violations Noted
2698929 Primary Facility 2018-02-27 Administrative/File Review No Violations Noted
2700295 Primary Facility 2018-02-22 Drilling/Alteration No Violations Noted At the time of inspection, Sidewinder 62 was drilling 8 3/4" tangent. Surface casing has been cemented using 490 sxs Class A (107 bbls), 15.6 ppg, 1.23 yield. This was displaced with 69 bbls water. Landed plug and floats held. 25 bbls were returned to surface.

Intermediate casing was cemented using a lead of 135 sxs Class A (30 bbls), 15.2 ppg, 1.26 yield and tail of 500 sxs Class A (109 bbls), 15.6 ppg, 1.22 yield. This was displaced with 140 bbls freshwater. Landed plug and floats held. 30 bbls were returned to surface.

2704930 Primary Facility 2018-03-14 Administrative/File Review No Violations Noted
2715804 Primary Facility 2018-04-09 Administrative/File Review No Violations Noted
2720709 Primary Facility 2018-04-19 Routine/Partial Inspection No Violations Noted On 4/19/2018, WQS Brian MacQuarrie onsite to conduct inspection. Sign installed at entrance to site. Access road maintained. Profrac onsite conducting well stimulation operations at 5 wells, 3 wells completed. The permit numbers for the wells are: 1H-019-22717, 2H- 019-22698, 3H-019-22718, 4H-019-22695 and the 8H-019-22699. Secondary containment setup onsite. Erosion and Sedimentation best management practices installed and maintained. Site stabilized with seed and mulch.
2734910 Primary Facility 2018-05-29 Administrative/File Review No Violations Noted
2779563 Primary Facility 2018-09-24 Routine/Partial Inspection No Violations Noted On 9/24/2018, WQS Brian MacQuarrie onsite. Five wells in production, 1H(019-22717), 2H(019-22698), 3H(019-22718), 4H(019-22695) and 8H(019-22700). Six 400 bbl tanks in stainless installed within steel containment structure. Erosion and Sedimentation BMPs installed and maintained. Vegetative growth well established.
2830308 Primary Facility 2019-01-17 Routine/Partial Inspection No Violations Noted On 1/17/2019, WQSS Scott Lux and WQS Brian MacQuarrie onsite. Snow covered ground during inspection. Site consists of five wells in production; 1H-019-22717, 2H-019-22698, 3H-019-22718, 4H-019-22695 and 8H-019-22699. Tank battery consists of six 400 bbl tanks installed within stainless steel containment structure. On 9/7/2018, operator submitted well site restoration extension request through e-submission. The most recent well drilled was the 3H. Drilling on this well was completed on 3/2/2018. On 9/24/2018, WQS Brian MacQuarrie conducted inspection and observed that site was stabilized and erosion and sedimentation best management practices were installed and maintained. Therefore, the well site restoration request is approved until 9/6/2020.

For data sources see[8]

References