If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 37-019-22811 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.758455,"lon":-79.704018,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Butler | |
Municipality: Winfield Township | |
Operator Name: PENNENERGY RESOURCES LLC | |
Well Pad ID: 155167 | |
Farm/Lease Name: PER W60 5H | |
License Status: | |
Spud Date: 2017-10-12 | |
Permit Date: 2019-04-26 | |
Well Type: GAS | |
Unconventional Well: Y | |
Configuration: Horizontal Well | |
Conservation: No | |
Latitude: 40.758455 | |
Longitude: -79.704018 |
Date | Event |
---|---|
2018-01-15 | Drilling Completion |
2018-05-14 | Performed Stage 1 of Stimulation |
2018-05-14 | Performed Stage 2 of Stimulation |
2018-05-15 | Performed Stage 3 of Stimulation |
2018-05-15 | Performed Stage 4 of Stimulation |
2018-05-15 | Performed Stage 5 of Stimulation |
2018-05-15 | Performed Stage 6 of Stimulation |
2018-05-15 | Performed Stage 7 of Stimulation |
2018-05-16 | Performed Stage 8 of Stimulation |
2018-05-17 | Perforation |
2018-05-17 | Performed Stage 10 of Stimulation |
2018-05-17 | Performed Stage 11 of Stimulation |
2018-05-17 | Performed Stage 12 of Stimulation |
2018-05-17 | Performed Stage 9 of Stimulation |
2018-05-18 | Performed Stage 13 of Stimulation |
2018-05-18 | Performed Stage 14 of Stimulation |
2018-05-18 | Performed Stage 15 of Stimulation |
2018-05-18 | Performed Stage 16 of Stimulation |
2018-05-19 | Performed Stage 17 of Stimulation |
2018-05-21 | Perforation |
2018-05-21 | Performed Stage 18 of Stimulation |
2018-05-21 | Performed Stage 19 of Stimulation |
2018-05-21 | Performed Stage 20 of Stimulation |
2018-05-22 | Performed Stage 21 of Stimulation |
2018-05-22 | Performed Stage 22 of Stimulation |
2018-05-22 | Performed Stage 23 of Stimulation |
2018-05-23 | Performed Stage 24 of Stimulation |
2018-05-23 | Performed Stage 25 of Stimulation |
2018-05-23 | Performed Stage 26 of Stimulation |
2018-05-23 | Performed Stage 27 of Stimulation |
2018-05-23 | Performed Stage 28 of Stimulation |
2018-05-24 | Perforation |
2018-05-24 | Performed Stage 29 of Stimulation |
2018-05-24 | Performed Stage 30 of Stimulation |
2018-05-24 | Performed Stage 31 of Stimulation |
2018-05-24 | Performed Stage 32 of Stimulation |
2018-05-24 | Performed Stage 33 of Stimulation |
2018-05-24 | Performed Stage 34 of Stimulation |
2018-05-25 | Perforation |
2018-05-25 | Performed Stage 35 of Stimulation |
2018-05-25 | Performed Stage 36 of Stimulation |
2018-05-25 | Performed Stage 37 of Stimulation |
2018-05-25 | Performed Stage 38 of Stimulation |
2018-05-25 | Performed Stage 39 of Stimulation |
2018-05-25 | Performed Stage 40 of Stimulation |
2018-05-29 | Performed Stage 41 of Stimulation |
2018-05-29 | Performed Stage 42 of Stimulation |
2018-05-29 | Performed Stage 43 of Stimulation |
2018-05-29 | Performed Stage 44 of Stimulation |
2018-05-30 | Perforation |
2018-05-30 | Performed Stage 45 of Stimulation |
2018-05-30 | Performed Stage 46 of Stimulation |
2018-05-30 | Performed Stage 47 of Stimulation |
2018-05-30 | Performed Stage 48 of Stimulation |
2019-04-26 | New Permit Application |
2019-05-03 | Newly Drilled |
2019-06-12 | Performed Spud Operation |
2019-07-08 | MOD |
For data sources see[4]
Stimulation Date | Phase Number | Chemical Agent | Volume (gal) | Treating Pressure (psi) | Breakdown Pressure (psi) |
---|---|---|---|---|---|
2018-05-14 | 1 | Sand | 18,668,790 | 8,118 | 5,845 |
2018-05-14 | 2 | Sand | 18,668,790 | 7,664 | 5,578 |
2018-05-15 | 3 | Sand | 18,668,790 | 8,371 | 6,125 |
2018-05-15 | 4 | Sand | 18,668,790 | 8,530 | 6,507 |
2018-05-15 | 5 | Sand | 18,668,790 | 7,831 | 5,458 |
2018-05-15 | 6 | Sand | 18,668,790 | 7,563 | 5,090 |
2018-05-15 | 7 | Sand | 18,668,790 | 7,522 | 5,255 |
2018-05-16 | 8 | Sand | 18,668,790 | 7,609 | 5,084 |
2018-05-17 | 9 | Sand | 18,668,790 | 7,473 | 5,382 |
2018-05-17 | 10 | Sand | 18,668,790 | 7,519 | 5,476 |
2018-05-17 | 11 | Sand | 18,668,790 | 7,538 | 5,635 |
2018-05-17 | 12 | Sand | 18,668,790 | 7,309 | 5,154 |
2018-05-18 | 13 | Sand | 18,668,790 | 7,117 | 6,445 |
2018-05-18 | 14 | Sand | 18,668,790 | 7,943 | 6,626 |
2018-05-18 | 15 | Sand | 18,668,790 | 7,854 | 6,617 |
2018-05-18 | 16 | Sand | 18,668,790 | 7,644 | 5,206 |
2018-05-19 | 17 | Sand | 18,668,790 | 7,187 | 5,801 |
2018-05-21 | 18 | Sand | 18,668,790 | 7,691 | 5,788 |
2018-05-21 | 19 | Sand | 18,668,790 | 7,140 | 5,160 |
2018-05-21 | 20 | Sand | 18,668,790 | 7,046 | 5,366 |
2018-05-22 | 21 | Sand | 18,668,790 | 7,304 | 5,222 |
2018-05-22 | 22 | Sand | 18,668,790 | 7,016 | 5,161 |
2018-05-22 | 23 | Sand | 18,668,790 | 7,124 | 5,107 |
2018-05-23 | 24 | Sand | 18,668,790 | 6,826 | 5,118 |
2018-05-23 | 25 | Sand | 18,668,790 | 6,480 | 5,360 |
2018-05-23 | 26 | Sand | 18,668,790 | 6,537 | 5,661 |
2018-05-23 | 27 | Sand | 18,668,790 | 6,752 | 5,367 |
2018-05-23 | 28 | Sand | 18,668,790 | 6,708 | 5,070 |
2018-05-24 | 29 | Sand | 18,668,790 | 6,824 | 5,705 |
2018-05-24 | 30 | Sand | 18,668,790 | 6,008 | 5,540 |
2018-05-24 | 31 | Sand | 18,668,790 | 6,295 | 5,914 |
2018-05-24 | 32 | Sand | 18,668,790 | 5,887 | 5,505 |
2018-05-24 | 33 | Sand | 18,668,790 | 6,286 | 6,253 |
2018-05-24 | 34 | Sand | 18,668,790 | 6,392 | 5,586 |
2018-05-25 | 35 | Sand | 18,668,790 | 6,594 | 5,369 |
2018-05-25 | 36 | Sand | 18,668,790 | 6,452 | 5,776 |
2018-05-25 | 37 | Sand | 18,668,790 | 6,488 | 5,495 |
2018-05-25 | 38 | Sand | 18,668,790 | 6,387 | 5,091 |
2018-05-25 | 39 | Sand | 18,668,790 | 6,409 | 5,295 |
2018-05-25 | 40 | Sand | 18,668,790 | 6,263 | 4,646 |
2018-05-29 | 41 | Sand | 18,668,790 | 6,391 | 5,890 |
2018-05-29 | 42 | Sand | 18,668,790 | 6,363 | 5,706 |
2018-05-29 | 43 | Sand | 18,668,790 | 6,333 | 5,314 |
2018-05-29 | 44 | Sand | 18,668,790 | 6,192 | 5,400 |
2018-05-30 | 45 | Sand | 18,668,790 | 6,128 | 5,595 |
2018-05-30 | 46 | Sand | 18,668,790 | 6,435 | 5,834 |
2018-05-30 | 47 | Sand | 18,668,790 | 6,356 | 6,349 |
2018-05-30 | 48 | Sand | 18,668,790 | 6,245 | 5,082 |
For data sources see[5]
Period | Operator | Waste Type | Quantity | Disposal Method | Waste Facility ID |
---|---|---|---|---|---|
2019 | PENNENERGY RESOURCES LLC | Produced Fluid | 284.46 Bbl | INJECTION DISPOSAL WELL | 34-155-23196 |
2019 | PENNENERGY RESOURCES LLC | Drill Cuttings | 861.56 Tons | RESIDUAL WASTE PROCESSING FACILITY | PAD085690592 |
2019 | PENNENERGY RESOURCES LLC | Produced Fluid | 327.15 Bbl | INJECTION DISPOSAL WELL | 34-155-23223 |
2019 | PENNENERGY RESOURCES LLC | Produced Fluid | 933.71 Bbl | REUSE (AT WELL PAD) |
For data sources see[6]