If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 37-027-21311 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.076473,"lon":-78.018923,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Centre | |
Municipality: Burnside Township | |
Operator Name: ALLIANCE PETRO CO LLC | |
Well Pad ID: | |
Farm/Lease Name: CONFER W 29 | |
License Status: ACTIVE | |
Spud Date: | |
Permit Date: 2005-02-18 | |
Well Type: GAS | |
Unconventional Well: N | |
Configuration: Vertical Well | |
Conservation: No | |
Latitude: 41.076473 | |
Longitude: -78.018923 |
Date | Event |
---|---|
2005-02-18 | New Permit Application |
2005-04-11 | Performed Spud Operation |
2005-04-13 | Drilling Completion |
2005-04-21 | Perforation |
2006-06-08 | NEWLY DRILLED |
For data sources see[4]
Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
---|---|---|---|---|---|---|---|
2005 | EXCO RESOURCES PA INC | 1,492.00 | 0.00 | 0 | 0.00 | 0 | |
2006 | EXCO RESOURCES PA INC | 1,778.00 | 365 | 0.00 | 0 | 0.00 | 0 |
2007 | EXCO RESOURCES PA INC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2008 | EXCO RESOURCES PA INC | 499.00 | 366 | 0.00 | 0 | 0.00 | 0 |
2009 | EXCO RESOURCES PA INC | 380.00 | 365 | 0.00 | 0 | 0.00 | 0 |
2010 | EXCO RESOURCES PA INC | 482.00 | 365 | 0.00 | 0 | 0.00 | 0 |
2011 | EXCO RESOURCES PA INC | 508.00 | 365 | 0.00 | 0 | 0.00 | 0 |
2012 | EXCO RESOURCES PA LLC | 679.00 | 366 | 0.00 | 0 | 0.00 | 0 |
2013 | EXCO RESOURCES PA LLC | 362.00 | 275 | 0.00 | 0 | 0.00 | 0 |
2014 | EXCO RESOURCES PA LLC | 142.00 | 304 | 0.00 | 0 | 0.00 | 0 |
2015 | EXCO RESOURCES PA LLC | 110.00 | 275 | 0.00 | 0 | 0.00 | 0 |
2016 | ALLIANCE PETRO CO LLC | 51.00 | 183 | 0.00 | 0 | 0.00 | 0 |
2017 | ALLIANCE PETRO CO LLC | 92.00 | 365 | 0.00 | 0 | 0.00 | 0 |
2018 | ALLIANCE PETRO CO LLC | 73.00 | 365 | 0.00 | 0 | 0.00 | 0 |
For data sources see[5]
Period | Operator | Waste Type | Quantity | Disposal Method | Waste Facility ID |
---|---|---|---|---|---|
2010 | EXCO RESOURCES PA INC | Produced Fluid | 20.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PAS2D205BCLE |
For data sources see[6]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
1443670 | Primary Facility | 2005-04-26 | Drilling/Alteration | No Violations Noted | |
1451966 | Primary Facility | 2005-05-25 | Drilling/Alteration | No Violations Noted | |
2536919 | Primary Facility | 2016-11-07 | Routine/Complete Inspection | No Violations Noted | Routine inspection of conventional well in production. No violations noted at time of inspection. |
For data sources see[7]