If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 37-027-21660 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.020464,"lon":-78.056647,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Centre | |
Municipality: Snow Shoe Township | |
Operator Name: XPR RESOURCES LLC | |
Well Pad ID: 149180 | |
Farm/Lease Name: RESOURCE RECOVERY 3 1H | |
License Status: | |
Spud Date: | |
Permit Date: 2010-12-14 | |
Well Type: GAS | |
Unconventional Well: Y | |
Configuration: Horizontal Well | |
Conservation: Yes | |
Latitude: 41.020464 | |
Longitude: -78.056647 |
Date | Event |
---|---|
2010-12-14 | New Permit Application |
2011-02-14 | Performed Spud Operation |
2011-05-19 | Drilling Completion |
2011-08-22 | Perforation |
2012-07-23 | DEVIATED |
For data sources see[4]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 2011-08-27 | 2011-08-27 | 8,530 | 3,899,773 |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | BE-9M | Halliburton Energy Services | Biocide | Methanol | 67-56-1 | 30.00 | 0.00700000 | |
Tri-n-butyl tetradecyl phosphonium chloride | 81741-28-8 | 10.00 | 0.00230000 | |||||
WG-36 Gelling Agent | Halliburton Energy Services | Gel | ||||||
Guar gum | 9000-30-0 | 100.00 | 0.00180000 | |||||
FR-66 Friction Reducer | Halliburton Energy Services | Friction Reducer | Distillates, petroleum, hydrotreated light | 64742-47-8 | 30.00 | 0.01 | ||
SP Breaker | Halliburton Energy Services | Breaker | Sodium persulfate | 7775-27-1 | 100.00 | 0.00090000 | ||
Water | ARM Group | Carrier/Base Fluid | Water | 100.00 | 86.20 | |||
Hydrochloric Acid | Halliburton Energy Services | Acid | Hydrochloric acid | 7647-01-0 | 30.00 | 0.09 | ||
LP-65 | Halliburton Energy Services | Scale Inhibitor | Ammonium chloride | 12125-02-9 | 10.00 | 0.00330000 | ||
GBW-30 Breaker | Halliburton Energy Services | Breaker | Hemicellulase enzyme | 9012-54-8 | 15.00 | 0.00010000 | ||
Carbohydrates | 95.00 | 0.00080000 | ||||||
BA-40L | Halliburton Energy Services | Buffer | Carbonic acid, dipotassium salt | 584-08-7 | 60.00 | 0.01 | ||
Sand- Silica Sand | Halliburton Energy Services | Proppant | Quartz | 14808-60-7 | 100.00 | 13.64 |
For data sources see[5]
Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
---|---|---|---|---|---|---|---|
2010 | XPR RESOURCES LLC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2011 | XPR RESOURCES LLC | 309,127.00 | 102 | 0.00 | 0 | 0.00 | 0 |
2012 | XPR RESOURCES LLC | 488,412.61 | 364 | 0.00 | 0 | 0.00 | 0 |
2013 | XPR RESOURCES LLC | 290,932.00 | 365 | 0.00 | 0 | 0.00 | 0 |
2014 | XPR RESOURCES LLC | 219,463.93 | 365 | 0.00 | 0 | 0.00 | 0 |
2015 | XPR RESOURCES LLC | 194,631.27 | 365 | 0.00 | 0 | 0.00 | 0 |
2016 | XPR RESOURCES LLC | 164,597.00 | 366 | 0.00 | 0 | 0.00 | 0 |
2017 | XPR RESOURCES LLC | 138,002.16 | 364 | 0.00 | 0 | 0.00 | 0 |
2018 | XPR RESOURCES LLC | 136,092.00 | 365 | 0.00 | 0 | 0.00 | 0 |
2019 | XPR RESOURCES LLC | 81,430.00 | 284 | 0.00 | 0 | 0.00 | 0 |
For data sources see[6]
Period | Operator | Waste Type | Quantity | Disposal Method | Waste Facility ID |
---|---|---|---|---|---|
2011 | XPR RESOURCES LLC | Drilling Fluid Waste | 1,155.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0101508 |
2011 | XPR RESOURCES LLC | Drill Cuttings | 605.00 Tons | LANDFILL | 100419 |
2011 | XPR RESOURCES LLC | Drilling Fluid Waste | 780.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0095443 |
2011 | XPR RESOURCES LLC | Drilling Fluid Waste | 2,140.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0095273 |
2011 | XPR RESOURCES LLC | Fracing Fluid Waste | 238.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0101508 |
2011 | XPR RESOURCES LLC | Fracing Fluid Waste | 716.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0254185 |
2011 | XPR RESOURCES LLC | Produced Fluid | 190.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0095273 |
2012 | XPR RESOURCES LLC | Produced Fluid | 432.70 Bbl | INJECTION DISPOSAL WELL | 34-155-23795 |
2012 | XPR RESOURCES LLC | Produced Fluid | 10,633.71 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0254185 |
2013 | XPR RESOURCES LLC | Produced Fluid | 3,717.00 Bbl | INJECTION DISPOSAL WELL | 34-151-23420 |
2014 | XPR RESOURCES LLC | Fracing Fluid Waste | 3,300.00 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123SW005 |
2014 | XPR RESOURCES LLC | Produced Fluid | 110.00 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR119 |
2014 | XPR RESOURCES LLC | Produced Fluid | 1,320.00 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123SW005 |
2014 | XPR RESOURCES LLC | Produced Fluid | 210.00 Bbl | INJECTION DISPOSAL WELL | 34-155-23795 |
2015 | XPR RESOURCES LLC | Produced Fluid | 302.00 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123SW005 |
2016 | XPR RESOURCES LLC | Produced Fluid | 275.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW005 |
2016 | XPR RESOURCES LLC | Produced Fluid | 220.00 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123SW005 |
2017 | XPR RESOURCES LLC | Produced Fluid | 234.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW005 |
2017 | XPR RESOURCES LLC | Waste comment only | 0.00 | ||
2017 | XPR RESOURCES LLC | Produced Fluid | 220.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0254185 |
2018 | XPR RESOURCES LLC | Produced Fluid | 75.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NW011 |
2018 | XPR RESOURCES LLC | Produced Fluid | 148.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW005 |
2019 | XPR RESOURCES LLC | Produced Fluid | 42.50 Bbl | INJECTION DISPOSAL WELL | 34-155-24079 |
For data sources see[7]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
1952536 | Primary Facility | 2011-02-25 | Compliance Evaluation | Violation(s) Noted | |
1956546 | Primary Facility | 2011-01-31 | Routine/Complete Inspection | No Violations Noted | |
1962206 | Primary Facility | 2011-02-15 | Routine/Complete Inspection | Viol(s) Noted & Immediately Corrected | |
1963712 | Primary Facility | 2011-02-28 | Compliance Evaluation | Outstanding Violations - No Viols Req'd | |
1965713 | Primary Facility | 2011-03-04 | Routine/Complete Inspection | Viol(s) Noted & Immediately Corrected | |
1980488 | Primary Facility | 2011-04-18 | Routine/Complete Inspection | No Violations Noted | |
1980623 | Primary Facility | 2011-04-25 | Routine/Complete Inspection | Viol(s) Noted & Immediately Corrected | |
1981779 | Primary Facility | 2011-05-06 | Routine/Complete Inspection | No Violations Noted | |
1986263 | Primary Facility | 2011-05-12 | Routine/Complete Inspection | No Violations Noted | |
1988805 | Primary Facility | 2011-06-02 | Routine/Complete Inspection | No Violations Noted | |
2003958 | Primary Facility | 2011-07-29 | Routine/Complete Inspection | No Violations Noted | |
2005666 | Primary Facility | 2011-08-10 | Routine/Complete Inspection | No Violations Noted | |
2019243 | Primary Facility | 2011-09-06 | Routine/Complete Inspection | No Violations Noted | |
2021085 | Primary Facility | 2011-09-15 | Routine/Complete Inspection | No Violations Noted | |
2023572 | Primary Facility | 2011-09-27 | Routine/Complete Inspection | Viol(s) Noted & Immediately Corrected | |
2024057 | Primary Facility | 2011-12-05 | Follow-up Inspection | Violation(s) Noted | |
2024084 | Primary Facility | 2011-12-02 | Routine/Complete Inspection | Viol(s) Noted & Immediately Corrected | |
2024156 | Primary Facility | 2011-09-28 | Follow-up Inspection | No Violations Noted | |
2026337 | Primary Facility | 2011-10-25 | Routine/Complete Inspection | No Violations Noted | |
2029562 | Primary Facility | 2011-11-01 | Routine/Complete Inspection | No Violations Noted | |
2035158 | Primary Facility | 2011-12-02 | Routine/Complete Inspection | Viol(s) Noted & Immediately Corrected | |
2080709 | Primary Facility | 2012-05-21 | Routine/Complete Inspection | No Violations Noted | |
2145231 | Primary Facility | 2013-02-19 | Routine/Complete Inspection | No Violations Noted | |
2180649 | Primary Facility | 2013-07-02 | Routine/Complete Inspection | No Violations Noted | |
2182884 | Primary Facility | 2013-07-11 | Routine/Complete Inspection | No Violations Noted | |
2226779 | Primary Facility | 2013-12-03 | Routine/Complete Inspection | No Violations Noted | |
2450446 | Primary Facility | 2016-02-11 | Routine/Complete Inspection | No Violations Noted | |
2647293 | Primary Facility | 2017-10-06 | Routine/Complete Inspection | No Violations Noted | Routine inspection of XPR Resources LLC, Recovery Recovery Well Pad 3 on October 10, 2017. No one was onsite during my inspection. PCSM installation has been completed. The contractor regraded the pad allowing water to flow towards the recently installed channel along the S and W border of the pad. This developed channel leads to an existing pond. The contractor applied E&S blanket along the developed channel and seed has been applied. The ditch along the access road leading to the well pad has been cleaned out. All BMPs remain in place. The pad remains at full build-out size (350'x550').
There are 4 producing wells on this pad: (027-21660, 027-21661, 027-21662, 027-21663). There are 2 production units onsite and (4) 400 BBL produced fluids tanks located in secondary containment. A trace of water was present within the produced fluids containment with a conductivity of 300 uS/cm. No violations noted. |
2670061 | Primary Facility | 2017-12-12 | Routine/Complete Inspection | No Violations Noted | The weather is 26 Deg. F and cloudy, windy at time of inspection.
Routine inspection of XPR Resources LLC, Resource Recovery 3 Pad, Well # 1H on December 12, 2017. There are 4 producing wells on this pad: (Permits: 027-21660; 027-21661; 027-21662; 027-21663). Both annulus lines are open and plumbed to GPU at time of inspection. 0% combustible gas was detected at the annulus vent or in the area immediately surrounding the well. Digital gauge for the production tubing reads 145 PSI and located at Gas Processing Unit. No violations noted. XPR Resources LLC Representatives - Kevin Brady, Hydrologist, Environmental Scientist, Wetland Delineator and Heather Empfield, Permitting & Geologist ¿ XPR Resources. DEP Representative ¿ Ulyana Trynovich, Oil and Gas Inspector. |
2795359 | Primary Facility | 2018-10-17 | Routine/Complete Inspection | No Violations Noted | Routine site inspection with Heather Empfield of XPR Resources LLC at Recovery Recovery Well Pad 3 on October 17, 2018. PCSM installation has been completed. The contractor regraded the pad allowing water to flow towards the recently installed channel along the S and W border of the pad. This developed channel is fully vegetated and leads to an existing wet pond. The ditch along the access road leading to the well pad has been cleaned out. The pad remains at full build-out size (350'x550').
There are 4 producing wells on this pad: (027-21660, 027-21661, 027-21662, 027-21663). Each well head is properly tagged. There are 2 production units onsite and (4) 400 BBL produced fluids tanks located in secondary containment. As discussed during the site inspection with Ms. Empfield, the Department recommends submitting well site restoration reports for the 4 active wells onsite via Greenport. No violations noted. |
Inspection ID | Violation ID | Violation Date | Date Resolved | Violation Code | Violation Type | Violation Comments |
---|---|---|---|---|---|---|
1952536 | 605447 | 02/25/2011 | 2011-02-25 | 307CSL - Discharge of industrial waste to waters of Commonwealth without a permit. | Environmental Health & Safety | Violation noted by John Sengle on 2/25/2011documented as corrected by Sam Jones inspection of 3/4/2011. |
1962206 | 607894 | 02/15/2011 | 2011-02-15 | 102.11 - Failure to design, implement or maintain BMPs to minimize the potential for accelerated erosion and sedimentation. | Administrative | E&S mat is coming off ast various locations, HRI immediately repaired the E&S issues |
1965713 | 608892 | 03/04/2011 | 2011-03-04 | 78.56(2) - Failure to maintain 2 ' of freeboard in an impoundment. | Administrative | fluid level in pit exceeding 2' freeboard from excessive rain, pumper trucks on site removing fluids from the pit |
1980623 | 613529 | 04/25/2011 | 2011-04-25 | 78.56FRBRD - Failure to maintain 2' freeboard in an impoundment | Administrative | Had pummper trucks on site and pumping fluid out |
2023572 | 625965 | 09/27/2011 | 2011-09-27 | 78.56(3) - Impoundment not structurally sound, impermeable, 3rd party protected. | Administrative | Failure to keep flow back and residue splash within the confines of the pit, need to clean up residue |
2024057 | 626131 | 12/05/2011 | 2011-12-05 | 401CSL - Discharge of pollultional material to waters of Commonwealth. | Environmental Health & Safety | |
2024057 | 626132 | 12/05/2011 | 2011-12-05 | 6018.301 - Residual Waste is mismanaged. | Environmental Health & Safety | |
2024057 | 626133 | 12/05/2011 | 2011-12-05 | 78.56(3) - Impoundment not structurally sound, impermeable, 3rd party protected. | Administrative | |
2024084 | 626164 | 12/02/2011 | 2011-12-02 | 78.54* - Failure to properly control or dispose of industrial or residual waste to prevent pollution of the waters of the Commonwealth. | Environmental Health & Safety | Fluids and wastes from the area around the well head and cellar were allowed to make it to teh ground an dinto water in a pipeline trench |
2035158 | 629644 | 12/02/2011 | 2011-12-02 | 78.56(1) - Pit and tanks not constructed with sufficient capacity to contain pollutional substances. | Administrative | Pit had insufficient capacity to keep all fluids and materials from teh flowing back of well into teh pit prior to removal to tanks or a centralized impoundment |
Violation ID | Penalty ID | Penalty Code | Penalty Status | Penalty Date | Enforcement Date | Penalty Amount | Amount Collected |
---|---|---|---|---|---|---|---|
605447 | 268375 | NOV - Notice of Violation | Comply/Closed | 2011-03-04 | |||
626131 | 277897 | NOV - Notice of Violation | Comply/Closed | 2014-11-12 | |||
626132 | 277897 | NOV - Notice of Violation | Comply/Closed | 2014-11-12 | |||
626133 | 277897 | NOV - Notice of Violation | Comply/Closed | 2014-11-12 |
For data sources see[8]