If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 37-031-23632 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.13511,"lon":-79.510827,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Clarion | |
Municipality: Licking Township | |
Operator Name: WINFALL ENERGY INC N V | |
Well Pad ID: | |
Farm/Lease Name: WILLIS ELLIOTT 8 | |
License Status: ACTIVE | |
Spud Date: | |
Permit Date: 2002-09-19 | |
Well Type: GAS | |
Unconventional Well: N | |
Configuration: Vertical Well | |
Conservation: No | |
Latitude: 41.135110 | |
Longitude: -79.510827 |
Date | Event |
---|---|
2002-09-19 | New Permit Application |
2003-06-04 | Performed Spud Operation |
2003-06-06 | Drilling Completion |
2003-10-17 | NEWLY DRILLED |
2004-01-27 | Perforation |
For data sources see[4]
Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
---|---|---|---|---|---|---|---|
2002 | WINFALL ENERGY INC N V | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2003 | WINFALL ENERGY INC N V | 1142 | 160 | 0.00 | 0 | 0.00 | 0 |
2004 | WINFALL ENERGY INC N V | 1115 | 365 | 0.00 | 0 | 0.00 | 0 |
2005 | WINFALL ENERGY INC N V | 2978.14 | 365 | 22.52 | 365 | 0.00 | 0 |
2006 | WINFALL ENERGY INC N V | 3258.43 | 365 | 11.43 | 365 | 0.00 | 0 |
2007 | WINFALL ENERGY INC N V | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2008 | WINFALL ENERGY INC N V | 2,585.57 | 365 | 9.71 | 365 | 0.00 | 0 |
2009 | WINFALL ENERGY INC N V | 1353.00 | 265 | 0.00 | 0 | 0.00 | 0 |
2010 | WINFALL ENERGY INC N V | 346.71 | 365 | 0.00 | 0 | 0.00 | 0 |
2011 | WINFALL ENERGY INC N V | 546.14 | 365 | 0.00 | 0 | 0.00 | 0 |
2012 | WINFALL ENERGY INC N V | 223.14 | 365 | 0.00 | 0 | 0.00 | 0 |
2013 | WINFALL ENERGY INC N V | 110.71 | 365 | 0.00 | 0 | 0.00 | 0 |
2014 | WINFALL ENERGY INC N V | 62.11 | 365 | 0.00 | 0 | 0.00 | 0 |
2015 | WINFALL ENERGY INC N V | 74.3 | 365 | 0.00 | 0 | 0.00 | 0 |
For data sources see[5]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
1241356 | Primary Facility | 2003-06-06 | Drilling/Alteration | No Violations Noted | |
1256652 | Primary Facility | 2003-07-28 | Drilling/Alteration | Violation(s) Noted | |
1260662 | Primary Facility | 2003-08-12 | Compliance Evaluation | No Violations Noted |
Inspection ID | Violation ID | Violation Date | Date Resolved | Violation Code | Violation Type | Violation Comments |
---|---|---|---|---|---|---|
1256652 | 358934 | 07/28/2003 | 2003-07-28 | 102.4 - Failure to minimize accelerated erosion, implement E&S plan, maintain E&S controls. Failure to stabilize site until total site restoration under OGA Sec 206(c)(d) | Environmental Health & Safety | Accelerated erosion on fill side of well pad. Improperly built road allowed upgrade runoff to drain directly onto pad. Poorly constructed surface water diversion used upgrade of pad and pit. |
1256652 | 358935 | 07/28/2003 | 2003-07-28 | 301CSL - Stream discharge of IW, includes drill cuttings, oil, brine and/or silt | Environmental Health & Safety | Soil from fill side of well pad eroded and breached the piled brush downgradient of well pad. It was transported by heavy rains into drainage ditches created by the former surface mine. Soil and sediment were then discharged to an unnamed tributary of Lic |
Violation ID | Penalty ID | Penalty Code | Penalty Status | Penalty Date | Enforcement Date | Penalty Amount | Amount Collected |
---|---|---|---|---|---|---|---|
358934 | 123322 | NOV - Notice of Violation | Comply/Closed | 2003-10-28 | |||
358934 | 128069 | CACP - Consent Assessment of Civil Penalty | Comply/Closed | 2003-10-28 | 2003-10-28 | $2,425.00 | $2,425.00 |
358935 | 123322 | NOV - Notice of Violation | Comply/Closed | 2003-10-28 | |||
358935 | 128069 | CACP - Consent Assessment of Civil Penalty | Comply/Closed | 2003-10-28 | 2003-10-28 | $2,425.00 | $2,425.00 |
For data sources see[6]