If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 37-033-25967 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.211415,"lon":-78.558221,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Clearfield | |
Municipality: Huston Township | |
Operator Name: DANNIC ENERGY CORP | |
Well Pad ID: | |
Farm/Lease Name: CHAGRIN BEL 66 | |
License Status: ACTIVE | |
Spud Date: | |
Permit Date: 2005-12-30 | |
Well Type: GAS | |
Unconventional Well: N | |
Configuration: Vertical Well | |
Conservation: No | |
Latitude: 41.211415 | |
Longitude: -78.558221 |
Date | Event |
---|---|
2005-12-30 | New Permit Application |
2006-01-27 | Performed Spud Operation |
2006-01-31 | Drilling Completion |
2006-02-21 | Perforation |
2006-09-19 | NEWLY DRILLED |
For data sources see[4]
Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
---|---|---|---|---|---|---|---|
2006 | MID EAST OIL CO | 1231.00 | 206 | 0.00 | 0 | 0.00 | 0 |
2007 | DANNIC ENERGY CORP | 1177.00 | 304 | 0.00 | 0 | 0.00 | 0 |
2008 | DANNIC ENERGY CORP | 795.00 | 335 | 0.00 | 0 | 0.00 | 0 |
2009 | DANNIC ENERGY CORP | 721.00 | 365 | 0.00 | 0 | 0.00 | 0 |
2010 | DANNIC ENERGY CORP | 276.00 | 365 | 0.00 | 0 | 0.00 | 0 |
2011 | DANNIC ENERGY CORP | 255.00 | 334 | 0.00 | 0 | 0.00 | 0 |
2012 | DANNIC ENERGY CORP | 310.00 | 184 | 0.00 | 0 | 0.00 | 0 |
2013 | DANNIC ENERGY CORP | 168.00 | 59 | 0.00 | 0 | 0.00 | 0 |
2014 | DANNIC ENERGY CORP | 172.00 | 214 | 0.00 | 0 | 0.00 | 0 |
2015 | DANNIC ENERGY CORP | 183.71 | 365 | 0.00 | 0 | 0.00 | 0 |
2016 | DANNIC ENERGY CORP | 3,308.00 | 366 | 0.00 | 0 | 0.00 | 0 |
2017 | DANNIC ENERGY CORP | 185.00 | 365 | 0.00 | 0 | 0.00 | 0 |
2018 | DANNIC ENERGY CORP | 148.28 | 365 | 0.00 | 0 | 0.00 | 0 |
2019 | DANNIC ENERGY CORP | 112.98 | 245 | 0.00 | 0 | 0.00 | 0 |
For data sources see[5]
Period | Operator | Waste Type | Quantity | Disposal Method | Waste Facility ID |
---|---|---|---|---|---|
2006 | MID EAST OIL CO | Brine | 80.00 Bbl | Brine or Industrial Waste Treatment Plt | PA0095443 |
2006 | MID EAST OIL CO | Brine | 90.00 Bbl | Brine or Industrial Waste Treatment Plt | PA0101508 |
2012 | DANNIC ENERGY CORP | Produced Fluid | 80.00 Bbl | PUBLIC SEWAGE TREATMENT PLANT | PA0020346 |
2015 | DANNIC ENERGY CORP | Produced Fluid | 3,360.00 Bbl | PUBLIC SEWAGE TREATMENT PLANT | PA0028428 |
2017 | DANNIC ENERGY CORP | Produced Fluid | 80.00 Bbl | PUBLIC SEWAGE TREATMENT PLANT | PA0028428 |
2019 | DANNIC ENERGY CORP | Produced Fluid | 80.00 Bbl | PUBLIC SEWAGE TREATMENT PLANT | PA0028428 |
For data sources see[6]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
1514760 | Primary Facility | 2006-02-08 | Drilling/Alteration | No Violations Noted | |
2826856 | Primary Facility | 2019-01-15 | Routine/Complete Inspection | No Violations Noted | Department representative Sue Herzing conducted a routine site inspection at Dannic Energy Corp conventional well (033-25967) on January 15, 2019. The area surrounding the production equipment has been restored. Restored site appears well vegetated and is partially snow covered. No signs of E&S issues. Poly brine tank stationed onsite. Chart recorder is dated 12/31/18 and the outside of the chart recorder is labeled with the operators contact information and well permit. Flakey paint and corrosion were observed on the well head, separator, and axillary piping. The Department recommends monitoring the production equipment and replacing and/or repainting the equipment if necessary. Department staff used an Altair 5x gas meter during the inspection. No combustible gases or methane were detected.
No violations noted. |
For data sources see[7]