X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

37-033-27057

Well Details

Well ID: 37-033-27057
Loading map...
Country: United States
State: Pennsylvania
County: Clearfield
Municipality: Huston Township
Operator Name: EQT PROD CO
Well Pad ID: 149476
Farm/Lease Name: TURKEY 591244
License Status: Active
Spud Date: 2012-05-30
Permit Date: 2011-07-19
Well Type: GAS
Unconventional Well: Y
Configuration: Horizontal Well
Conservation: Yes
Latitude: 41.173583
Longitude: -78.572478

For data sources see[1][2][3]

Well History

Date Event
2011-07-19 New Permit Application
2012-05-07 Performed Spud Operation
2012-07-05 New Permit Application
2012-09-13 New Permit Application
2012-10-30 Drilling Completion
2014-06-10 Performed Stage 1 of Stimulation
2014-06-11 Perforation
2014-06-11 Performed Stage 1 of Stimulation
2014-06-11 Performed Stage 2 of Stimulation
2014-06-12 Perforation
2014-06-12 Performed Stage 3 of Stimulation
2014-06-13 Perforation
2014-06-14 Perforation
2014-06-14 Performed Stage 4 of Stimulation
2014-06-15 Perforation
2014-06-15 Performed Stage 4 of Stimulation
2014-06-16 Perforation
2014-06-16 Performed Stage 5 of Stimulation
2014-06-16 Performed Stage 6 of Stimulation
2014-06-16 Performed Stage 7 of Stimulation
2014-06-17 Perforation
2014-06-17 Performed Stage 10 of Stimulation
2014-06-17 Performed Stage 8 of Stimulation
2014-06-17 Performed Stage 9 of Stimulation
2014-06-18 Perforation
2014-06-18 Performed Stage 10 of Stimulation
2014-06-18 Performed Stage 11 of Stimulation
2014-06-18 Performed Stage 12 of Stimulation
2014-06-19 Perforation
2014-06-19 Performed Stage 12 of Stimulation
2014-06-19 Performed Stage 13 of Stimulation
2014-06-19 Performed Stage 14 of Stimulation
2014-06-19 Performed Stage 15 of Stimulation
2019-03-19 Deviated

For data sources see[4]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2014-06-10 2014-06-19 7,393 7,189,140 0

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 OB-2 Nabors Gel Breaker Sillica, crystalline quartz 7631-86-9 30 0.00005729 37.71
Ammonium Persulfate 7727-54-0 70 0.000133674 87.99
Hydrochloric Acid (15%) Nabors Acidizing Hydrochloric Acid 7647-01-0 15 0.0239086 15737.6
MC M8-2544 Nabors Live Culture-Nitrate Reducing Bacteria Proprietary non-hazardous Proprietary 60 0.00609883 4014.51
MC MX 5-2402 Nabors Soldium nitrate brine Sodium nitrate 7631-99-4 60 0.0598002 39363
AI-2 Nabors Acid Inhibitor Ethoxylated Nonylphenol 68412-54-4 7 0.00002065 13.59
Benzyl Chloride-Quaternized 72480-70-7 5 0.00001475 9.707
Isopropyl Alcohol 67-63-0 29 0.00008553 56.302
Propargyl Alcohol 107-19-7 30 0.00008848 58.244
Glycol Ethers 111-76-2 29 0.00008553 56.302
LSG-100 Nabors Gelling agent Solvent naphtha 64742-47-8 65 0.0106748 7026.57
Proprietary non-hazardous polymers Proprietary 35 0.00574795 3783.54
Sand (Proppant) Nabors Proppant Silica Substrate 14808-60-7 100 8.45267 5,563,900.0
WFR-3B Nabors Friction reducer Hydrotreated Light Distillate 64742-47-8 50 0.0454093 29890.3
Ethoxylated oleylamine 26635-93-8 5 0.00454093 2989.03
Ethoxylated alcohols 68551-12-2 15 0.0136228 8967.09
Water Nabors Carrier/Base Fluid Water 7732-18-5 100 91.1419 59,993,400.0
Super TSC LT Nabors Scale control Proprietary non-hazardous Proprietary 100 0.0285096 18766.2

For data sources see[5]

Stimulation Data

Stimulation Date Phase Number Chemical Agent Volume (gal) Treating Pressure (psi) Breakdown Pressure (psi)
2014-06-10 1 None 3,745,518 0 0
2014-06-11 2 Sand 3,745,518 8,890 9,279
2014-06-12 3 Sand 3,745,518 8,555 8,888
2014-06-14 4 Sand 3,745,518 9,114 9,710
2014-06-16 5 Sand 3,745,518 8,893 9,363
2014-06-16 6 Sand 3,745,518 8,309 9,232
2014-06-16 7 Sand 3,745,518 8,376 9,039
2014-06-17 8 Sand 3,745,518 8,196 8,823
2014-06-17 9 Sand 3,745,518 8,453 8,754
2014-06-18 10 None 3,745,518 5,736 7,785
2014-06-18 11 Sand 3,745,518 8,628 8,960
2014-06-18 12 Sand 3,745,518 8,748 9,383
2014-06-19 13 Sand 3,745,518 7,912 8,660
2014-06-19 14 Sand 3,745,518 8,273 8,772
2014-06-19 15 Sand 3,745,518 8,589 9,298

For data sources see[6]

Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2011 EQT PROD CO 0.00 0 0.00 0 0.00 0
2012 EQT PROD CO 0.00 0 0.00 0 0.00 0
2013 EQT PROD CO 0.00 0 0.00 0 0.00 0
2014 EQT PROD CO 227,504.00 140 0.00 0 0.00 0
2015 EQT PROD CO 360,331.00 363 0.00 0 0.00 0
2016 EQT PROD CO 257,073.00 359 0.00 0 0.00 0
2017 EQT PROD CO 193,114.00 359 0.00 0 0.00 0
2018 EQT PROD CO 237,517.00 353 0.00 0 0.00 0
2019 EQT PROD CO 186,151.00 364 0.00 0 0.00 0

For data sources see[7]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2012 EQT PROD CO Drilling Fluid Waste 16,175.00 Bbl REUSE OTHER THAN ROAD SPREADING
2013 EQT PROD CO Produced Fluid 213.00 Bbl REUSE OTHER THAN ROAD SPREADING
2013 EQT PROD CO Drilling Fluid Waste 770.00 Bbl REUSE OTHER THAN ROAD SPREADING
2014 EQT PROD CO Drill Cuttings 15.00 Tons LANDFILL 101397
2014 EQT PROD CO Produced Fluid 12,671.00 Bbl REUSE OTHER THAN ROAD SPREADING
2014 EQT PROD CO Fracing Fluid Waste 4,479.00 Bbl REUSE OTHER THAN ROAD SPREADING
2014 EQT PROD CO Produced Fluid 821.00 Bbl INJECTION DISPOSAL WELL 34-155-24076
2014 EQT PROD CO Produced Fluid 210.00 Bbl INJECTION DISPOSAL WELL 34-007-24355
2014 EQT PROD CO Produced Fluid 125.00 Bbl INJECTION DISPOSAL WELL 34-155-24075
2014 EQT PROD CO Fracturing Fluid Waste 26.82 Tons LANDFILL 101397
2014 EQT PROD CO Produced Fluid 1,587.00 Bbl INJECTION DISPOSAL WELL 34-007-21847
2014 EQT PROD CO Produced Fluid 100.00 Bbl INJECTION DISPOSAL WELL 34-007-2-3097
2014 EQT PROD CO Produced Fluid 1,380.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123
2015 EQT PROD CO Produced Fluid 550.00 Bbl INJECTION DISPOSAL WELL 34-007-21847
2015 EQT PROD CO Produced Fluid 130.00 Bbl INJECTION DISPOSAL WELL 34-155-23223
2015 EQT PROD CO Produced Fluid 93.00 Bbl INJECTION DISPOSAL WELL 34-155-21893
2015 EQT PROD CO Produced Fluid 583.00 Bbl CENT WASTE TRT FAC NPDES EPA ID: 748-163
2015 EQT PROD CO Produced Fluid 195.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR123NW011
2015 EQT PROD CO Produced Fluid 100.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123
2015 EQT PROD CO Produced Fluid 445.00 Bbl INJECTION DISPOSAL WELL 34-007-24355
2015 EQT PROD CO Produced Fluid 241.00 Bbl INJECTION DISPOSAL WELL 34-007-23262
2015 EQT PROD CO Produced Fluid 130.00 Bbl INJECTION DISPOSAL WELL 34-155-22403
2015 EQT PROD CO Produced Fluid 583.00 Bbl CENT WASTE TRT FAC NPDES DISCHARGE EPA ID: 748-163
2015 EQT PROD CO Produced Fluid 7,990.00 Bbl REUSE OTHER THAN ROAD SPREADING
2016 EQT PROD CO Synthetic Liner Materials 7.82 Tons LANDFILL 101397
2016 EQT PROD CO Produced Fluid 1,494.00 Bbl REUSE OTHER THAN ROAD SPREADING
2016 EQT PROD CO Other Oil & Gas Wastes 240.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW005
2016 EQT PROD CO Produced Fluid 1,604.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR123NW011
2016 EQT PROD CO Produced Fluid 29.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW004
2016 EQT PROD CO Produced Fluid 2,510.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW005
2017 EQT PROD CO Produced Fluid 1,325.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW011
2017 EQT PROD CO Produced Fluid 1,815.00 Bbl REUSE (AT WELL PAD)
2017 EQT PROD CO Other Oil & Gas Wastes 110.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW011
2017 EQT PROD CO Produced Fluid 637.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW005
2018 EQT PROD CO Produced Fluid 1,069.34 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW005
2018 EQT PROD CO Produced Fluid 2,835.90 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW011
2018 EQT PROD CO Produced Fluid 14.31 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW019
2018 EQT PROD CO Produced Fluid 126.12 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW009
2018 EQT PROD CO Produced Fluid 255.19 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW005
2018 EQT PROD CO Produced Fluid 407.09 Bbl REUSE (AT WELL PAD)
2019 EQT PROD CO Other Oil & Gas Wastes 28.60 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC010
2019 EQT PROD CO Produced Fluid 219.33 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC010
2019 EQT PROD CO Produced Fluid 14.45 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123
2019 EQT PROD CO Produced Fluid 49.93 Bbl SURFACE IMPOUNDMENT 95-7-37312-19
2019 EQT PROD CO Produced Fluid 20.26 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW010
2019 EQT PROD CO Produced Fluid 965.70 Bbl REUSE (AT WELL PAD)
2019 EQT PROD CO Produced Fluid 94.06 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW005
2019 EQT PROD CO Other Oil & Gas Wastes 223.00 Bbl REUSE (AT WELL PAD)
2019 EQT PROD CO Produced Fluid 177.16 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW009

For data sources see[8]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
2058879 Primary Facility 2012-04-11 Routine/Complete Inspection No Violations Noted
2103910 Primary Facility 2012-09-20 Drilling/Alteration No Violations Noted
2109956 Primary Facility 2012-10-23 Routine/Complete Inspection No Violations Noted
2109964 Primary Facility 2012-10-23 Routine/Complete Inspection No Violations Noted
2126871 Primary Facility 2013-01-02 Routine/Complete Inspection No Violations Noted
2127795 Primary Facility 2012-12-21 Follow-up Inspection No Violations Noted
2130118 Primary Facility 2013-01-14 Routine/Complete Inspection Viol(s) Noted & Immediately Corrected
2130880 Primary Facility 2013-01-16 Follow-up Inspection No Violations Noted
2132785 Primary Facility 2013-01-23 Routine/Complete Inspection No Violations Noted
2134942 Primary Facility 2013-01-31 Routine/Complete Inspection No Violations Noted
2137019 Primary Facility 2013-02-07 Routine/Complete Inspection No Violations Noted
2143138 Primary Facility 2013-02-27 Routine/Complete Inspection No Violations Noted
2154902 Primary Facility 2013-04-09 Routine/Complete Inspection No Violations Noted
2225264 Primary Facility 2013-11-26 Routine/Complete Inspection No Violations Noted
2253579 Primary Facility 2014-03-13 Routine/Complete Inspection No Violations Noted
2276218 Primary Facility 2014-06-04 Routine/Complete Inspection No Violations Noted
2286462 Primary Facility 2014-07-10 Routine/Complete Inspection No Violations Noted
2313823 Primary Facility 2014-10-17 Routine/Complete Inspection No Violations Noted
2371809 Primary Facility 2015-05-21 Routine/Complete Inspection No Violations Noted
2390883 Primary Facility 2015-07-20 Routine/Complete Inspection No Violations Noted
2393482 Primary Facility 2015-07-29 Routine/Complete Inspection No Violations Noted
2395582 Primary Facility 2015-08-05 Routine/Complete Inspection No Violations Noted
2425269 Primary Facility 2015-11-16 Routine/Complete Inspection No Violations Noted
2450804 Primary Facility 2016-02-19 Site Restoration No Violations Noted
2551048 Primary Facility 2017-01-10 Routine/Complete Inspection No Violations Noted
2686459 Primary Facility 2018-01-23 Routine/Complete Inspection No Violations Noted Routine site inspection at EQT Production Company's Turkey Well Pad on January 23, 2018. No one was onsite durning the time of my inspection. There are a total of 5 producing Marcellus wells drilled on this well pad (033-27049, 033-27051, 033-27053, 033-27055, and 033-27057).

The pad was originally permitted for 11 wells but only 5 of the 11 have been drilled to date.

All 5 wells are tagged with the API/well # and each well is plumbed to a gas production unit which include metering instrumentation, heater, and fluids separator. Well cellars are covered in metal grates, cellars are approximately half full, no oil sheen or bubbling was observed. There are (5) 400 bbl produced fluids tanks located in secondary containment. Containment appears intact. Approximately 2 inches of water was observed in this containment with a field screen reading of 1989 uS/cm.

The well pad has been reduced in size. The original design included (2) lined reserve/cutting pits along the entire SW edge of the Turkey Pad. These pit

2723070 Primary Facility 2018-04-24 Routine/Complete Inspection No Violations Noted I met Steve Shiner and Lance Beloney of Energy Water Solutions when I arrived. The VOX unit was not running; Steve informed me that the volume of water being produced by the wells had allowed them to run the unit for 5 days of 1200 gallon batches, but that there wasn't enough produced water in the production tanks to run a batch that day. So far, the unit has been able to evaporate approximately 20% of each batch before solids began to drop out. The stack test for the RFD is currently scheduled for May 15th. I noted two tanks, both empty, that were not in secondary containment; a 35 gallon propylene glycol tank next to one of the GPUs, and a double tank of methanol near the dehy unit. Although these tanks were empty, they had been in use recently; I recommend that these kinds of tanks be placed in secondary containment in the future. At the production tank containment, I noted that all of the 90 degree elbows on the feed lines to the tank were heavily corroded; one in particular (see photo) appeared to
2851662 Primary Facility 2019-03-11 Routine/Complete Inspection No Violations Noted The weather is 45 Deg. F, windy and sunny at time of inspection. Routine inspection of EQT Production Co., Turkey Pad, Well # 591244 on March 11, 2019. There are 5 active wells on this pad.

This well is open and producing at the time of inspection. Both annular vents (production by intermediate and intermediate by surface) are open and vented to the atmosphere. Unable to verify annular vents for gas using gas meter due to annular vent pipes are being raised up to unreachable height without a ladder. 0% combustible gas was detected in the area immediately surrounding the well. Production tubing pressure is 372 PSI, backside casing pressure 439 PSI. Production processing equipment on location includes 5 production water tanks, 5 gas processing units, 1 sand trap, measurement equipment ¿ orifice meter stations. No violations are noted at time of inspection, but DEP recommends labeling annular vents. DEP Representative - Ulyana Trynovich, Oil and Gas Inspector, Melissa Sue Herzing, Water Quality Specialist.

Violations Commited

Inspection ID Violation ID Violation Date Date Resolved Violation Code Violation Type Violation Comments
2130118 657643 01/14/2013 2013-01-14 91.34A - Failure to take all necessary measures to prevent spill. Inadequate diking, potential pollution Environmental Health & Safety

For data sources see[9]

References