Well ID: 37-039-25720
Loading map...
Country: United States
State: Pennsylvania
County: Crawford
Municipality: Hayfield Township
Operator Name: O & R DRILLING & EXPL INC
Well Pad ID:
Farm/Lease Name: KNUTH UNIT 11
License Status:
Spud Date:
Permit Date: 2010-08-09
Well Type: GAS
Unconventional Well: N
Configuration: Vertical Well
Conservation: Yes
Latitude: 41.757686
Longitude: -80.149536

For data sources see[1][2][3]

Well History

Date Event
2010-08-09 New Permit Application
2010-10-18 Performed Spud Operation
2010-11-06 Drilling Completion
2011-02-11 Perforation
2011-05-18 NEWLY DRILLED

For data sources see[4]


Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2010 D & L ENERGY INC 0.00 0 0.00 0 0.00 0

For data sources see[5]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
1948806 Primary Facility 2011-02-08 Routine/Complete Inspection Violation(s) Noted
1950691 Primary Facility 2011-02-17 Routine/Complete Inspection No Violations Noted
1965832 Primary Facility 2011-04-13 Routine/Complete Inspection No Violations Noted
1967796 Primary Facility 2011-04-22 Routine/Complete Inspection Violation(s) Noted Today Jon Scott and I inspected this gas well site in follow-up to Jon's 4/13/2011 inspection to determine if the operator had corrected the E&S concerns that Jon had told them about in a voice mail on 4/13/11. Upon inspection we found the operator had made some improvements, however the E&S controls remain in a state of disrepair. The slit fence is down in (2) locations on the north edge of the site and significant slit has left the slit traveling over 50 yards down slope. Also the slit fence is down on the east edge of the site with slit leaving the site as well. I called Jordan Florida, the local Rep for O&R Drilling and setup an on-site to review the problem for 4/25/2011.
1967979 Primary Facility 2011-04-25 Follow-up Inspection Outstanding Violations - No Viols Req'd Today Scott Lux and I completed a follow-up inspection of this gas well site to determine if the operator repaired the E&S controls and slumping pit liner as required during our 4/23/2011 phone conversation, and to review what actions need to be taken to prevent further acclerated erosion. Upon inspection we found the operator had repaired the slit fence on the north edge of the site and also pulled up and secured the pit liner as required. However the slit fence remained down on the east edge of the site and the accerlated erosion is still occurring. After walking the site perimeter with the operator, the operator decided to eliminate vechile traffic on the well site access road and redirect the sheet flow from the fields on the west side of the site, to the access road. This work would be done after the operator installs (3) water bars to catch and hold the water on the road. Also the operaor will repair the down slit fence , and dredge/cleanout (3) sediment basins.
1972088 Primary Facility 2011-05-09 Follow-up Inspection No Violations Noted Today Scott Lux and I conducted a follow-up inspection of this site to determine if the violations identified on 4/22/11 have been corrected. Upon inspection we found the violations corrected.
1976681 Primary Facility 2011-05-16 Follow-up Inspection Violation(s) Noted Today's inspection was in follow-up to my 5/9/2011 inspection to determine if the E&S controls that have been installed have been maintained as required. Upon inspection I found the pits had been clsoed and the site remains unstable. The extensive nature of the earth moving for both the access road and the site , combine with the slope creates accerlated erosion that is being managed by water bars on the access road,sump pits on the site and slit fence. Upon inspedctiontoday i found the access road erosion being managed. However the site erosion was not. Sediment from the site has filed the sump and is overflowing with the water outflow, overburdening the slit fence. The slit fence is down once again on the north end of the ite and sediment has left the site. I will call the operator and issue an NOV.
1978012 Primary Facility 2011-06-06 Follow-up Inspection No Violations Noted Today's inspection was in follow-up to my 5/16 inspection and 6/1 phone conversation will company owner Ohannes Karaoghlanian to determine if the BMPS have been repaired as required. Upon inspeciton I found all slit fence reinstalled and all (4) sediment basins cleaned out. I also recieved the revised E&S plan as requested. This site needs reclaimed or steps taken to stabilze the soil must be taken; the pit area is not completely reclaimed.
1985000 Primary Facility 2011-06-28 Follow-up Inspection Violation(s) Noted Inspection revealed the drill pit reclaim was not completed according to the requiermetns in the regulation. An NOV was sent.
1985028 Primary Facility 2011-06-27 Follow-up Inspection Violation(s) Noted Follow-up inspection to determine if the site BMP are being maintained and check the status of the site and pit reclaim. Upon inspection I found the BMP are not being matined as required and the site reclaim work has not changed sincew my last inspection on June 6 2011. This even though i had cautioned the operator that he must keep the BMPs up and finish the reclaim to reduce potential problems.
1985194 Primary Facility 2011-06-29 Follow-up Inspection Outstanding Violations - No Viols Req'd On-site with Curtis LeSuer to collect samples of liquid flowing from hole in drill pit liner and from on top of the liner.
1989224 Primary Facility 2011-07-15 Routine/Complete Inspection Outstanding Violations - No Viols Req'd Scott Lux and I met on-site with Operator/owner Ohannes Karolighain, and consultant to review the violations identifed in previous NOV's. Also discussed the need for action plan submittal by 7/29/2011.
1995391 Primary Facility 2011-08-01 Follow-up Inspection Outstanding Violations - No Viols Req'd Met dirt contractor on-site to review action plan to clean-up old pit and stabilze ground surface. Dirt contractor will be digging a new waste pit and transfering the old liner and pit contents. I instructed him to call me for a inspection of the old pit area and the new pit before flling in and closing.
1995498 Primary Facility 2011-08-03 Routine/Complete Inspection No Violations Noted Today's inspection was to verify the work completed to clean-up and relocate the waste pit contents at this well site. I met the dirt contractor on-site and inspected the old pit area and the new pit , before covering and closure. Upon inspection I found the work completed as required. The area still needs covered and stabilzed with seed and mulch.
2001466 Primary Facility 2011-08-25 Follow-up Inspection No Violations Noted Follow-up inspection to check on status of reclaim- the well pad has been graded and part of the lengthy access road pushed back- some grass growing on access road. top soil still needs to be pushed back on well pad and some of the road, everything needs and seeded/mulched.
2004619 Primary Facility 2011-09-22 Follow-up Inspection No Violations Noted Follow-up to determine if the access road and well pad have been reclaimed and stabilzed as required. Upon inspection I found the access road back to orginal grade with mulch and grass seed applied. The well pad site was also graded, mulched and seeded. However a top soil pile on the south edge of the site and (2) sumps on the north edge of the site remain on-site. I called the dirt contractor Jordan Flordia and he stated he left these in place intentionally because he expected the well gas pad site will be reworked when fracing for the utica.
2014414 Primary Facility 2011-10-27 Site Restoration No Violations Noted Site restoration inspection- the access road was back to grade and have 80 % grass cover- no e&s problems- the well pad was reclaimed and grass was at 80% no E&S problems- small top soil pile still remains on south edge of well pad- one sump remains on the north edge of well pad-
2091179 Primary Facility 2012-08-03 Follow-up Inspection No Violations Noted
2231386 Primary Facility 2013-12-19 Routine/Complete Inspection No Violations Noted
2439587 Primary Facility 2016-01-07 Routine/Complete Inspection No Violations Noted
2779269 Primary Facility 2018-09-25 Routine/Partial Inspection Violation(s) Noted Inspected location, well sits behind a soybean field, well is shut-in, well is equipped with 8 5/8's surface casing which is open, 4 1/2 production casing which is shut-in, and 1 1/2 tubing which is shut-in, tanks and separator sit near road in earthen containment, separator is shut-in and has no chart on it, no fluid was observed in tanks.

Violations Commited

Inspection ID Violation ID Violation Date Date Resolved Violation Code Violation Type Violation Comments
1948806 604524 02/08/2011 2011-02-08 201G - Failure to post permit number, operator name, address, telephone number in a conspicuous manner at the site during drilling Administrative
1967796 609345 04/22/2011 2011-04-22 102.4 - Failure to minimize accelerated erosion, implement E&S plan, maintain E&S controls. Failure to stabilize site until total site restoration under OGA Sec 206(c)(d) Environmental Health & Safety
1976681 612339 05/16/2011 2011-05-16 102.4 - Failure to minimize accelerated erosion, implement E&S plan, maintain E&S controls. Failure to stabilize site until total site restoration under OGA Sec 206(c)(d) Environmental Health & Safety
1985000 614632 06/28/2011 2011-06-28 78.62 - Improper encapsulation of waste Administrative
1985000 619064 06/28/2011 2011-06-28 78.54* - Failure to properly control or dispose of industrial or residual waste to prevent pollution of the waters of the Commonwealth. Environmental Health & Safety
1985000 619065 06/28/2011 2011-06-28 SWMA301 - Failure to properly store, transport, process or dispose of a residual waste. Environmental Health & Safety
1985028 619067 06/27/2011 2011-06-27 102.11 - Failure to design, implement or maintain BMPs to minimize the potential for accelerated erosion and sedimentation. Administrative
2779269 830405 2018-09-25 78.88(a) Administrative
2779269 830406 2018-09-25 78.88(e) Administrative
2779269 830407 2018-09-25 OGA3220(A) Environmental Health & Safety
2779269 830408 2018-09-25 78.121(A) Administrative
2779269 830409 2018-09-25 78.121(B) Administrative

Penalties Applied

Violation ID Penalty ID Penalty Code Penalty Status Penalty Date Enforcement Date Penalty Amount Amount Collected
604524 270782 NOV - Notice of Violation Comply/Closed 2011-02-17
609345 270086 NOV - Notice of Violation Comply/Closed 2013-10-30
609345 304255 CACP - Consent Assessment of Civil Penalty Comply/Closed 2013-10-30 2013-10-30 $4,000.00 $4,000.00
612339 304255 CACP - Consent Assessment of Civil Penalty Comply/Closed 2013-10-30 2013-10-30 $4,000.00 $4,000.00
614632 272353 NOV - Notice of Violation Comply/Closed 2013-10-30
614632 304255 CACP - Consent Assessment of Civil Penalty Comply/Closed 2013-10-30 2013-10-30 $4,000.00 $4,000.00
619064 304255 CACP - Consent Assessment of Civil Penalty Comply/Closed 2013-10-30 2013-10-30 $4,000.00 $4,000.00
619065 304255 CACP - Consent Assessment of Civil Penalty Comply/Closed 2013-10-30 2013-10-30 $4,000.00 $4,000.00
619067 304255 CACP - Consent Assessment of Civil Penalty Comply/Closed 2013-10-30 2013-10-30 $4,000.00 $4,000.00
830405 368436 NOV - Notice of Violation
830406 368436 NOV - Notice of Violation
830407 368436 NOV - Notice of Violation
830408 368436 NOV - Notice of Violation
830409 368436 NOV - Notice of Violation