| Well ID: 37-051-21612 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":39.960415,"lon":-79.982572,"icon":""}]} |
| Country: United States | |
| State: Pennsylvania | |
| County: Fayette | |
| Municipality: Luzerne Township | |
| Operator Name: THE PRODUCTION CO LLC | |
| Well Pad ID: | |
| Farm/Lease Name: JAMES E FREY 1 | |
| License Status: ACTIVE | |
| Spud Date: | |
| Permit Date: 2002-11-20 | |
| Well Type: GAS | |
| Unconventional Well: N | |
| Configuration: Vertical Well | |
| Conservation: No | |
| Latitude: 39.960415 | |
| Longitude: -79.982572 |
| Date | Event |
|---|---|
| 2002-11-20 | New Permit Application |
| 2003-01-06 | Performed Spud Operation |
| 2003-01-14 | Drilling Completion |
| 2003-04-14 | NEWLY DRILLED |
For data sources see[4]
| Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
|---|---|---|---|---|---|---|---|
| 2003 | BURKLAND WILLIAM S | 160 | 20 | 0.00 | 0 | 0.00 | 0 |
| 2004 | BURKLAND WILLIAM S | 7563 | 365 | 0.00 | 0 | 0.00 | 0 |
| 2005 | BURKLAND WILLIAM S | 6927 | 365 | 0.00 | 0 | 0.00 | 0 |
| 2007 | BURKLAND WILLIAM S | 5488.00 | 365 | 0.00 | 0 | 0.00 | 0 |
| 2008 | BURKLAND WILLIAM S | 4469.00 | 365 | 0.00 | 0 | 0.00 | 0 |
| 2009 | BURKLAND WILLIAM S | 3235.00 | 365 | 0.00 | 0 | 0.00 | 0 |
| 2010 | BURKLAND WILLIAM S | 3,620.00 | 365 | 0.00 | 0 | 0.00 | 0 |
| 2011 | THE PRODUCTION CO | 3,093.74 | 365 | 0.00 | 0 | 0.00 | 0 |
| 2012 | THE PRODUCTION CO | 2,235.11 | 365 | 0.00 | 0 | 0.00 | 0 |
| 2013 | THE PRODUCTION CO LLC | 1,911.58 | 365 | 0.00 | 0 | 0.00 | 0 |
| 2014 | THE PRODUCTION CO LLC | 2,496.35 | 365 | 0.00 | 0 | 0.00 | 0 |
| 2015 | THE PRODUCTION CO LLC | 2,639.15 | 365 | 0.00 | 0 | 0.00 | 0 |
| 2016 | THE PRODUCTION CO LLC | 2,457.20 | 366 | 0.00 | 0 | 0.00 | 0 |
| 2017 | THE PRODUCTION CO LLC | 2,204.50 | 365 | 0.00 | 0 | 0.00 | 0 |
For data sources see[5]
| Period | Operator | Waste Type | Quantity | Disposal Method | Waste Facility ID |
|---|---|---|---|---|---|
| 2011 | THE PRODUCTION CO | Produced Fluid | 4.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0095273 |
| 2013 | THE PRODUCTION CO LLC | Produced Fluid | 45 Bbl | CENT WASTE TRT FAC NPDES | PA0095273 |
| 2013 | THE PRODUCTION CO LLC | Produced Fluid | 45.00 Bbl | CENT WASTE TRT FAC NPDES DISCHARGE | PA0095273 |
For data sources see[6]
| Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
|---|---|---|---|---|---|
| 1210777 | Primary Facility | 2003-02-03 | Drilling/Alteration | No Violations Noted | needs reclamed |
| 1227544 | Primary Facility | 2003-04-16 | Routine/Complete Inspection | No Violations Noted | Burkland site ID/plan here. Gravel access Rd. Site is above DEP reclam. strip site. Lined cutting pit with cuttings here. Secondary sump excavated. Well drilled w/nipple top & valve. Topsoil stockpiled. Awaits restoration and development. |
| 1350036 | Primary Facility | 2004-07-07 | Routine/Complete Inspection | No Violations Noted | Access is off Rices Landing Rd. Extension of access beyond Frey is in progress toward Broadwaters w/grading & sub-base for the access going in. Bench at Freys is revegetated well, grading back to contour there. Stone is being gotten from an on-site area. |
For data sources see[7]