X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

37-053-00082

Well Details

Well ID: 37-053-00082
Loading map...
Country: United States
State: Pennsylvania
County: Forest
Municipality: Tionesta Township
Operator Name: NORTH PENN GAS CO
Well Pad ID:
Farm/Lease Name: RED BRUSH OIL CO 280
License Status: PLUGGED & ABANDONED
Spud Date:
Permit Date:
Well Type: GAS
Unconventional Well: N
Configuration: Vertical Well
Conservation: No
Latitude: 41.407140
Longitude: -79.438955

For data sources see[1][2][3]

Well History

Date Event
1912-06-08 Drilling Completion
2000-02-10 OLD WELL
2000-05-15 Drilling Completion
2000-07-21 FULLY PLUGGED

For data sources see[4]


Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
1991 NORTH PENN GAS CO 0.00 0 0.00 0 0.00 0
1992 NORTH PENN GAS CO 0.00 0 0.00 0 0.00 0
1993 NORTH PENN GAS CO 0.00 0 0.00 0 0.00 0
1994 NORTH PENN GAS CO 0.00 0 0.00 0 0.00 0
1995 NORTH PENN GAS CO 0.00 0 0.00 0 0.00 0
1996 NORTH PENN GAS CO 0.00 0 0.00 0 0.00 0
1997 NORTH PENN GAS CO 0.00 0 0.00 0 0.00 0
1998 NORTH PENN GAS CO 0.00 0 0.00 0 0.00 0
1999 NORTH PENN GAS CO 0.00 0 0.00 0 0.00 0
2000 NORTH PENN GAS CO 0.00 0 0.00 0 0.00 0

For data sources see[5]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
1106281 Primary Facility 2002-03-05 Follow-up Inspection No Violations Noted
1334431 Primary Facility 2004-04-29 Routine/Complete Inspection Violation(s) Noted
939732 Primary Facility 2000-05-10 Plugging(Includes Plugged/Mined Through) No Violations Noted

Violations Commited

Inspection ID Violation ID Violation Date Date Resolved Violation Code Violation Type Violation Comments
1334431 394344 04/29/2004 2004-04-29 206D - Failure to restore site w/in 9 months of plugging well Environmental Health & Safety rod lines and pipe left on location

For data sources see[6]

References