If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 37-059-26355 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":39.942392,"lon":-80.130586,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Greene | |
Municipality: Morgan Township | |
Operator Name: EQT PROD CO | |
Well Pad ID: 150676 | |
Farm/Lease Name: ALPHA 1 592150 | |
License Status: | |
Spud Date: | |
Permit Date: 2014-01-09 | |
Well Type: GAS | |
Unconventional Well: Y | |
Configuration: Horizontal Well | |
Conservation: No | |
Latitude: 39.942392 | |
Longitude: -80.130586 |
Date | Event |
---|---|
2014-01-09 | New Permit Application |
2014-04-30 | Performed Spud Operation |
2014-05-08 | New Permit Application |
2014-09-26 | Drilling Completion |
2014-11-23 | Performed Stimulation |
2014-11-24 | Perforation |
2016-03-09 | DEVIATED |
For data sources see[4]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 2014-11-23 | 2014-12-06 | 7,799 | 15,971,100 | 0 |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | Sand (Proppant) | Keane Group | Proppant | Silica Substrate | 14808-60-7 | 100 | 9.85446 | 14,618,000.0 |
Hydrochloric Acid (15%) | Keane Group | Acidizing | Hydrochloric Acid | 7647-01-0 | 15 | 0.0305222 | 45276.2 | |
EC6111A | Keane Group | Biocide | Glutaraldehyde | 111-30-8 | 30 | 0.00317439 | 4708.85 | |
SL 1014/1072 | Keane Group | Friction Reducer | Petroleum distillates, hydrotreated light | 64742-47-8 | 25 | 0.0200516 | 29744.2 | |
LEB-10X | Keane Group | Gel breaker | Ethylene Glycol | 107-21-1 | 30 | 0.000117463 | 174.244 | |
AI 600 | Keane Group | Acid corrosion inhibitor | 1-Octanol | 111-87-5 | 2.5 | 0.00001272 | 18.87 | |
Ispropanol | 67-63-0 | 2.5 | 0.00001272 | 18.87 | ||||
Poly(oxy-1,2-ethanediyl), .alpha.-(4-nonylphenyl)-.omega.-hydroxy-,branche d |
127087-87-0 | 5 | 0.00002544 | 37.739 | ||||
N, N-Dimethylformamide | 68-12-2 | 20 | 0.000101765 | 150.956 | ||||
Triethyl phosphate | 78-40-0 | 2.5 | 0.00001272 | 18.87 | ||||
Cinnamaldehyde | 104-55-2 | 15 | 0.00007632 | 113.217 | ||||
Ethylene Glycol | 107-21-1 | 40 | 0.000203529 | 301.912 | ||||
Tar bases, quinoline derivs, benzyl chloride-quaternized | 72480-70-7 | 15 | 0.00007632 | 113.217 | ||||
1-Deconal | 112-30-1 | 5 | 0.00002544 | 37.739 | ||||
2-Butoxyethanol | 111-76-2 | 15 | 0.00007632 | 113.217 | ||||
Water | Keane Group | Carrier/Base Fluid | Water | 7732-18-5 | 100 | 89.8478 | 133,279,000.0 | |
Chlorine Dioxide Solution - SVP - Pure | Neptune | Disinfectant/oxidizer | Chlorine dioxide | 10049-04-4 | 0.3 | 0.00000148 | 2.192 | |
FRA 407 | Keane Group | Friction reducer | Ammonium acetate | 631-61-8 | 5 | 0.000102215 | 151.624 | |
Petroleum distillates, hydrotreated light | 64742-47-8 | 40 | 0.000817719 | 1212.99 |
For data sources see[5]
Stimulation Date | Phase Number | Chemical Agent | Volume (gal) | Treating Pressure (psi) | Breakdown Pressure (psi) |
---|---|---|---|---|---|
2014-11-23 | 0 | 0 | 0 |
For data sources see[6]
Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
---|---|---|---|---|---|---|---|
2014 | EQT PROD CO | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2015 | EQT PROD CO | 1,606,031.00 | 165 | 0.00 | 0 | 0.00 | 0 |
2016 | EQT PROD CO | 2,100,376.00 | 366 | 0.00 | 0 | 0.00 | 0 |
2017 | EQT PROD CO | 1,124,528.00 | 344 | 0.00 | 0 | 0.00 | 0 |
2018 | EQT PROD CO | 832,395.00 | 365 | 0.00 | 0 | 0.00 | 0 |
2019 | EQT PROD CO | 691,471.00 | 365 | 0.00 | 0 | 0.00 | 0 |
For data sources see[7]
Period | Operator | Waste Type | Quantity | Disposal Method | Waste Facility ID |
---|---|---|---|---|---|
2014 | EQT PROD CO | Drill Cuttings | 1,137.05 Tons | LANDFILL | 100419 |
2014 | EQT PROD CO | Drilling Fluid Waste | 4,810.00 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2015 | EQT PROD CO | Fracturing Fluid Waste | 67.00 Tons | LANDFILL | SWF 1032-WV0109 |
2015 | EQT PROD CO | Drilling Fluid Waste | 150.00 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2015 | EQT PROD CO | Fracing Fluid Waste | 110.00 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123SW005 |
2015 | EQT PROD CO | Produced Fluid | 2,200.00 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123SW005 |
2015 | EQT PROD CO | Fracturing Fluid Waste | 9.01 Tons | LANDFILL | 100277 |
2015 | EQT PROD CO | Fracing Fluid Waste | 17,081.00 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2015 | EQT PROD CO | Produced Fluid | 46,611.00 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2015 | EQT PROD CO | Fracturing Fluid Waste | 24.00 Tons | LANDFILL | 101397 |
2016 | EQT PROD CO | Produced Fluid | 110.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW001 |
2016 | EQT PROD CO | Produced Fluid | 860.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW005 |
2016 | EQT PROD CO | Synthetic Liner Materials | 15.00 Tons | LANDFILL | 100419 |
2016 | EQT PROD CO | Produced Fluid | 1,000.00 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123SW005 |
2016 | EQT PROD CO | Produced Fluid | 100.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW019 |
2016 | EQT PROD CO | Other Oil & Gas Wastes | 1.09 Tons | LANDFILL | 100277 |
2016 | EQT PROD CO | Produced Fluid | 28,875.00 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2017 | EQT PROD CO | Produced Fluid | 130.00 Bbl | REUSE AT A WELL PAD OUTSIDE PENNSYLVANIA | |
2017 | EQT PROD CO | Produced Fluid | 130.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW010 |
2017 | EQT PROD CO | Produced Fluid | 480.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW005 |
2017 | EQT PROD CO | Produced Fluid | 1,965.00 Bbl | REUSE (AT WELL PAD) | |
2018 | EQT PROD CO | Produced Fluid | 24.24 Bbl | INJECTION DISPOSAL WELL | 34-009-23823 |
2018 | EQT PROD CO | Other Oil & Gas Wastes | 128.34 Bbl | REUSE (AT WELL PAD) | |
2018 | EQT PROD CO | Produced Fluid | 789.16 Bbl | REUSE (AT WELL PAD) | |
2018 | EQT PROD CO | Produced Fluid | 18.64 Bbl | REUSE AT A WELL PAD OUTSIDE PENNSYLVANIA | |
2018 | EQT PROD CO | Produced Fluid | 302.13 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW005 |
2018 | EQT PROD CO | Produced Fluid | 25.86 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | ORDER 2016-415 |
2019 | EQT PROD CO | Other Oil & Gas Wastes | 18.33 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW005 |
2019 | EQT PROD CO | Other Oil & Gas Wastes | 363.92 Bbl | REUSE (AT WELL PAD) | |
2019 | EQT PROD CO | Produced Fluid | 227.63 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW019 |
2019 | EQT PROD CO | Produced Fluid | 1,018.04 Bbl | REUSE (AT WELL PAD) | |
2019 | EQT PROD CO | Produced Fluid | 126.70 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW010 |
For data sources see[8]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
2269006 | Primary Facility | 2014-05-08 | Drilling/Alteration | No Violations Noted | 26" conductor set @ 22'; Alpha Rig 5 moving on location; |
2276115 | Primary Facility | 2014-05-03 | Drilling/Alteration | No Violations Noted | Drilled to 240' TD; attempting to run 20" casing with threading issues and getting hung up in hole on the conductor pipe; |
2280567 | Primary Facility | 2014-06-06 | Drilling/Alteration | No Violations Noted | Drilled to 240'; set 20"casing to 214'; cemented to surface 6/4/14; Open mine @439-444'; drilling to casing point below mine at this time; location good; |
2280599 | Primary Facility | 2014-06-12 | Drilling/Alteration | No Violations Noted | 9 5/8" pipe run on 6/9/14;to 2954'; cemented well to surface; 11 bls cement returns; |
2308692 | Primary Facility | 2014-09-23 | Drilling/Alteration | No Violations Noted | Pilot hole @ 6700TD; KOP@6700'; presently drilling @ 15261'; walked location; no containment or drilling issues; |
2318349 | Primary Facility | 2014-10-02 | Drilling/Alteration | No Violations Noted | TD @ 16950; 5 1/2" set @ 16947'; cemented with plug down 9/26/14; |
2338550 | Primary Facility | 2014-11-03 | Routine/Complete Inspection | No Violations Noted | Well drilled. Well waiting to be fracked. |
2376894 | Primary Facility | 2015-06-04 | Routine/Complete Inspection | No Violations Noted | On 6/4/15, I inspected the Alpha 1 Pad as routine inspection and made the following observations: |
2398869 | Primary Facility | 2015-07-28 | Incident- Response to Accident or Event | No Violations Noted | On 7/28/15, I inspected the Alpha 1 site in response to an operator reported spill and made the following observations: |
2399481 | Primary Facility | 2015-08-06 | Follow-up Inspection | No Violations Noted | On 8/6/15, I performed a follow up inspection on the Alpha 1 site meeting with EQT representative Corey Giles to gather further information about a production fluid spill that occurred and was reported on 7/27/15: |
2448358 | Primary Facility | 2016-02-04 | Administrative/File Review | No Violations Noted | An administrative compliance evaluation inspection in response to the 8/6/15 Alpha 1 NOV indicates that as of 2/4/16 the situation is ready to be forwarded to the Environmental Cleanup Board. The dispensation of the site is as follows:
• On 7/27/15 EQT’s Corey Giles reported that “the containment for the sand tank accumulated 5,300 gallons of produced fluid. The containment overflowed releasing an additional 3-4 barrels to the pad surface.” • Administrative review of the initial clean up report and NOV response left some questions and issues unresolved. • An update to the initial response reviewed by DEP Kevin Maskol resolves all issues preventing the situation being taken over by ECB. |
2532579 | Primary Facility | 2016-10-14 | Routine/Complete Inspection | No Violations Noted | On 10/14/16 at approximately 1130 hours I conducted a routine complete inspection of the Alpha 1 pad. The Act 9 sign was in place and all required documents were present at the site. A drawing found in the mailbox (see photographs) roughly matched the site as constructed. According to Department records, this plan was not approved, nor were the changes made to the site.
Multiple violations of 102.5(m)(4) 102.5(c) were observed at the time of inspection and are listed below: -The road to the south of the well pad was not constructed in the approved location -The gravel area to the south of the well pad was not constructed as approved and an increase in impervious area has resulted. -The location approved as an impoundment was constructed as an AST pad and is a significant increase in impervious area. The area between the well pad, gravel pad to the south, and the location that was approved as an impoundment contained a large volume of water. The constructed features in this area are effectively working as |
For data sources see[9]