If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 37-059-26968 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":39.987542,"lon":-80.186661,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Greene | |
Municipality: Washington Township | |
Operator Name: EQT PROD CO | |
Well Pad ID: 145801 | |
Farm/Lease Name: SHIPMAN 593894 | |
License Status: Active | |
Spud Date: 2016-01-14 | |
Permit Date: 2015-11-06 | |
Well Type: GAS | |
Unconventional Well: Y | |
Configuration: Horizontal Well | |
Conservation: Yes | |
Latitude: 39.987542 | |
Longitude: -80.186661 |
Date | Event |
---|---|
2015-11-06 | New Permit Application |
2015-12-16 | Performed Spud Operation |
2016-03-13 | Performed Stage 39 of Stimulation |
2016-03-27 | Drilling Completion |
2016-04-22 | Performed Stage 1 of Stimulation |
2016-04-25 | Perforation |
2016-04-26 | Performed Stage 1 of Stimulation |
2016-04-27 | Perforation |
2016-04-27 | Performed Stage 1 of Stimulation |
2016-04-27 | Performed Stage 2 of Stimulation |
2016-04-28 | Perforation |
2016-04-28 | Performed Stage 3 of Stimulation |
2016-04-28 | Performed Stage 4 of Stimulation |
2016-04-29 | Perforation |
2016-04-29 | Performed Stage 5 of Stimulation |
2016-04-29 | Performed Stage 6 of Stimulation |
2016-04-29 | Performed Stage 7 of Stimulation |
2016-04-30 | Perforation |
2016-04-30 | Performed Stage 8 of Stimulation |
2016-04-30 | Performed Stage 9 of Stimulation |
2016-05-01 | Perforation |
2016-05-01 | Performed Stage 10 of Stimulation |
2016-05-01 | Performed Stage 11 of Stimulation |
2016-05-01 | Performed Stage 12 of Stimulation |
2016-05-02 | Perforation |
2016-05-02 | Performed Stage 13 of Stimulation |
2016-05-02 | Performed Stage 14 of Stimulation |
2016-05-02 | Performed Stage 15 of Stimulation |
2016-05-03 | Perforation |
2016-05-03 | Performed Stage 16 of Stimulation |
2016-05-03 | Performed Stage 17 of Stimulation |
2016-05-03 | Performed Stage 18 of Stimulation |
2016-05-04 | Perforation |
2016-05-04 | Performed Stage 19 of Stimulation |
2016-05-04 | Performed Stage 20 of Stimulation |
2016-05-04 | Performed Stage 21 of Stimulation |
2016-05-05 | Perforation |
2016-05-05 | Performed Stage 22 of Stimulation |
2016-05-05 | Performed Stage 23 of Stimulation |
2016-05-05 | Performed Stage 24 of Stimulation |
2016-05-06 | Perforation |
2016-05-06 | Performed Stage 25 of Stimulation |
2016-05-06 | Performed Stage 26 of Stimulation |
2016-05-08 | Perforation |
2016-05-08 | Performed Stage 26 of Stimulation |
2016-05-08 | Performed Stage 27 of Stimulation |
2016-05-09 | Perforation |
2016-05-09 | Performed Stage 28 of Stimulation |
2016-05-09 | Performed Stage 29 of Stimulation |
2016-05-09 | Performed Stage 30 of Stimulation |
2016-05-10 | Perforation |
2016-05-10 | Performed Stage 30 of Stimulation |
2016-05-10 | Performed Stage 31 of Stimulation |
2016-05-11 | Perforation |
2016-05-11 | Performed Stage 32 of Stimulation |
2016-05-11 | Performed Stage 33 of Stimulation |
2016-05-11 | Performed Stage 34 of Stimulation |
2016-05-11 | Performed Stage 35 of Stimulation |
2016-05-12 | Perforation |
2016-05-12 | Performed Stage 36 of Stimulation |
2016-05-12 | Performed Stage 37 of Stimulation |
2016-05-12 | Performed Stage 38 of Stimulation |
2018-11-14 | Deviated |
For data sources see[4]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 2016-04-20 | 2016-05-13 | 9,393 | 18,112,600 | 0 |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | SP Breaker | Halliburton | Breaker | Sodium persulfate | 7775-27-1 | 100 | 0.000877674 | 1470 |
Water | Halliburton | Carrier/Base Fluid | Water | 7732-18-5 | 100 | 90.2451 | 151,150,000.0 | |
HAI-OS Acid Inhibitor | Halliburton | Corrosion Inhibitor | Methanol | 67-56-1 | 60 | 0.000441664 | 739.734 | |
Ethoxylated alcohols | Proprietary | 30 | 0.000220832 | 369.867 | ||||
Propargyl alcohol | 107-19-7 | 10 | 0.00007361 | 123.289 | ||||
Modified thiourea polymer | Proprietary | 30 | 0.000220832 | 369.867 | ||||
Hydrochloric Acid (15%) | Halliburton | Acidizing | Hydrochloric Acid | 7647-01-0 | 15 | 0.0663736 | 111168 | |
Sand (Proppant) | Halliburton | Proppant | Silica Substrate | 14808-60-7 | 100 | 9.1301 | 15,291,800.0 | |
MC B-8614 | Halliburton | Biocide | Glutaraldehyde | 111-30-8 | 30 | 0.00658402 | 11027.5 | |
Quaternary ammonium compounds, benzyl-C-12-16-alkyldimethyl, chlorides |
68424-85-1 | 5 | 0.00109734 | 1837.91 | ||||
FDP-M1075-12 | Halliburton | Glycol Blend | Ethylene glycol | 107-21-1 | 60 | 0.0146967 | 24615.3 | |
BC-140 | Halliburton | Crosslinker | Ethylene glycol | 107-21-1 | 30 | 0.00006995 | 117.164 | |
WG-36 Gelling Agent | Halliburton | Gelling Agent | Guar gum | 9000-30-0 | 100 | 0.0350108 | 58639 | |
FR-76 | Halliburton | Anionic Polymer Emulsion | Inorganic salt | Proprietary | 30 | 0.0297078 | 49757.1 | |
Hydrotreated light petroleum distillate | 64742-47-8 | 30 | 0.0297078 | 49757.1 |
For data sources see[5]
Stimulation Date | Phase Number | Chemical Agent | Volume (gal) | Treating Pressure (psi) | Breakdown Pressure (psi) |
---|---|---|---|---|---|
2016-04-26 | 1 | None | 2,942,940 | 12,948 | 13,988 |
2016-04-27 | 2 | Sand, Imery Profile 40/70 | 2,942,940 | 13,415 | 15,031 |
2016-04-28 | 3 | Sand, Imery Profile 40/70 | 2,942,940 | 13,410 | 13,693 |
2016-04-28 | 4 | Sand, Imery Profile 40/70 | 2,942,940 | 13,274 | 14,114 |
2016-04-29 | 5 | Sand, Imery Profile 40/70 | 2,942,940 | 13,405 | 14,014 |
2016-04-29 | 6 | Sand, Imery Profile 40/70 | 2,942,940 | 13,317 | 14,077 |
2016-04-29 | 7 | Sand, Imery Profile 40/70 | 2,942,940 | 13,289 | 13,894 |
2016-04-30 | 8 | Sand, Imery Profile 40/70 | 2,942,940 | 13,421 | 14,116 |
2016-04-30 | 9 | Sand, Imery Profile 40/70 | 2,942,940 | 13,431 | 14,029 |
2016-05-01 | 10 | Sand, Imery Profile 40/70 | 2,942,940 | 13,450 | 13,810 |
2016-05-01 | 11 | Sand, Imery Profile 40/70 | 2,942,940 | 13,253 | 14,046 |
2016-05-01 | 12 | Sand, Imery Profile 40/70 | 2,942,940 | 13,132 | 14,138 |
2016-05-02 | 13 | Sand, Imery Profile 40/70 | 2,942,940 | 13,305 | 13,969 |
2016-05-02 | 14 | Sand, Imery Profile 40/70 | 2,942,940 | 13,398 | 14,011 |
2016-05-02 | 15 | Sand, Imery Profile 40/70 | 2,942,940 | 13,238 | 13,942 |
2016-05-03 | 16 | Sand, Imery Profile 40/70 | 2,942,940 | 13,196 | 14,055 |
2016-05-03 | 17 | Sand, Imery Profile 40/70 | 2,942,940 | 13,300 | 13,848 |
2016-05-03 | 18 | Sand, Imery Profile 40/70 | 2,942,940 | 13,040 | 13,795 |
2016-05-04 | 19 | Sand, Imery Profile 40/70 | 2,942,940 | 13,159 | 13,832 |
2016-05-04 | 20 | Sand, Imery Profile 40/70 | 2,942,940 | 13,024 | 14,009 |
2016-05-04 | 21 | Sand, Imery Profile 40/70 | 2,942,940 | 12,901 | 13,882 |
2016-05-05 | 22 | Sand, Imery Profile 40/70 | 2,942,940 | 12,931 | 13,844 |
2016-05-05 | 23 | Sand, Imery Profile 40/70 | 2,942,940 | 12,959 | 13,813 |
2016-05-05 | 24 | Sand, Imery Profile 40/70 | 2,942,940 | 12,842 | 13,239 |
2016-05-06 | 25 | Sand, Imery Profile 40/70 | 2,942,940 | 12,939 | 13,978 |
2016-05-06 | 26 | Sand, Imery Profile 40/70 | 2,942,940 | 12,871 | 14,676 |
2016-05-08 | 27 | Sand, Imery Profile 40/70 | 2,942,940 | 12,394 | 13,268 |
2016-05-09 | 28 | Sand, Imery Profile 40/70 | 2,942,940 | 12,443 | 13,333 |
2016-05-09 | 29 | Sand, Imery Profile 40/70 | 2,942,940 | 12,415 | 13,744 |
2016-05-09 | 30 | Sand, Imery Profile 40/70 | 2,942,940 | 12,338 | 13,687 |
2016-05-10 | 31 | Sand, Imery Profile 40/70 | 2,942,940 | 12,332 | 13,544 |
2016-05-11 | 32 | Sand, Imery Profile 40/70 | 2,942,940 | 12,134 | 13,320 |
2016-05-11 | 33 | Sand, Imery Profile 40/70 | 2,942,940 | 12,111 | 13,664 |
2016-05-11 | 34 | Sand, Imery Profile 40/70 | 2,942,940 | 1,202 | 13,572 |
2016-05-11 | 35 | Sand, Imery Profile 40/70 | 2,942,940 | 11,965 | 13,296 |
2016-05-12 | 36 | Sand, Imery Profile 40/70 | 2,942,940 | 11,928 | 12,931 |
2016-05-12 | 37 | Sand, Imery Profile 40/70 | 2,942,940 | 11,905 | 13,694 |
2016-05-12 | 38 | Sand, Imery Profile 40/70 | 2,942,940 | 11,719 | 13,343 |
2016-03-13 | 39 | Sand, Imery Profile 40/70 | 2,942,940 | 11,782 | 14,064 |
For data sources see[6]
Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
---|---|---|---|---|---|---|---|
2015 | EQT PROD CO | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2016 | EQT PROD CO | 3,631,871.00 | 221 | 0.00 | 0 | 0.00 | 0 |
2017 | EQT PROD CO | 1,204,745.00 | 365 | 0.00 | 0 | 0.00 | 0 |
2018 | EQT PROD CO | 64,079.00 | 37 | 0.00 | 0 | 0.00 | 0 |
2019 | EQT PROD CO | 467,861.00 | 289 | 0.00 | 0 | 0.00 | 0 |
For data sources see[7]
Period | Operator | Waste Type | Quantity | Disposal Method | Waste Facility ID |
---|---|---|---|---|---|
2015 | EQT PROD CO | Fracturing Fluid Waste | 33.85 Tons | LANDFILL | 101571 |
2016 | EQT PROD CO | Fracturing Fluid Waste | 28.67 Tons | RESIDUAL WASTE PROCESSING FACILITY | 2014-541 |
2016 | EQT PROD CO | Synthetic Liner Materials | 150.16 Tons | LANDFILL | 100419 |
2016 | EQT PROD CO | Servicing Fluid | 490.00 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2016 | EQT PROD CO | Produced Fluid | 1,680.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW005 |
2016 | EQT PROD CO | Drilling Fluid Waste | 6,280.00 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2016 | EQT PROD CO | Other Oil & Gas Wastes | 5,268.00 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2016 | EQT PROD CO | Produced Fluid | 20.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | WMGR123SW019 |
2016 | EQT PROD CO | Produced Fluid | 4,675.00 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123SW005 |
2016 | EQT PROD CO | Other Oil & Gas Wastes | 79.00 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123SW005 |
2016 | EQT PROD CO | Produced Fluid | 55.25 Bbl | RESIDUAL WASTE PROCESSING FACILITY | 2014-541 |
2016 | EQT PROD CO | Fracturing Fluid Waste | 75.00 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2016 | EQT PROD CO | Produced Fluid | 410.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW019 |
2016 | EQT PROD CO | Produced Fluid | 310.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW001 |
2016 | EQT PROD CO | Fracturing Fluid Waste | 33.61 Tons | LANDFILL | 100277 |
2016 | EQT PROD CO | Servicing Fluid | 100.00 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123SW005 |
2016 | EQT PROD CO | Synthetic Liner Materials | 6.96 Tons | LANDFILL | SWF 1032-WV0109 |
2016 | EQT PROD CO | Drill Cuttings | 4,125.97 Tons | LANDFILL | 100419 |
2016 | EQT PROD CO | Other Oil & Gas Wastes | 15.50 Tons | LANDFILL | 100419 |
2016 | EQT PROD CO | Produced Fluid | 93,848.00 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2016 | EQT PROD CO | Produced Fluid | 43.60 Bbl | LANDFILL | 100277 |
2017 | EQT PROD CO | Synthetic Liner Materials | 15.97 Tons | LANDFILL | 100419 |
2017 | EQT PROD CO | Produced Fluid | 260.00 Bbl | REUSE AT A WELL PAD OUTSIDE PENNSYLVANIA | |
2017 | EQT PROD CO | Other Oil & Gas Wastes | 1,100.00 Bbl | REUSE (AT WELL PAD) | |
2017 | EQT PROD CO | Other Oil & Gas Wastes | 30.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW005 |
2017 | EQT PROD CO | Drilling Fluid Waste | 260.00 Bbl | REUSE (AT WELL PAD) | |
2017 | EQT PROD CO | Produced Fluid | 1,755.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW005 |
2017 | EQT PROD CO | Produced Fluid | 195.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | |
2017 | EQT PROD CO | Produced Fluid | 6,240.00 Bbl | REUSE (AT WELL PAD) | |
2018 | EQT PROD CO | Other Oil & Gas Wastes | 890.73 Bbl | REUSE (AT WELL PAD) | |
2018 | EQT PROD CO | Produced Fluid | 24.35 Tons | RESIDUAL WASTE PROCESSING FACILITY | ODNR 2015-511 |
2018 | EQT PROD CO | Produced Fluid | 134.37 Bbl | REUSE (AT WELL PAD) | |
2018 | EQT PROD CO | Other Oil & Gas Wastes | 78.29 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW005 |
2018 | EQT PROD CO | Other Oil & Gas Wastes | 9.69 Tons | LANDFILL | 100419 |
2018 | EQT PROD CO | Produced Fluid | 914.33 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW005 |
2018 | EQT PROD CO | Synthetic Liner Materials | 32.19 Tons | LANDFILL | 100419 |
2019 | EQT PROD CO | Produced Fluid | 29.15 Bbl | SURFACE IMPOUNDMENT | 95-7-37312-19 |
2019 | EQT PROD CO | Other Oil & Gas Wastes | 52.58 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW005 |
2019 | EQT PROD CO | Synthetic Liner Materials | 31.71 Tons | LANDFILL | 100419 |
2019 | EQT PROD CO | Other Oil & Gas Wastes | 7.86 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW019 |
2019 | EQT PROD CO | Produced Fluid | 12.15 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW005 |
2019 | EQT PROD CO | Other Oil & Gas Wastes | 262.15 Bbl | REUSE (AT WELL PAD) | |
2019 | EQT PROD CO | Produced Fluid | 159.27 Bbl | REUSE (AT WELL PAD) | |
2019 | EQT PROD CO | Other Oil & Gas Wastes | 8.78 Tons | LANDFILL | 100419 |
2019 | EQT PROD CO | Produced Fluid | 0.95 Bbl | REUSE AT A WELL PAD OUTSIDE PENNSYLVANIA | |
2019 | EQT PROD CO | Produced Fluid | 95.93 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW010 |
For data sources see[8]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
2444071 | Primary Facility | 2015-12-18 | Drilling/Alteration | No Violations Noted | Horizontal Utica, Setting 30" Conductor @ 80' KB (12/18/2016). |
2444081 | Primary Facility | 2016-01-15 | Drilling/Alteration | No Violations Noted | Horizontal Utica, Drilling on air @ 556' (TD). Setting Water Protection Casing and cementing today (1/15/2016). |
2444104 | Primary Facility | 2016-01-22 | Drilling/Alteration | No Violations Noted | Horizontal Utica, Drilling on fluid @ 2438' (TD). Setting Coal Protection Casing / Intermediate Casing and cementing today (1/22/2016). Included is CBL log of isolation packer of 13/5/8"casing. |
2444115 | Primary Facility | 2016-02-03 | Drilling/Alteration | No Violations Noted | Horizontal Utica, Drilling on fluid @ 6068' today. |
2449037 | Primary Facility | 2016-02-02 | Drilling/Alteration | No Violations Noted | Horizontal Utica, Drilling on air @ 9254 ' today. Drill pipe twisted off in well bore. Trying to fish pipe out. This is 2nd day of fishing pipe.Future plans are to cement a plug and side track around stuck pipe. Leaving 120' of drill pipe in hole. |
2449045 | Primary Facility | 2016-02-09 | Drilling/Alteration | No Violations Noted | Horizontal Utica, Drilling on air @ 9933 ' today. Slow drilling due to difficult formation. |
2452034 | Primary Facility | 2016-02-22 | Drilling/Alteration | No Violations Noted | Horizontal Utica, Drilling on air @ 12,200 ' today. Cleaning well bore rigging down. Planning to switch rig to Orion. |
2478796 | Primary Facility | 2016-03-18 | Drilling/Alteration | No Violations Noted | Horizontal Utica, Orion # 18 started moving on today (3/18/2016). |
2478802 | Primary Facility | 2016-03-27 | Drilling/Alteration | No Violations Noted | Horizontal Utica, Orion # 18 drilling on fluid @ 20,834 (TD). Running 51/2" Prod.Casing and cementing tonight. |
2809927 | Primary Facility | 2018-11-26 | Incident- Response to Accident or Event | In Compliance with Policy | On 11/22/18 at approximately 0952 David Guidas of EQT reported an impaired water spill on the Shipman well pad.
On 11/26/18 at approximately 1200 hours I conducted an incident response inspection. I spoke via phone with David Guidas who indicated 10 gallons of produced fluid was spilled when a line containing impaired water was removed from a frac tank. Due to teardown activities at the site the secondary containment had a hole that allowed the fluid to reach the ground surface. The spill was remediated by SPSI. The spill has been addressed in compliance with DEP spill policy. |
For data sources see[9]