If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 37-059-27157 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":39.886358,"lon":-80.335792,"icon":""}]} |
| Country: United States | |
| State: Pennsylvania | |
| County: Greene | |
| Municipality: Center Township | |
| Operator Name: EQT PROD CO | |
| Well Pad ID: 144796 | |
| Farm/Lease Name: CARPENTER 590610 | |
| License Status: Inactive | |
| Spud Date: 2016-11-14 | |
| Permit Date: 2016-10-28 | |
| Well Type: GAS | |
| Unconventional Well: Y | |
| Configuration: Horizontal Well | |
| Conservation: No | |
| Latitude: 39.886358 | |
| Longitude: -80.335792 |
| Date | Event |
|---|---|
| 2016-10-28 | New Permit Application |
| 2016-11-05 | Performed Spud Operation |
| 2016-12-17 | Drilling Completion |
| 2017-05-04 | MOD |
| 2017-11-14 | Inactive Well Request Granted |
| 2018-02-20 | MOD |
| 2018-09-27 | Newly Drilled |
For data sources see[4]
| Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
|---|---|---|---|---|---|
| 1 | 2018-12-23 | 2019-01-28 | 7,865 | 31,325,600 | 0 |
| Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
|---|---|---|---|---|---|---|---|---|
| 1 | Methanol | 67-56-1 | 90 | 0.000167589 | 509.918 | |||
| 2,2,4-trimethylpentane-1,3-diol monoisobutyrate | 25265-77-4 | 7 | 0.00008306 | 252.721 | ||||
| Methanol | 67-56-1 | 90 | 0.000167589 | 509.918 | ||||
| Didecyl dimethyl ammonium chloride | 7173-51-5 | 3 | 0.000393088 | 1196.04 | ||||
| Copolymer of 2-propenamide | Proprietary | 30 | 0.00757951 | 23062 | ||||
| Ethoxylated alcohols (12-18) | 68213-23-0 | 3 | 0.00142344 | 4331.06 | ||||
| Alcohols, C7-ISO, C8-RICH | 68526-83-0 | 5 | 0.00000931 | 28.329 | ||||
| Copolymer of 2-propenamide | Proprietary | 30 | 0.00757951 | 23062 | ||||
| Citric Acid | 77-92-9 | 100 | 0.000377883 | 1149.77 | ||||
| Formaldehyde | 50-00-0 | 100 | 0.00922076 | 28055.8 | ||||
| Citric Acid | 77-92-9 | 100 | 0.000377883 | 1149.77 | ||||
| Butene, homopolymer | 9003-29-6 | 25 | 0.011862 | 36092.1 | ||||
| Ammonium chloride ((NH4)Cl) | 12125-02-9 | 1 | 0.00025265 | 768.732 | ||||
| Alkyl dimethyl benzyl ammonium chloride | 68391-01-5 | 3 | 0.000393088 | 1196.04 | ||||
| ethylbenzene | 100-41-4 | 1 | 0.00000186 | 5.666 | ||||
| Propapgyl Alcohol | 107-19-7 | 5 | 0.00000931 | 28.329 | ||||
| Butene, homopolymer | 9003-29-6 | 25 | 0.011862 | 36092.1 | ||||
| Petroleum Distillate | 64742-47-8 | 20 | 0.005053 | 15374.6 | ||||
| Alcohols, C12-16, ethoxylated | 68551-12-2 | 2 | 0.0005053 | 1537.46 | ||||
| Alkanes, C16-20-iso- | Proprietary | 25 | 0.011862 | 36092.1 | ||||
| Ammonium chloride ((NH4)Cl) | 12125-02-9 | 1 | 0.00025265 | 768.732 | ||||
| Isopropanol | 67-63-0 | 5 | 0.00000931 | 28.329 | ||||
| Isopropanol | 67-63-0 | 5 | 0.00000931 | 28.329 | ||||
| Silica Substrate | 14808-60-7 | 100 | 13.883 | 42,241,600.0 | ||||
| Alcohols, C7-ISO, C8-RICH | 68526-83-0 | 5 | 0.00000931 | 28.329 | ||||
| Non-hazardous substances | Proprietary | 90 | 0.0117926 | 35881.2 | ||||
| Glutaraldehyde | 111-30-8 | 20 | 0.00262059 | 7973.6 | ||||
| Xylene | 1330-20-7 | 5 | 0.00000931 | 28.329 | ||||
| Hydrochloric Acid | 7647-01-0 | 15 | 0.0157257 | 47848 | ||||
| Propapgyl Alcohol | 107-19-7 | 5 | 0.00000931 | 28.329 | ||||
| Petroleum Distillate | 64742-47-8 | 20 | 0.005053 | 15374.6 | ||||
| Alkanes, C16-20-iso- | Proprietary | 25 | 0.011862 | 36092.1 | ||||
| Alcohols, C12-16, ethoxylated | 68551-12-2 | 2 | 0.0005053 | 1537.46 | ||||
| Oleic Acid Diethanolamide | 93-83-4 | 2 | 0.0005053 | 1537.46 | ||||
| Xylene | 1330-20-7 | 5 | 0.00000931 | 28.329 | ||||
| Benzenesulfonic acid, dodecyl-, compound with 2-aminoehtanol (1:1) |
26836-07-7 | 7 | 0.00008306 | 252.721 | ||||
| ethylbenzene | 100-41-4 | 1 | 0.00000186 | 5.666 | ||||
| Ethoxylated alcohols (12-18) | 68213-23-0 | 3 | 0.00142344 | 4331.06 | ||||
| Oleic Acid Diethanolamide | 93-83-4 | 2 | 0.0005053 | 1537.46 | ||||
| Imidazoline | 61790-69-0 | 5 | 0.00000931 | 28.329 | ||||
| Imidazoline | 61790-69-0 | 5 | 0.00000931 | 28.329 | ||||
| Water | ProFrac | Carrier/Base Fluid | Water | 7732-18-5 | 100 | 85.9153 | 261,412,000.0 | |
| Clearal 268 | ChemStream | Biocide | Listed Below | |||||
| Sand (Proppant) | EQT | Proppant | Listed Below | |||||
| Other Chemical(s) | Listed Above | See Trade Name(s) List | Listed Below | |||||
| DireCT | NewPark Drilling Fluids | Pipe On Pipe | Listed Below | |||||
| ProChek 100 | ProFrac | Scale Inhibitor | Listed Below | |||||
| ProSlick 700 | ProFrac | Friction Reducer | Listed Below | |||||
| ProFE 105 | ProFrac | Acid Chelating Agent | Listed Below | |||||
| ProHib 100 | ProFrac | Acid Corrosion Inhibitor | Listed Below | |||||
| Hydrochloric Acid (15%) | ProFrac | Acidizing | Listed Below | |||||
| ProSlick 710 | ProFrac | Friction Reducer | Listed Below |
For data sources see[5]
| Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
|---|---|---|---|---|---|---|---|
| 2016 | EQT PROD CO | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
| 2017 | EQT PROD CO | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
| 2019 | EQT PROD CO | 8,681,820.00 | 240 | 0.00 | 0 | 0.00 | 0 |
For data sources see[6]
| Period | Operator | Waste Type | Quantity | Disposal Method | Waste Facility ID |
|---|---|---|---|---|---|
| 2016 | EQT PROD CO | Drill Cuttings | 448.93 Tons | LANDFILL | 100419 |
| 2017 | EQT PROD CO | Other Oil & Gas Wastes | 240.00 Bbl | REUSE (AT WELL PAD) | |
| 2018 | EQT PROD CO | Drill Cuttings | 1,542.58 Tons | LANDFILL | 100172 |
| 2018 | EQT PROD CO | Drill Cuttings | 972.36 Tons | LANDFILL | 06-08438 |
| 2018 | EQT PROD CO | Synthetic Liner Materials | 7.26 Tons | LANDFILL | 100419 |
| 2018 | EQT PROD CO | Other Oil & Gas Wastes | 7.80 Tons | LANDFILL | 100419 |
| 2018 | EQT PROD CO | Other Oil & Gas Wastes | 8.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW019 |
| 2018 | EQT PROD CO | Other Oil & Gas Wastes | 125.50 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW005 |
| 2018 | EQT PROD CO | Produced Fluid | 7.72 Tons | RESIDUAL WASTE PROCESSING FACILITY | 2014-541 |
| 2018 | EQT PROD CO | Other Oil & Gas Wastes | 14.96 Tons | LANDFILL | 100172 |
| 2018 | EQT PROD CO | Other Oil & Gas Wastes | 191.50 Bbl | REUSE (AT WELL PAD) | |
| 2018 | EQT PROD CO | Drilling Fluid Waste | 1,040.00 Bbl | REUSE (AT WELL PAD) | |
| 2018 | EQT PROD CO | Drill Cuttings | 13.24 Tons | LANDFILL | 100277 |
| 2019 | EQT PROD CO | Produced Fluid | 514.58 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW005 |
| 2019 | EQT PROD CO | Produced Fluid | 1,533.52 Bbl | SURFACE IMPOUNDMENT | 95-7-37312-19 |
| 2019 | EQT PROD CO | Produced Fluid | 5,201.72 Bbl | REUSE (AT WELL PAD) | |
| 2019 | EQT PROD CO | Other Oil & Gas Wastes | 165.50 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW005 |
| 2019 | EQT PROD CO | Other Oil & Gas Wastes | 6.47 Tons | LANDFILL | 100419 |
| 2019 | EQT PROD CO | Other Oil & Gas Wastes | 12.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | |
| 2019 | EQT PROD CO | Produced Fluid | 119.68 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW019 |
| 2019 | EQT PROD CO | Filter Socks | 0.15 Tons | RESIDUAL WASTE PROCESSING FACILITY | 301280 |
| 2019 | EQT PROD CO | Other Oil & Gas Wastes | 83.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | N/A |
| 2019 | EQT PROD CO | Other Oil & Gas Wastes | 46.00 Bbl | SURFACE IMPOUNDMENT | 95-7-37312-19 |
| 2019 | EQT PROD CO | Synthetic Liner Materials | 13.87 Tons | REUSE (AT WELL PAD) | |
| 2019 | EQT PROD CO | Produced Fluid | 35.39 Tons | RESIDUAL WASTE PROCESSING FACILITY | ODNR 2015-511 |
| 2019 | EQT PROD CO | Other Oil & Gas Wastes | 12.00 Bbl | INJECTION DISPOSAL WELL | 2D0859721 |
| 2019 | EQT PROD CO | Other Oil & Gas Wastes | 35.00 Bbl | INJECTION DISPOSAL WELL | 34-105-23619 |
| 2019 | EQT PROD CO | Other Oil & Gas Wastes | 11.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW010 |
| 2019 | EQT PROD CO | Other Oil & Gas Wastes | 633.00 Bbl | REUSE (AT WELL PAD) | |
| 2019 | EQT PROD CO | Unused Fracturing Fluid Waste | 17.24 Tons | INJECTION DISPOSAL WELL | 34-167-29543 |
| 2019 | EQT PROD CO | Produced Fluid | 58.22 Bbl | INJECTION DISPOSAL WELL | 34-157-25511 |
| 2019 | EQT PROD CO | Synthetic Liner Materials | 18.15 Tons | LANDFILL | 100419 |
| 2019 | EQT PROD CO | Produced Fluid | 395.50 Tons | REUSE AT A WELL PAD OUTSIDE PENNSYLVANIA | |
| 2019 | EQT PROD CO | Produced Fluid | 554.08 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW010 |
For data sources see[7]
| Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
|---|---|---|---|---|---|
| 2536025 | Primary Facility | 2016-11-10 | Drilling/Alteration | No Violations Noted | Well spud on 11/5/2016. Operator augered a 30-inch borehole and set 26-inch conductor pipe at 40 ft. Conductor pipe cemented in place. Well cellar installed. |
| 2546875 | Primary Facility | 2016-12-13 | Drilling/Alteration | No Violations Noted | Operator has set and cemented 13 3/8” surface casing. Surface casing was set @ 667’ and was cemented to the surface by the displacement method on 12/11/16. 55 bbls of cement was circulated to the surface. Operator has drilled intermediate borehole section to 2,577’ and is TOOH. Preparing to run casing. Review casing pressure testing procedure with operator. |
| 2550680 | Primary Facility | 2016-12-28 | Drilling/Alteration | No Violations Noted | Surface and intermediate casings have been set and cemented to the surface by the displacement method. Pilot hole drilled to 7,304’ measured depth on 12/17/16. Rig off well. Well capped. |
For data sources see[8]