Well ID: 37-063-37135 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.524617,"lon":-79.198078,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Indiana | |
Municipality: Center Township | |
Operator Name: XTO ENERGY INC | |
Well Pad ID: 148497 | |
Farm/Lease Name: HCPP A 3H | |
License Status: | |
Spud Date: 2011-07-26 | |
Permit Date: 2011-06-23 | |
Well Type: GAS | |
Unconventional Well: Y | |
Configuration: Horizontal Well | |
Conservation: Yes | |
Latitude: 40.524617 | |
Longitude: -79.198078 |
Date | Event |
---|---|
2011-06-23 | New Permit Application |
2011-07-26 | Performed Spud Operation |
2012-01-22 | Drilling Completion |
2012-02-11 | Perforation |
2012-10-19 | DEVIATED |
For data sources see[4]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 2012-04-09 | 2012-04-09 | 8,021 | 4,122,304 | |
2 | 2012-03-19 | 2012-03-19 | 8,021 | 4,122,304 |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | Acid Corrosion Inhibitor - EcoAcid CI | Geosafe Chemicals | Corrosion Inhibitor | Whole Product | ||||
Diethylene glycol monobutyl ether | 112-34-5 | 50.00 | 0.00022000 | |||||
Other -(non hazardous) | 50.00 | 0.00022000 | ||||||
Water | Water | 7732-18-5 | 100.00 | 86.90 | ||||
Sand | Proppant | Quartz | 14808-60-7 | 100.00 | 12.44 | |||
Acid - 7.5 HCl Acid | PPG Industries | Acid | Other -(non hazardous) | 92.50 | 0.54 | |||
Whole Product | ||||||||
Hydrochloric acid | 7647-01-0 | 7.50 | 0.04 | |||||
Biocide - MC 8650 | Multi-Chem Group | Biocide | Whole Product | |||||
Glutaraldehyde | 111-30-8 | 60.00 | 0.00311000 | |||||
Other -(non hazardous) | 40.00 | 0.00207000 | ||||||
Friction Reducer - MC MX-14-5 | Multi-Chem Group | Friction Reducer | Whole Product | |||||
Other -(non hazardous) | 70.00 | 0.02 | ||||||
Distillates, petroleum, hydrotreated light | 64742-47-8 | 30.00 | 0.01 | |||||
Biocide - MC 8520 | Multi-Chem Group | Biocide | 4,4-Dimethyloxazolidine | 51200-87-4 | 95.00 | 0.01 | ||
2-Amino-2-methylpropan-1-ol | 124-68-5 | 0.50 | 0.00006000 | |||||
Whole Product | ||||||||
3,4,4-Trimethyloxazolidine | 75673-43-7 | 4.50 | 0.00054000 | |||||
Scale Inhibitor - MC-MX-588-2 | Multi-Chem Group | Scale Inhibitor | Other -(non hazardous) | 100.00 | 0.00980000 | |||
Whole Product | ||||||||
2 | Friction Reducer - MC MX-14-5 | Multi-Chem Group | Friction Reducer | Distillates, petroleum, hydrotreated light | 64742-47-8 | 30.00 | 0.01 | |
Other -(non hazardous) | 70.00 | 0.02 | ||||||
Biocide - MC 8650 | Multi-Chem Group | Biocide | Other -(non hazardous) | 40.00 | 0.00207000 | |||
Glutaraldehyde | 111-30-8 | 60.00 | 0.00311000 | |||||
Water | Water | 7732-18-5 | 100.00 | 86.90 | ||||
Acid - 7.5 HCl Acid | PPG Industries | Acid | Hydrochloric acid | 7647-01-0 | 7.50 | 0.04 | ||
Other -(non hazardous) | 92.50 | 0.54 | ||||||
Scale Inhibitor - MC-MX-588-2 | Multi-Chem Group | Scale Inhibitor | Other -(non hazardous) | 100.00 | 0.00980000 | |||
Biocide - MC 8520 | Multi-Chem Group | Biocide | 4,4-Dimethyloxazolidine | 51200-87-4 | 95.00 | 0.01 | ||
3,4,4-Trimethyloxazolidine | 75673-43-7 | 4.50 | 0.00054000 | |||||
2-Amino-2-methylpropan-1-ol | 124-68-5 | 0.50 | 0.00006000 | |||||
Sand | Proppant | Quartz | 14808-60-7 | 100.00 | 12.44 | |||
Acid Corrosion Inhibitor - EcoAcid CI | Geosafe Chemicals | Corrosion Inhibitor | Diethylene glycol monobutyl ether | 112-34-5 | 50.00 | 0.00022000 | ||
Other -(non hazardous) | 50.00 | 0.00022000 |
For data sources see[5]
Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
---|---|---|---|---|---|---|---|
2011 | XTO ENERGY INC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2012 | XTO ENERGY INC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2013 | XTO ENERGY INC | 639,455.00 | 365 | 0.00 | 0 | 0.00 | 0 |
2014 | XTO ENERGY INC | 351,035.00 | 365 | 0.00 | 0 | 0.00 | 0 |
2015 | XTO ENERGY INC | 307,687.00 | 363 | 0.00 | 0 | 0.00 | 0 |
2016 | XTO ENERGY INC | 195,986.00 | 338 | 0.00 | 0 | 0.00 | 0 |
2017 | XTO ENERGY INC | 204,967.00 | 342 | 0.00 | 0 | 0.00 | 0 |
2018 | XTO ENERGY INC | 210,952.50 | 356 | 0.00 | 0 | 0.00 | 0 |
2019 | XTO ENERGY INC | 236,369.71 | 363 | 0.00 | 0 | 0.00 | 0 |
For data sources see[6]
Period | Operator | Waste Type | Quantity | Disposal Method | Waste Facility ID |
---|---|---|---|---|---|
2013 | XTO ENERGY INC | Produced Fluid | 198.00 Bbl | CENT WASTE TRT FAC NPDES DISCHARGE | PA0254185 |
2013 | XTO ENERGY INC | Produced Fluid | 824.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0254185 |
2013 | XTO ENERGY INC | Fracing Fluid Waste | 962.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0254185 |
2013 | XTO ENERGY INC | Produced Fluid | 198.00 Bbl | CENT WASTE TRT FAC NPDES | PA0254185 |
2013 | XTO ENERGY INC | Produced Fluid | 91.00 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2013 | XTO ENERGY INC | Produced Fluid | 950.00 Bbl | RESIDUAL WASTE TRANSFER FACILITY | 101674 |
2014 | XTO ENERGY INC | Produced Fluid | 767.00 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NW009 |
2014 | XTO ENERGY INC | Produced Fluid | 212.00 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123SW005 |
2015 | XTO ENERGY INC | Produced Fluid | 200.00 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123SW005 |
2015 | XTO ENERGY INC | Produced Fluid | 742.00 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NW009 |
2016 | XTO ENERGY INC | Produced Fluid | 338.00 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NW009 |
2016 | XTO ENERGY INC | Produced Fluid | 210.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NW009 |
2017 | XTO ENERGY INC | Produced Fluid | 61.00 Bbl | INJECTION DISPOSAL WELL | 34-133-24189 |
2017 | XTO ENERGY INC | Produced Fluid | 454.99 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NW009 |
2018 | XTO ENERGY INC | Produced Fluid | 86.45 Bbl | INJECTION DISPOSAL WELL | 34-133-24096 |
2018 | XTO ENERGY INC | Produced Fluid | 65.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW005 |
2018 | XTO ENERGY INC | Produced Fluid | 502.55 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NW009 |
2019 | XTO ENERGY INC | Produced Fluid | 55.00 Bbl | INJECTION DISPOSAL WELL | 34-133-21076 |
2019 | XTO ENERGY INC | Produced Fluid | 322.00 Bbl | INJECTION DISPOSAL WELL | 34-133-24189 |
2019 | XTO ENERGY INC | Produced Fluid | 63.17 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW005 |
2019 | XTO ENERGY INC | Produced Fluid | 525.19 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NW009 |
For data sources see[7]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
1991777 | Primary Facility | 2011-07-28 | Drilling/Alteration | No Violations Noted | |
2005210 | Primary Facility | 2011-09-20 | Routine/Complete Inspection | No Violations Noted | ID, ES, ESCGP-1, PPC ONSITE. SURFACE PLACED ON WELL, NOT YET COMPLETED ACCORDING TO RECORDS. BMP'S INSTALLED AND FUNCTIONING. NO ACCELERATED ES. NO VIOLATIONS NOTED. ACCOMPANIED BY OGI RICK HOOVER |
2005602 | Primary Facility | 2011-09-20 | Drilling/Alteration | No Violations Noted | |
2011029 | Primary Facility | 2011-10-12 | Routine/Complete Inspection | No Violations Noted | |
2016285 | Primary Facility | 2011-11-02 | Routine/Complete Inspection | No Violations Noted | At the time of inspection, Site ID sign, ESCGP-1, ES Plan, and PPC plan present, but recommend operator replace all and place in ziploc bag(or another waterproof measures) as documents located onsite are wet. Multi Well pad. Access road and pad adequately rocked. Well drilled not yet in production. Secondary containment located on pad beneath rig. UDI 61 Rig currently drilling 8H. No pits onsite, tanks utilized for drilling operations. Closed loop system being utilized, operator plans to remove all wastes (including cuttings) from site and transport to approved facility. Wood chips are being mixed with cuttings prior to final disposal. No IW or accelerated ES issues noted onsite. Bmp's installed and functioning properly. Operator should continue to monitor and maintain all BMPS until final restoration achieved. Company man informed department that area behind well pad is not related to drilling activities, but rather HCPP |
2032457 | Primary Facility | 2012-01-06 | Drilling/Alteration | No Violations Noted | |
2034369 | Primary Facility | 2012-01-12 | Drilling/Alteration | No Violations Noted | |
2036081 | Primary Facility | 2012-01-18 | Drilling/Alteration | No Violations Noted | |
2040021 | Primary Facility | 2012-01-30 | Routine/Complete Inspection | No Violations Noted | nspection result of notification from Stephen Smith of Xto at 930 of possible ES concerns with hillside stability along power plant road.During inspection well drilled, rig off site. Sign ES plan, Escp-1 and PPC plan onsite. Three tanks onsite surrounded by temporary containment. Pad lined with temp containment, actively being disposed of. Production equipment actively being installed. The fill slope at the northern end of pad along power plant road appears to be sliding. At the time of this inspection it does not appear that erosion has occurred outside LOD. Operator has contacted engineer and preliminary plans are to either install rock gabions and/or additional bmp's in order to aid in stabilization of slope. Vegetative matting previously installed also appears to have slid with material along fill slope. Road side ditches and culverts are going to be protected by bmp's in order to prevent a possible pollution event. |
2041939 | Primary Facility | 2012-02-02 | Follow-up Inspection | No Violations Noted | Follow up Inspection result of notification from Stephen Smith of XTO ON 1/30/12 (and inspection) of possible ES concerns with slope stability along power plant road. Field meeting conducted to review written response addressing the slope instability with myself, WQS Marc Maestra, Rick Palmer, and XTO reps Stephen Smith, Dan Rice, as well as XTO's engineer.During this meeting department noted that slope has moved slightly from 1/30/12 inspection. Although it appears that fill material is sliding down northern slope of pad near power plant RD, there again does not appear to be evidence of accelerated erosion and/or sedimentation issues outside of LOD at this time. Location of hillside failure is located near well heads and there is some distance (exacts not avaliable. ~100ft +) btw production equipment and location. Therefore, at this time XTO nor department feel that production equipment will be impacted by the slide and/or remediation efforts.A minor modification to ESCGP-1 shall be submitted to SWRO. XTO agreed to notify department at start. |
2045584 | Primary Facility | 2012-02-23 | Follow-up Inspection | No Violations Noted | Follow up Inspection to examine remediation measures ongoing to address pad slope failure at multi well pad. |
2045798 | Primary Facility | 2012-02-27 | Follow-up Inspection | No Violations Noted | Follow up Inspection to examine remediation measures ongoing to address pad slope failure at multi well pad. At the time of today’s inspection, it appears operator has completed earth disturbance work related to the remediation of slope failure. The slope appears to have been re-grade and tapered to a 2:1 and 3:1 slope. In addition to a rocked lined ditch, swale, diversion pipe, and compos sox; operator installed erosion control mats over slope. Operator plans to seed/mulch areas this week. According to XTO rep Stephen Smith, the construction sequence outlined on January 30, 2012 was followed, except for the installation of a gabion wall. AT this time the operator feels that a gabion wall is not necessary, but operator will continue to closely monitoring the area and if any additional movement is noted a gabion wall will be installed. During inspection, no accelerated ES issues were noted on pad or access road. Department will conduct a follow up inspection to ensure slope failure has been successfully controlled/corrected. |
2046714 | Primary Facility | 2012-02-27 | Drilling/Alteration | No Violations Noted | |
2088611 | Primary Facility | 2012-08-01 | Routine/Complete Inspection | No Violations Noted | Routine inspection. At the time of this inspection, multi-well pad site ID signs, ES plan, and ESCGP-1 present. Department unable to locate drililng permits. |
2109583 | Primary Facility | 2012-10-16 | Routine/Complete Inspection | No Violations Noted | At the time of this inspection, multi-well pad site ID signs, ES plan, and ESCGP-1 present. |
2136121 | Primary Facility | 2013-01-31 | Routine/Complete Inspection | No Violations Noted | Routine inspection. At the time of this inspection, multi-well pad site ID signs, ES plan, and ESCGP-1 present. |
2183588 | Primary Facility | 2013-06-13 | Administrative/File Review | In Compliance with Policy | On-site meeting with XTO rep Dan Rice regarding site restoration. Mr. Rice requested meeting to discuss stabilization and express concerns pertaining to side slope on left side of pad when standing at pad entrance. |
2247635 | Primary Facility | 2014-02-19 | Routine/Partial Inspection | No Violations Noted | Site ID sign present, in compliance with Act 9 standards. ERP on-site. Permit numbers posted. Department recommends Operator remove posted permit numbers for any permits which are no longer valid. |
2489589 | Primary Facility | 2016-05-25 | Routine/Partial Inspection | No Violations Noted | Multi-well pad. At the time of this inspection, well 3H drilled and appears equipped for production. According to records, drilling occurred 7/26/2011-1/20/2012. Well tag present, legible.
Wells 2H, 4H, 8H drilled and appear equipped for production. Fence located around wells. Four on-site brine tanks appear sound, located within a lined, metal secondary containment unit. Access road stabilized. Site ID sign present, in compliance with Act 9 standards. ERP on-site. Inspection conducted with WQS Cindy Witham. |
2502623 | Primary Facility | 2016-07-18 | Routine/Complete Inspection | No Violations Noted | Multi-well Marcellus site. Well appears equipped for production.
At time of inspection site ID sign, well permit, E&S plan, ESCGP, and PPC plan all on site. No E&S issues observed on access road. No E&S issues observed on well pad. Well tag present and legible. Brine tank located in secondary containment appears structurally sound. |
2519648 | Primary Facility | 2016-09-13 | Routine/Complete Inspection | No Violations Noted | Multi-well Marcellus site.
At time of inspection Site ID sign, PPC plan, E&S plan, Well permit, and ESCGP on site. No E&S issues observed on access road. Well pad rocked, no E&S issues observed. It appears well is equipped for production. Well head surrounded by fence. Well tag present and legible. Brine tank located in secondary containment appears structurally sound. The NOT for the ESCGP-1 associated with this well site (ESX09-063-0005) has been approved at the time of this inspection. |
2654779 | Primary Facility | 2017-10-26 | Routine/Complete Inspection | No Violations Noted | Well appears equipped for production.
Well head surrounded by security fence. The NOT for this site was approved on 9-13-16. |
2668721 | Primary Facility | 2017-12-08 | Routine/Complete Inspection | No Violations Noted | |
2761108 | Primary Facility | 2018-08-07 | Routine/Complete Inspection | No Violations Noted | Well appears equipped for production. Well head surrounded by security fence and cement barriers. Four brine tanks located on site. |
For data sources see[8]