If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 37-063-37137 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.524561,"lon":-79.198081,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Indiana | |
Municipality: Center Township | |
Operator Name: XTO ENERGY INC | |
Well Pad ID: 148497 | |
Farm/Lease Name: HCPP A 8H | |
License Status: | |
Spud Date: | |
Permit Date: 2011-06-23 | |
Well Type: GAS | |
Unconventional Well: Y | |
Configuration: Horizontal Well | |
Conservation: Yes | |
Latitude: 40.524561 | |
Longitude: -79.198081 |
Date | Event |
---|---|
2011-06-23 | New Permit Application |
2011-10-23 | Performed Spud Operation |
For data sources see[4]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 2012-03-05 | 2012-03-05 | 8,040 | 2,510,433 |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | Friction Reducer - MC MX-14-5 | Multi-Chem Group | Friction Reducer | |||||
Other -(non hazardous) | 70.00 | 0.03 | ||||||
Distillates, petroleum, hydrotreated light | 64742-47-8 | 30.00 | 0.01 | |||||
Biocide - MC 8520 | Multi-Chem Group | Biocide | 3,4,4-Trimethyloxazolidine | 75673-43-7 | 4.50 | 0.00062000 | ||
4,4-Dimethyloxazolidine | 51200-87-4 | 95.00 | 0.01 | |||||
2-Amino-2-methylpropan-1-ol | 124-68-5 | 0.50 | 0.00007000 | |||||
Acid - 7.5 HCl Acid | PPG Industries | Acid | ||||||
Hydrochloric acid | 7647-01-0 | 7.50 | 0.03 | |||||
Other -(non hazardous) | 92.50 | 0.40 | ||||||
Water | Water | 7732-18-5 | 100.00 | 86.77 | ||||
Biocide - MC 8650 | Multi-Chem Group | Biocide | Other -(non hazardous) | 40.00 | 0.00243000 | |||
Glutaraldehyde | 111-30-8 | 60.00 | 0.00365000 | |||||
Acid Corrosion Inhibitor - EcoAcid CI | Geosafe Chemicals | Corrosion Inhibitor | ||||||
Diethylene glycol monobutyl ether | 112-34-5 | 50.00 | 0.00017000 | |||||
Other -(non hazardous) | 50.00 | 0.00017000 | ||||||
Scale Inhibitor - MC-MX-588-2 | Multi-Chem Group | Scale Inhibitor | Other -(non hazardous) | 100.00 | 0.01 | |||
Sand | Proppant | Quartz | 14808-60-7 | 100.00 | 12.69 |
For data sources see[5]
Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
---|---|---|---|---|---|---|---|
2011 | XTO ENERGY INC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2012 | XTO ENERGY INC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2013 | XTO ENERGY INC | 486,791.00 | 365 | 0.00 | 0 | 0.00 | 0 |
2014 | XTO ENERGY INC | 182,417.00 | 365 | 0.00 | 0 | 0.00 | 0 |
2015 | XTO ENERGY INC | 139,426.00 | 365 | 0.00 | 0 | 0.00 | 0 |
2016 | XTO ENERGY INC | 103,706.00 | 330 | 0.00 | 0 | 0.00 | 0 |
2017 | XTO ENERGY INC | 87,323.00 | 341 | 0.00 | 0 | 0.00 | 0 |
2018 | XTO ENERGY INC | 104,285.45 | 365 | 0.00 | 0 | 0.00 | 0 |
2019 | XTO ENERGY INC | 114,126.25 | 352 | 0.00 | 0 | 0.00 | 0 |
For data sources see[6]
Period | Operator | Waste Type | Quantity | Disposal Method | Waste Facility ID |
---|---|---|---|---|---|
2011 | XTO ENERGY INC | Fracing Fluid Waste | 322.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0254185 |
2013 | XTO ENERGY INC | Produced Fluid | 2,070.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0254185 |
2013 | XTO ENERGY INC | Fracing Fluid Waste | 183.00 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2013 | XTO ENERGY INC | Produced Fluid | 895.00 Bbl | CENT WASTE TRT FAC NPDES DISCHARGE | PA0254185 |
2013 | XTO ENERGY INC | Produced Fluid | 85.00 Bbl | INJECTION DISPOSAL WELL | 34-155-23759 |
2013 | XTO ENERGY INC | Fracing Fluid Waste | 2,218.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0254185 |
2013 | XTO ENERGY INC | Produced Fluid | 895.00 Bbl | CENT WASTE TRT FAC NPDES | PA0254185 |
2013 | XTO ENERGY INC | Produced Fluid | 1,736.00 Bbl | RESIDUAL WASTE TRANSFER FACILITY | 101674 |
2014 | XTO ENERGY INC | Produced Fluid | 1,672.00 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NW009 |
2014 | XTO ENERGY INC | Produced Fluid | 407.00 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123SW005 |
2015 | XTO ENERGY INC | Produced Fluid | 201.00 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123SW005 |
2015 | XTO ENERGY INC | Produced Fluid | 1,969.00 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NW009 |
2016 | XTO ENERGY INC | Produced Fluid | 983.69 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NW009 |
2016 | XTO ENERGY INC | Produced Fluid | 705.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NW009 |
2017 | XTO ENERGY INC | Produced Fluid | 124.09 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW005 |
2017 | XTO ENERGY INC | Produced Fluid | 117.00 Bbl | INJECTION DISPOSAL WELL | 34-133-24189 |
2017 | XTO ENERGY INC | Produced Fluid | 1,024.01 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NW009 |
2018 | XTO ENERGY INC | Produced Fluid | 1,421.90 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NW009 |
2018 | XTO ENERGY INC | Produced Fluid | 98.14 Bbl | INJECTION DISPOSAL WELL | 34-133-24096 |
2018 | XTO ENERGY INC | Produced Fluid | 38.00 Bbl | INJECTION DISPOSAL WELL | 34-133-24189 |
2019 | XTO ENERGY INC | Produced Fluid | 186.00 Bbl | INJECTION DISPOSAL WELL | 34-133-24096 |
2019 | XTO ENERGY INC | Produced Fluid | 412.00 Bbl | INJECTION DISPOSAL WELL | 34-133-24189 |
2019 | XTO ENERGY INC | Produced Fluid | 134.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW005 |
2019 | XTO ENERGY INC | Produced Fluid | 745.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NW009 |
2019 | XTO ENERGY INC | Produced Fluid | 156.00 Bbl | INJECTION DISPOSAL WELL | 34-133-21076 |
For data sources see[7]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
1995773 | Primary Facility | 2011-08-10 | Drilling/Alteration | No Violations Noted | |
2005240 | Primary Facility | 2011-09-20 | Routine/Complete Inspection | No Violations Noted | ID PRESENT. SURFACE SET, NOT YET COMPLETED. NO ACCELERATES ES NOTED. NO VIOLATIONS NOTED. ACCOMPANIED BY OGI RICK HOOVER |
2005601 | Primary Facility | 2011-09-20 | Drilling/Alteration | No Violations Noted | |
2011033 | Primary Facility | 2011-10-12 | Drilling/Alteration | No Violations Noted | |
2015121 | Primary Facility | 2011-10-28 | Drilling/Alteration | No Violations Noted | |
2015141 | Primary Facility | 2011-10-25 | Drilling/Alteration | No Violations Noted | |
2016282 | Primary Facility | 2011-11-02 | Routine/Complete Inspection | No Violations Noted | At the time of inspection, Site ID sign, ESCGP-1, ES Plan, and PPC plan present, but recommend operator replace all and place in ziploc bag(or another waterproof measures) as documents located onsite are wet. Access road and pad adequately rocked. Secondary containment located on pad beneath rig. UDI 61 Rig currently drilling 8H. No pits onsite, tanks utilized for drilling operations. Closed loop system being utilized, operator plans to remove all wastes (including cuttings) from site and transport to approved facility. Wood chips are being mixed with cuttings prior to final disposal. No IW or accelerated ES issues noted onsite. Bmp's installed and functioning properly. Operator should continue to monitor and maintain all BMPS until final restoration achieved. Company man informed department that area behind well pad is not related to drilling activities, but rather HCPP. |
2016916 | Primary Facility | 2011-11-03 | Drilling/Alteration | No Violations Noted | |
2020685 | Primary Facility | 2011-11-16 | Drilling/Alteration | No Violations Noted | |
2040023 | Primary Facility | 2012-01-30 | Routine/Complete Inspection | No Violations Noted | Inspection result of notification from Stephen Smith of Xto at 930 of possible ES concerns with hillside stability along power plant road. |
2041947 | Primary Facility | 2012-02-02 | Follow-up Inspection | No Violations Noted | Follow up Inspection result of notification from Stephen Smith of XTO ON 1/30/12 (and inspection) of possible ES concerns with slope stability along power plant road. Field meeting conducted to review written response addressing the slope instability with myself, WQS Marc Maestra, Rick Palmer, and XTO reps Stephen Smith, Dan Rice, as well as XTO's engineer During this meeting department noted that slope has moved slightly from 1/30/12 inspection. Although it appears that fill material is sliding down northern slope of pad near power plant RD, there again does not appear to be evidence of accelerated erosion and/or sedimentation issues outside of LOD at this time. Location of hillside failure is located near well heads and there is some distance (exacts not avaliable. ~100ft +) btw production equipment and location. Therefore, at this time XTO nor department feel that production equipment will be impacted by the slide and/or remediation efforts. A minor modification to ESCGP-1 shall be submitted to SWRO XTO agreeded to notifiy us at start of work |
2045595 | Primary Facility | 2012-02-23 | Follow-up Inspection | No Violations Noted | Follow up Inspection to examine remediation measures ongoing to address pad slope failure at multi well pad. |
2045806 | Primary Facility | 2012-02-27 | Follow-up Inspection | No Violations Noted | ollow up Inspection to examine remediation measures ongoing to address pad slope failure at multi well pad. At the time of today’s inspection, it appears operator has completed earth disturbance work related to the remediation of slope failure. The slope appears to have been re-grade and tapered to a 2:1 and 3:1 slope. In addition to a rocked lined ditch, swale, diversion pipe, and compos sox; operator installed erosion control mats over slope. Operator plans to seed/mulch areas this week. According to XTO rep Stephen Smith, the construction sequence outlined on January 30, 2012 was followed, except for the installation of a gabion wall. AT this time the operator feels that a gabion wall is not necessary, but operator will continue to closely monitoring the area and if any additional movement is noted a gabion wall will be installed. During inspection, no accelerated ES issues were noted on pad or access road. Department will conduct a follow up inspection to ensure slope failure has been successfully controlled/corrected. |
2046708 | Primary Facility | 2012-02-27 | Drilling/Alteration | No Violations Noted | |
2059518 | Primary Facility | 2012-04-10 | Drilling/Alteration | No Violations Noted | |
2061701 | Primary Facility | 2012-04-16 | Incident- Response to Accident or Event | In Compliance with Policy | Administrative Inspection- Result of report of incident/release at homer city power plant unit A location on 4/8/12 (see attached). Based on operator respsone it appears that spill was properly handled accoridng to existing policy. Department reccomends that operator conitnue to closely mointor and maintain all bmp's and containment areas to ensure adequate preventative measures are maintained. A follow up site inspection will be conducted to ensure that distrubed areas are properly restored. |
2088619 | Primary Facility | 2012-08-01 | Routine/Complete Inspection | No Violations Noted | Routine inspection. At the time of this inspection, multi-well pad site ID signs, ES plan, and ESCGP-1 present. Department unable to locate drililng permits. |
2109574 | Primary Facility | 2012-10-16 | Routine/Complete Inspection | No Violations Noted | At the time of this inspection, multi-well pad site ID signs, ES plan, and ESCGP-1 present. |
2136126 | Primary Facility | 2013-01-31 | Routine/Complete Inspection | No Violations Noted | Routine inspection. At the time of this inspection, multi-well pad site ID signs, ES plan, and ESCGP-1 present. |
2183585 | Primary Facility | 2013-06-13 | Administrative/File Review | In Compliance with Policy | On-site meeting with XTO rep Dan Rice regarding site restoration. Mr. Rice requested meeting to discuss stabilization and express concerns pertaining to side slope on left side of pad when standing at pad entrance. |
2247639 | Primary Facility | 2014-02-19 | Routine/Partial Inspection | No Violations Noted | Site ID sign present, in compliance with Act 9 standards. ERP on-site. Permit numbers posted. Department recommends Operator remove posted permit numbers for any permits which are no longer valid. |
2489598 | Primary Facility | 2016-05-25 | Routine/Partial Inspection | No Violations Noted | Multi-well pad. At the time of this inspection, well 8H drilled and appears equipped for production. According to records, drilling occurred 8/07/2011-11/26/2011. Well tag present, legible.
Wells 2H, 3H, 4H drilled and appear equipped for production. Fence located around wells. Four on-site brine tanks appear sound, located within a lined, metal secondary containment unit. Access road stabilized. Site ID sign present, in compliance with Act 9 standards. ERP on-site. Inspection conducted with WQS Cindy Witham. |
2502627 | Primary Facility | 2016-07-18 | Routine/Complete Inspection | No Violations Noted | Multi-well Marcellus site. Well appears equipped for production.
At time of inspection site ID sign, well permit, E&S plan, ESCGP, and PPC plan all on site. No E&S issues observed on access road. No E&S issues observed on site. Well tag present, legible and affixed in a permanent manner. Brine tank located in secondary containment appears structurally sound. |
2519644 | Primary Facility | 2016-09-13 | Routine/Complete Inspection | No Violations Noted | Multi-well Marcellus site.
At time of inspection Site ID sign, PPC plan, E&S plan, Well permit, and ESCGP on site. No E&S issues observed on access road. Well pad rocked, no E&S issues observed. It appears well is equipped for production. Well head surrounded by fence. Well tag present and legible. Brine tank located in secondary containment appears structurally sound. The NOT for the ESCGP-1 associated with this well site (ESX09-063-0005) has been approved at the time of this inspection. |
2654777 | Primary Facility | 2017-10-26 | Routine/Complete Inspection | No Violations Noted | Well appears equipped for production.
Well head surrounded by security fence. The NOT for this site was terminated on 9-13-16. |
2668716 | Primary Facility | 2017-12-08 | Routine/Complete Inspection | No Violations Noted | |
2761112 | Primary Facility | 2018-08-07 | Routine/Complete Inspection | No Violations Noted | Well appears equipped for production. Well head surrounded by security fence and cement barriers. Four brine tanks located on site. |
For data sources see[8]