If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 37-063-37308 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.860836,"lon":-79.078464,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Indiana | |
Municipality: North Mahoning Township | |
Operator Name: XTO ENERGY INC | |
Well Pad ID: 147685 | |
Farm/Lease Name: A K STEAR A UNIT 1H | |
License Status: | |
Spud Date: 2012-05-24 | |
Permit Date: 2012-01-04 | |
Well Type: GAS | |
Unconventional Well: Y | |
Configuration: Horizontal Well | |
Conservation: No | |
Latitude: 40.860836 | |
Longitude: -79.078464 |
Date | Event |
---|---|
2012-01-04 | New Permit Application |
2012-05-22 | Performed Spud Operation |
2012-07-09 | Drilling Completion |
2012-08-16 | Perforation |
2013-01-15 | DEVIATED |
For data sources see[4]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 2012-10-18 | 2012-10-18 | 7,274 | 4,893,933 |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | Water | Water | 7732-18-5 | 100.00 | 87.89 | |||
Sand | Proppant | Quartz | 14808-60-7 | 100.00 | 11.12 | |||
Acid - 7.5 HCl Acid | PPG Industries | Acid | ||||||
Hydrochloric acid | 7647-01-0 | 7.50 | 0.02 | |||||
Other -(non hazardous) | 92.50 | 0.36 | ||||||
Acid Corrosion Inhibitor - EcoAcid CI | Geosafe Chemicals | Corrosion Inhibitor | ||||||
Diethylene glycol monobutyl ether | 112-34-5 | 50.00 | 0.00042000 | |||||
Other -(non hazardous) | 50.00 | 0.00042000 | ||||||
Scale Inhibitor - MC-MX-588-2 | Multi-Chem Group | Scale Inhibitor | Other -(non hazardous) | 100.00 | 0.02 | |||
Biocide - MC 8650 | Multi-Chem Group | Biocide | ||||||
Other -(non hazardous) | 40.00 | 0.00210000 | ||||||
Glutaraldehyde | 111-30-8 | 60.00 | 0.00320000 | |||||
Friction Reducer - MC MX-14-5 | Multi-Chem Group | Friction Reducer | Distillates, petroleum, hydrotreated light | 64742-47-8 | 30.00 | 0.01 | ||
Other -(non hazardous) | 70.00 | 0.03 | ||||||
Acid - 15 HCl Acid | PPG Industries | Acid | ||||||
Hydrochloric acid | 7647-01-0 | 15.00 | 0.07 | |||||
Other -(non hazardous) | 85.00 | 0.41 | ||||||
Biocide - MC 8520 | Multi-Chem Group | Biocide | ||||||
4,4-Dimethyloxazolidine | 51200-87-4 | 95.00 | 0.01 | |||||
3,4,4-Trimethyloxazolidine | 75673-43-7 | 4.50 | 0.00054000 | |||||
2-Amino-2-methylpropan-1-ol | 124-68-5 | 0.50 | 0.00006000 | |||||
Clay Stabilizer - ClaChek G (Bio-Add 1200) | Shrieve | Clay Stabilizer | Not hazardous | 70.00 | 0.01 | |||
Water | 7732-18-5 | 30.00 | 0.00218000 | |||||
For data sources see[5]
Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
---|---|---|---|---|---|---|---|
2012 | XTO ENERGY INC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2013 | XTO ENERGY INC | 583,425.00 | 364 | 0.00 | 0 | 0.00 | 0 |
2014 | XTO ENERGY INC | 446,343.00 | 365 | 0.00 | 0 | 0.00 | 0 |
2015 | XTO ENERGY INC | 323,787.00 | 365 | 0.00 | 0 | 0.00 | 0 |
2016 | XTO ENERGY INC | 252,608.00 | 362 | 0.00 | 0 | 0.00 | 0 |
2017 | XTO ENERGY INC | 212,500.00 | 364 | 0.00 | 0 | 0.00 | 0 |
2018 | XTO ENERGY INC | 210,281.84 | 365 | 0.00 | 0 | 0.00 | 0 |
2019 | XTO ENERGY INC | 182,672.76 | 365 | 0.00 | 0 | 0.00 | 0 |
For data sources see[6]
Period | Operator | Waste Type | Quantity | Disposal Method | Waste Facility ID |
---|---|---|---|---|---|
2012 | XTO ENERGY INC | Drill Cuttings | 777.75 Tons | LANDFILL | 101397 |
2012 | XTO ENERGY INC | Drill Cuttings | 359.95 Tons | LANDFILL | 100434 |
2013 | XTO ENERGY INC | Fracing Fluid Waste | 270.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | 101674 |
2013 | XTO ENERGY INC | Produced Fluid | 5,698.00 Bbl | RESIDUAL WASTE TRANSFER FACILITY | 101674 |
2013 | XTO ENERGY INC | Produced Fluid | 345.00 Bbl | INJECTION DISPOSAL WELL | 34-059-24067 |
2013 | XTO ENERGY INC | Fracing Fluid Waste | 65.00 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2013 | XTO ENERGY INC | Produced Fluid | 100.00 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NW009 |
2013 | XTO ENERGY INC | Produced Fluid | 1,665.00 Bbl | CENT WASTE TRT FAC NPDES | PA0254185 |
2013 | XTO ENERGY INC | Fracturing Fluid Waste | 187.67 Tons | LANDFILL | 100434 |
2013 | XTO ENERGY INC | Produced Fluid | 1,665.00 Bbl | CENT WASTE TRT FAC NPDES DISCHARGE | PA0254185 |
2013 | XTO ENERGY INC | Fracing Fluid Waste | 366.00 Bbl | INJECTION DISPOSAL WELL | 34-133-24189 |
2014 | XTO ENERGY INC | Produced Fluid | 713.00 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123SW005 |
2014 | XTO ENERGY INC | Produced Fluid | 5,192.00 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NW009 |
2014 | XTO ENERGY INC | Produced Fluid | 200.00 Bbl | CENT WASTE TRT FAC NPDES | PA0254185 |
2014 | XTO ENERGY INC | Produced Fluid | 200.00 Bbl | CENT WASTE TRT FAC NPDES DISCHARGE | PA0254185 |
2015 | XTO ENERGY INC | Produced Fluid | 100.00 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123SW005 |
2015 | XTO ENERGY INC | Produced Fluid | 3,690.00 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NW009 |
2016 | XTO ENERGY INC | Produced Fluid | 1,233.00 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NW009 |
2016 | XTO ENERGY INC | Produced Fluid | 35.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW005 |
2016 | XTO ENERGY INC | Produced Fluid | 975.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NW009 |
2017 | XTO ENERGY INC | Produced Fluid | 180.00 Bbl | REUSE (AT WELL PAD) | |
2017 | XTO ENERGY INC | Produced Fluid | 1,552.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NW009 |
2018 | XTO ENERGY INC | Produced Fluid | 203.00 Bbl | REUSE (AT WELL PAD) | |
2018 | XTO ENERGY INC | Produced Fluid | 80.00 Bbl | INJECTION DISPOSAL WELL | 34-133-24096 |
2018 | XTO ENERGY INC | Produced Fluid | 1,888.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NW009 |
2019 | XTO ENERGY INC | Produced Fluid | 105.83 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW005 |
2019 | XTO ENERGY INC | Produced Fluid | 93.00 Bbl | INJECTION DISPOSAL WELL | 34-133-24189 |
2019 | XTO ENERGY INC | Produced Fluid | 877.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NW009 |
2019 | XTO ENERGY INC | Produced Fluid | 93.00 Bbl | INJECTION DISPOSAL WELL | 34-133-21076 |
2019 | XTO ENERGY INC | Produced Fluid | 100.00 Bbl | REUSE (AT WELL PAD) |
For data sources see[7]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
2064199 | Primary Facility | 2012-05-01 | Routine/Complete Inspection | In Compliance with Policy | Pre-construction meeting, for multi-well pad, with XTO Reps Dan Rice (Construction) and Tom Burnett (EHS) and First Class Energy (Construction Contractor). Well permit issued 1/4/12. Proper signage and ES plans located onsite. Reviewed ES plans and construction sequence with individual’s onsite. |
2071248 | Primary Facility | 2012-05-25 | Drilling/Alteration | No Violations Noted | |
2073673 | Primary Facility | 2012-06-05 | Routine/Complete Inspection | No Violations Noted | During this inspection, XTO rep Tom Baun and First Class Energy Rep( Construction Contractor) present. Site ID sign, ES plan, ESCGP-1 located onsite. Rig currently tore down, it is believed top hole drilled. Spud 5/22/12. minor changes have been noted on ES plan, the addition of a rock lined culvert along access road to well site and removal of culvert (per Penn Dot due to drainage on SR 410). Previously disturbed areas covered with matting and seeded/mulched with observed growth not quit 70% uniform coverage. Pad adequately rocked. No accelerated E&S issues on well pad. Temporary containment located onsite beneath former location of rig, appears sound. XTO reps and myself examined access road leading to a impoundment, not yet constructed. A culvert was installed and a sediment basin, it appears that due to grade and recent heavy rains the sediment basin could not handle flow; therefore, XTO would like to install a water bar leading to culvert located down gradient near well pad entrance. Dept ok'ed no increase in acerage or distrubed area- |
2081473 | Primary Facility | 2012-07-06 | Drilling/Alteration | No Violations Noted | |
2086444 | Primary Facility | 2012-07-17 | Drilling/Alteration | No Violations Noted | |
2089278 | Primary Facility | 2012-07-31 | Drilling/Alteration | No Violations Noted | |
2092834 | Primary Facility | 2012-08-16 | Routine/Complete Inspection | No Violations Noted | *Well site located within special protection water* |
2092962 | Primary Facility | 2012-08-18 | Drilling/Alteration | No Violations Noted | |
2101744 | Primary Facility | 2012-09-20 | Drilling/Alteration | No Violations Noted | |
2108412 | Primary Facility | 2012-10-15 | Routine/Complete Inspection | No Violations Noted | At the time of this inspection wells actively being fraced. Bmp's installed and maintained, noaccelerated erosion or sedimentation concerns noted on access road or well site. Hence well site is located with HQ waters, department reiterated to operator that deflectors are not considered ABACT bmp's and in order to sustain sufficient sediment removal an additoinal ABACT bmp is reccomended, department referred operator to currentl ES manual for list of acceptable ABACT bmp's. Operator agreed to install water delfector in access road, as well as add additional compost sox in order to increase the effiencety of sediment removal. Based on this inspection, if operator installs/maintains additonal bmp's as outlined in ES manual and revised plans department shall ok minor changes as noted. |
2109417 | Primary Facility | 2012-10-18 | Drilling/Alteration | No Violations Noted | |
2128914 | Primary Facility | 2013-01-08 | Routine/Complete Inspection | No Violations Noted | Access road entrance adequately rocked, although due to recent thaw and contiual traffic on/off site is reccomended that operator closely monitor and maintain access roadway as needed to ensure that mud does not exit the well site onto SR 210. Well drillled and equipped for prodcution. Well head surrounded by wire fence, recommend operator install a visible, permanent well tag on well head as per regulation. Prodcution equipment contained with in a metal containment unit. Brine tank appears sound. No evidence of Industrail waste concerns. Site snow covered; therefore, unable to adequately assess temporary stablization measures and temporary bmp functioning capacity. Although no accelerated erosion or sedimeantion issues observed. Department recommends that operator install a temp bmp beneath soil pile located on back side of well pad in order to prevent a potentail pollution event as a result of recent thaw, piles appears to be frozen. No violations noted at time of this inspection |
2137936 | Primary Facility | 2013-02-07 | Routine/Complete Inspection | No Violations Noted | |
2168010 | Primary Facility | 2013-05-03 | Routine/Complete Inspection | No Violations Noted | Inspt in response to restoration extension request. |
2222610 | Primary Facility | 2013-11-18 | Routine/Complete Inspection | No Violations Noted | At time of inspection, well equipped for production. Spud date was 5/22/2012. Wellhead surrounded by chain-link fence and cement barriers. Well tag present, legible. |
2248812 | Primary Facility | 2014-02-26 | Routine/Partial Inspection | No Violations Noted | RTPT. At time of inspection, well equipped for production. According to records, drilling occurred 5/24/2012-7/8/2012. Wellhead surrounded by chain-link fence and cement barriers. Well tag present, legible. |
2320022 | Primary Facility | 2014-11-04 | Routine/Complete Inspection | No Violations Noted | Marcellus.Well drilled and equipped for production.Drilling occurred 5/24/2012-7/8/2012.Wellhead surrounded by chain-link fence and cement barriers.WT present, legible.One BT appears sound, located in lined secondary metal containment unit with gravel base.Site ID sign present, in compliance with Act 9 standards.Permit numbers posted.ERP, PPCP, E&S/PCSM plans, ESCGP-1 present at AR entrance.AR in good condition, entrance paved as per E&S plan.Pad stable.Well site stabilized with uniform and adequate vegetative growth.BMPs appear maintained and functioning properly.No accelerated E&S issues noted in relation to well site.Dept recommends Opr install additional rock and/or another alternative stabilization measure at outlet of first water deflector/inlet of second AR culvert as entering well site, continue to monitor and maintain BMPs, and remove any posted permit signs for any permits which have expired.Extension for site restoration previously granted until April 8, 2015 (inspection record 2168010). |
2370272 | Primary Facility | 2015-05-06 | Site Restoration | Violation(s) Noted | Marcellus.At time of inspt, well drilled,appears equipped for production.Drilling occurred 5/24/12-7/8/12.WH surrounded by chain-link fence,cement barriers.WT present, legible.BT located in lined secondary metal containment unit,gravel base,appears sound.Site ID sign present, in compliance with Act 9.ERP, PPCP, E&S/PCSM plans, ESCGP-1 on-site.Dept recom’ds Opr install add’l rock and/or another alternative stabilization measure at outlet of first water deflector/inlet of second AR culvert as entering well site, continue to monitor/maintain all BMPs, and re-seed/mulch fill slopes to ensure permanent stabilization is maintained.Extension for site restoration previously granted until 4/8/15 (inspection record 2168010).Appears infiltration berm recently installed and/or maintained.At this time, areas surrounding infiltration berm not yet exhibiting >70% uniform and adequate veg growth.Temp BMPs installed down-gradient of infiltration berm.As site is not yet restored as per current regs, viols issued under 3216 & 102.22 for failure to restore well site. |
2394752 | Primary Facility | 2015-07-27 | Compliance Evaluation | No Violations Noted | On-site CEI conducted in response to violations issued under inspection record 2370272 (enf ID 323276) for failure to restore well site. |
2395452 | Primary Facility | 2015-07-27 | Site Restoration | No Violations Noted | Restr inspt.Marcellus.At time of inspt, well drilled and appears equipped for production.According to records, drilling occurred 5/24/2012-7/8/2012.Wellhead surrounded by chain-link fence and cement barriers.WT present, legible.BT located in lined secondary metal containment unit with gravel base, appears sound.Site ID sign present, in compliance with Act 9 standards.Permit numbers posted. ERP, PPCP, MSDS sheets, E&S/PCSM plans, ESCGP-1 present at AR entrance.AR in good condition, entrance paved as per E&S plan.Pad stabilized with gravel.Extension for site restoration previously granted until April 8, 2015 (inspection record 2168010).At this time, well site is permanently stabilized with >70% uniform and adequate vegetative growth.PCSM BMPs appear implemented per PCSM plan.Final restoration achieved.Dept recommends Opr cont’ to monitor and maintain all PCSM BMPs, well site, and access road as necessary in order to prevent any potential pollution events from occurring. |
2484886 | Primary Facility | 2016-05-16 | Routine/Complete Inspection | No Violations Noted | 5/16/2016 - Annulus closed, produced fluids tank diked.. |
2683575 | Primary Facility | 2018-01-18 | Routine/Partial Inspection | No Violations Noted | At time of inspection, well drilled and appears equipped for production. |
2826152 | Primary Facility | 2019-01-11 | Routine/Complete Inspection | No Violations Noted | On 1/11/19 at 0858 hrs., I conducted a routine inspection of XTO Energy, Inc.'s A. K. Stear A Unit 1H well (API 063-37308) in North Mahoning Twp., Indiana Co. Snow cover prevented proper evaluation of site stabilization. The pad appears to be restored and permanently stabilized. The well is properly labeled and equipped for production. A well tag is present at the well head. Site Id signs and necessary permits are posted at the site entrance. The production fluid tank is located within adequate secondary containment. There are no violations noted for this inspection. |
Inspection ID | Violation ID | Violation Date | Date Resolved | Violation Code | Violation Type | Violation Comments |
---|---|---|---|---|---|---|
2370272 | 722948 | 05/06/2015 | 2015-05-06 | OGA3216(A) - WELL SITE RESTORATIONS - GENERAL RULE - Failure to restore disturbed land surface of a well site. | Environmental Health & Safety | |
2370272 | 722957 | 05/06/2015 | 2015-05-06 | 102.22(a) - | Environmental Health & Safety |
Violation ID | Penalty ID | Penalty Code | Penalty Status | Penalty Date | Enforcement Date | Penalty Amount | Amount Collected |
---|---|---|---|---|---|---|---|
722948 | 323276 | NOV - Notice of Violation | Comply/Closed | 2015-07-07 |
For data sources see[8]