If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 37-065-24298 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.014575,"lon":-79.064648,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Jefferson | |
Municipality: Oliver Township | |
Operator Name: DANNIC ENERGY CORP | |
Well Pad ID: | |
Farm/Lease Name: COCHRAN 2 | |
License Status: ACTIVE | |
Spud Date: 1999-09-14 | |
Permit Date: 1999-08-16 | |
Well Type: COMB. OIL&GAS | |
Unconventional Well: N | |
Configuration: Vertical Well | |
Conservation: No | |
Latitude: 41.014575 | |
Longitude: -79.064648 |
Date | Event |
---|---|
1999-08-16 | New Permit Application |
1999-09-15 | Performed Spud Operation |
1999-09-20 | Drilling Completion |
1999-09-30 | Perforation |
2000-01-28 | NEWLY DRILLED |
For data sources see[4]
Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
---|---|---|---|---|---|---|---|
1999 | ARK RESOURCES INC | 6047 | 74 | 0.00 | 0 | 0.00 | 0 |
2000 | ARK RESOURCES INC | 33830 | 366 | 0.00 | 0 | 0.00 | 0 |
2001 | ARK RESOURCES INC | 24684 | 365 | 0.00 | 0 | 0.00 | 0 |
2002 | ARK RESOURCES INC | 16457 | 365 | 0.00 | 0 | 0.00 | 0 |
2003 | ARK RESOURCES INC | 14759 | 365 | 0.00 | 0 | 0.00 | 0 |
2004 | ARK RESOURCES INC | 10760 | 366 | 0.00 | 0 | 0.00 | 0 |
2005 | ARK RESOURCES INC | 9285 | 365 | 0.00 | 0 | 0.00 | 0 |
2006 | ARK RESOURCES INC | 9,000.00 | 365 | 0.00 | 0 | 0.00 | 0 |
2007 | DANNIC ENERGY CORP | 8489.42 | 334 | 0.00 | 0 | 0.00 | 0 |
2008 | DANNIC ENERGY CORP | 9,534.78 | 365 | 0.00 | 0 | 0.00 | 0 |
2009 | DANNIC ENERGY CORP | 8,314.16 | 365 | 0.00 | 0 | 0.00 | 0 |
2010 | DANNIC ENERGY CORP | 8,946.16 | 365 | 0.00 | 0 | 0.00 | 0 |
2011 | DANNIC ENERGY CORP | 5,288.36 | 304 | 0.00 | 0 | 0.00 | 0 |
2012 | DANNIC ENERGY CORP | 5,266.42 | 305 | 0.00 | 0 | 0.00 | 0 |
2013 | DANNIC ENERGY CORP | 545.15 | 304 | 0.00 | 0 | 0.00 | 0 |
2014 | DANNIC ENERGY CORP | 5,023.00 | 304 | 0.00 | 0 | 0.00 | 0 |
2015 | DANNIC ENERGY CORP | 2,903.17 | 183 | 0.00 | 0 | 0.00 | 0 |
2016 | DANNIC ENERGY CORP | 4,525.00 | 366 | 0.00 | 0 | 0.00 | 0 |
2017 | DANNIC ENERGY CORP | 7,149.00 | 365 | 0.00 | 0 | 0.00 | 0 |
2018 | DANNIC ENERGY CORP | 6,505.92 | 365 | 0.00 | 0 | 0.00 | 0 |
2019 | DANNIC ENERGY CORP | 4,597.06 | 365 | 0.00 | 0 | 0.00 | 0 |
For data sources see[5]
Period | Operator | Waste Type | Quantity | Disposal Method | Waste Facility ID |
---|---|---|---|---|---|
2000 | ARK RESOURCES INC | Brine | 215.00 Bbl | Brine or Industrial Waste Treatment Plt | |
2001 | ARK RESOURCES INC | Brine | 115.00 Bbl | Brine or Industrial Waste Treatment Plt | PA0091472 |
2003 | ARK RESOURCES INC | Brine | 100.00 Bbl | Brine or Industrial Waste Treatment Plt | PA0095443 |
2008 | DANNIC ENERGY CORP | Produced Fluid | 40.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0095273 |
2010 | DANNIC ENERGY CORP | Produced Fluid | 81.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0020346 |
2012 | DANNIC ENERGY CORP | Produced Fluid | 80.00 Bbl | PUBLIC SEWAGE TREATMENT PLANT | PA0020346 |
2015 | DANNIC ENERGY CORP | Produced Fluid | 3,360.00 Bbl | CENT WASTE TRT FAC NPDES | PA0095273 |
2015 | DANNIC ENERGY CORP | Produced Fluid | 3,360.00 Bbl | CENT WASTE TRT FAC NPDES DISCHARGE | PA0095273 |
2018 | DANNIC ENERGY CORP | Produced Fluid | 80.00 Bbl | PUBLIC SEWAGE TREATMENT PLANT | PA0028428 |
For data sources see[6]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
884025 | Primary Facility | 1999-09-15 | Drilling/Alteration | No Violations Noted | |
884028 | Primary Facility | 1999-09-16 | Drilling/Alteration | Violation(s) Noted | |
895519 | Primary Facility | 1999-11-17 | Routine/Complete Inspection | No Violations Noted | |
906677 | Primary Facility | 2000-01-05 | Site Restoration | No Violations Noted |
Inspection ID | Violation ID | Violation Date | Date Resolved | Violation Code | Violation Type | Violation Comments |
---|---|---|---|---|---|---|
884028 | 223547 | 09/16/1999 | 1999-09-16 | 79.12 - Inadequate casing/cementing in conservation well | Environmental Health & Safety | Did not wait 8 hr on cement. Responded that they would be good boys in the future |
Violation ID | Penalty ID | Penalty Code | Penalty Status | Penalty Date | Enforcement Date | Penalty Amount | Amount Collected |
---|---|---|---|---|---|---|---|
223547 | 47034 | NOV - Notice of Violation | Comply/Closed | 1999-09-23 |
For data sources see[7]