If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 37-065-25090 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.946957,"lon":-78.887116,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Jefferson | |
Municipality: Gaskill Township | |
Operator Name: HAROLD R ELKIN | |
Well Pad ID: | |
Farm/Lease Name: DEAN 9 | |
License Status: ACTIVE | |
Spud Date: 2004-04-29 | |
Permit Date: 2004-04-14 | |
Well Type: GAS | |
Unconventional Well: N | |
Configuration: Vertical Well | |
Conservation: No | |
Latitude: 40.946957 | |
Longitude: -78.887116 |
Date | Event |
---|---|
2004-04-14 | New Permit Application |
2004-04-29 | Performed Spud Operation |
2004-05-04 | Drilling Completion |
2004-11-17 | Perforation |
2005-03-16 | NEWLY DRILLED |
For data sources see[4]
Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
---|---|---|---|---|---|---|---|
2004 | HAROLD R ELKIN | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2005 | HAROLD R ELKIN | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2006 | HAROLD R ELKIN | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2007 | HAROLD R ELKIN | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2008 | HAROLD R ELKIN | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2009 | HAROLD R ELKIN | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2010 | HAROLD R ELKIN | 2,273.00 | 365 | 0.00 | 0 | 0.00 | 0 |
2011 | HAROLD R ELKIN | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2012 | HAROLD R ELKIN | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2013 | HAROLD R ELKIN | 1,550.00 | 365 | 0.00 | 0 | 0.00 | 0 |
2014 | HAROLD R ELKIN | 1,044.00 | 365 | 0.00 | 0 | 0.00 | 0 |
2015 | HAROLD R ELKIN | 657.00 | 335 | 0.00 | 0 | 0.00 | 0 |
2016 | HAROLD R ELKIN | 451.71 | 366 | 0.00 | 0 | 0.00 | 0 |
For data sources see[5]
Period | Operator | Waste Type | Quantity | Disposal Method | Waste Facility ID |
---|---|---|---|---|---|
2004 | HAROLD R ELKIN | Brine | 501.00 Bbl | Other | PA0095443 |
2004 | HAROLD R ELKIN | Brine | 80.00 Bbl | Other | 0095273 |
2005 | HAROLD R ELKIN | Brine | 530.00 Bbl | Brine or Industrial Waste Treatment Plt | PA0095273 |
2008 | HAROLD R ELKIN | Brine | 10.00 Bbl | Brine or Industrial Waste Treatment Plt | |
2010 | HAROLD R ELKIN | Produced Fluid | 150.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0095443 |
2011 | HAROLD R ELKIN | Produced Fluid | 65.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0095443 |
2012 | HAROLD R ELKIN | Produced Fluid | 84.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0095443 |
For data sources see[6]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
1333039 | Primary Facility | 2004-05-03 | Drilling/Alteration | No Violations Noted | |
1333912 | Primary Facility | 2004-05-04 | Drilling/Alteration | No Violations Noted | |
2562771 | Primary Facility | 2017-02-14 | Routine/Complete Inspection | No Violations Noted | This well was drilled in an abandoned agricultural area off of Sheesley Road in April 2004. The well is connected to a gas line, but the valves appear to be closed at the time of inspection. Production reporting for 2015 indicated 657.00 Mcf over 335 days. Production information for 2016 was due by 2/15/2017, but has not yet been received. There is no brine tank connected to this well. The well has been tagged with the correct DEP permit number. The site has been graded to final contours and stabilized by vegetation. The access roads at this location are in good condition. A large amount of equipment and an unrestored stone pit can be found near this well site. There is no violation for equipment not necessary for production since the well operator is the landowner. No violations were noted. |
For data sources see[7]