If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 37-073-20356 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.879878,"lon":-80.181328,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Lawrence | |
Municipality: Perry Township | |
Operator Name: PENNENERGY RESOURCES LLC | |
Well Pad ID: 149741 | |
Farm/Lease Name: HUFNAGEL UNIT 1H | |
License Status: | |
Spud Date: | |
Permit Date: 2012-02-10 | |
Well Type: GAS | |
Unconventional Well: Y | |
Configuration: Deviated Well | |
Conservation: Yes | |
Latitude: 40.879878 | |
Longitude: -80.181328 |
Date | Event |
---|---|
2012-02-10 | New Permit Application |
2012-05-23 | Performed Spud Operation |
2012-07-07 | Drilling Completion |
2012-07-26 | New Permit Application |
2013-07-16 | Perforation |
2015-11-20 | DEVIATED |
For data sources see[4]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 2013-07-22 | 2013-07-31 | 9,375 | 5,227,530 |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | Acid | FTS | Acidizing | Hydrochloric Acid | 007647-01-0 | 7.5 | 0.11513 | 0 |
FE-100L | ICI | Iron Control | Citric Acid | 77-92-9 | 55 | 0.00277 | 0 | |
HVG-1 | FTS | Gel | Guar Gum | 9000-30-0 | 45 | 0.00115 | 0 | |
Petroleum Distillate | 64742-47-8 | 50 | 0.00128 | 0 | ||||
Clay | 14808-60-7 | 2.5 | 0.00006000 | 0 | ||||
Surfactant | 68439-51-0 | 2.5 | 0.00006000 | 0 | ||||
Water | Rex | Base Fluid | Water | 7732-18-5 | 100 | 88.3478 | 0 | |
APB-1 | FTS | Breaker | Ammonium Persulfate | 7727-54-0 | 95 | 0.00005000 | 0 | |
CS-500 SI | ICI | Scale Inhibitor | Ethylene Glycol | 107-21-1 | 10 | 0.00469 | 0 | |
NE-100L | ICI | Non-Emulsifier | 2-Butoxyethenol | 111-76-2 | 10 | 0.00014 | 0 | |
2-Propanol | 67-63-0 | 10 | 0.00014 | 0 | ||||
Dodecylbenzenesulfonic Acid | 27176-87-0 | 5 | 0.00007000 | 0 | ||||
FRW-200W | ICI | Friction Reducer | Ethylene Glycol | 107-21-1 | 4 | 0.00353 | 0 | |
Petroleum Distillate | 64742-47-8 | 30 | 0.02651 | 0 | ||||
ICI-3240 | ICI | Bacteriacide | Sodium Hydroxide | 1310-73-2 | 4 | 0.00195 | 0 | |
Dazomet | 533-74-4 | 24 | 0.01168 | 0 | ||||
Sand | Vertex | Proppant | Silica Sand | 14808-60-7 | 100 | 9.92149 | 0 | |
CI-150L | ICI | Corrosion Inhibitor | Dimethylformamide | 68-12-2 | 10 | 0.00026 | 0 | |
Organic Amine Resin Salt | Proprietary | 10 | 0.00026 | 0 | ||||
Aromatic Aldehyde | Proprietary | 5 | 0.00013 | 0 | ||||
Quaternary Ammonium Compound | Proprietary | 5 | 0.00013 | 0 | ||||
Isopropanol | 67-63-0 | 30 | 0.00078 | 0 |
For data sources see[5]
Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
---|---|---|---|---|---|---|---|
2012 | RE GAS DEV LLC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2013 | RE GAS DEV LLC | 264,358.61 | 111 | 0.00 | 0 | 0.00 | 0 |
2014 | RE GAS DEV LLC | 482,472.43 | 335 | 0.00 | 0 | 0.00 | 0 |
2015 | RE GAS DEV LLC | 371,691.25 | 345 | 0.00 | 0 | 0.00 | 0 |
2016 | RE GAS DEV LLC | 285,308.00 | 361 | 0.00 | 0 | 0.00 | 0 |
2017 | RE GAS DEV LLC | 203,140.19 | 356 | 0.00 | 0 | 0.00 | 0 |
2018 | PENNENERGY RESOURCES LLC | 166,869.40 | 363 | 0.00 | 0 | 0.00 | 0 |
2019 | PENNENERGY RESOURCES LLC | 150,144.00 | 360 | 0.00 | 0 | 0.00 | 31 |
For data sources see[6]
Period | Operator | Waste Type | Quantity | Disposal Method | Waste Facility ID |
---|---|---|---|---|---|
2012 | RE GAS DEV LLC | Drill Cuttings | 417.22 Tons | LANDFILL | 100585 |
2013 | RE GAS DEV LLC | Produced Fluid | 2,225.00 Bbl | INJECTION DISPOSAL WELL | 34-155-21438 |
2013 | RE GAS DEV LLC | Produced Fluid | 1,528.00 Bbl | INJECTION DISPOSAL WELL | 34-155-23223 |
2013 | RE GAS DEV LLC | Drill Cuttings | 610.68 Tons | LANDFILL | 100585 |
2013 | RE GAS DEV LLC | Produced Fluid | 185.00 Bbl | INJECTION DISPOSAL WELL | 34-031-27177 |
2013 | RE GAS DEV LLC | Produced Fluid | 105.00 Bbl | INJECTION DISPOSAL WELL | 34-155-21447 |
2013 | RE GAS DEV LLC | Produced Fluid | 1,121.86 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | 3192 |
2013 | RE GAS DEV LLC | Produced Fluid | 1,629.09 Bbl | INJECTION DISPOSAL WELL | 34-151-21179 |
2013 | RE GAS DEV LLC | Produced Fluid | 500.00 Bbl | INJECTION DISPOSAL WELL | 34-007-24523 |
2014 | RE GAS DEV LLC | Produced Fluid | 180.00 Bbl | INJECTION DISPOSAL WELL | 34-155-21438 |
2014 | RE GAS DEV LLC | Produced Fluid | 75.00 Bbl | INJECTION DISPOSAL WELL | 34-155-23759 |
2014 | RE GAS DEV LLC | Produced Fluid | 815.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | 3192 |
2014 | RE GAS DEV LLC | Produced Fluid | 415.00 Bbl | INJECTION DISPOSAL WELL | 34-155-24076 |
2014 | RE GAS DEV LLC | Produced Fluid | 420.00 Bbl | INJECTION DISPOSAL WELL | 34-151-21179 |
2014 | RE GAS DEV LLC | Produced Fluid | 680.00 Bbl | INJECTION DISPOSAL WELL | 34-007-21847 |
2014 | RE GAS DEV LLC | Produced Fluid | 705.00 Bbl | INJECTION DISPOSAL WELL | 34-155-23223 |
2014 | RE GAS DEV LLC | Produced Fluid | 296.00 Bbl | INJECTION DISPOSAL WELL | 34-155-24075 |
2015 | RE GAS DEV LLC | Produced Fluid | 105.00 Bbl | INJECTION DISPOSAL WELL | 34-155-24063 |
2015 | RE GAS DEV LLC | Produced Fluid | 380.00 Bbl | INJECTION DISPOSAL WELL | 34-155-24076 |
2015 | RE GAS DEV LLC | Produced Fluid | 920.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | 3192 |
2015 | RE GAS DEV LLC | Produced Fluid | 45.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | 2014-553 |
2015 | RE GAS DEV LLC | Produced Fluid | 205.00 Bbl | INJECTION DISPOSAL WELL | 34-151-21179 |
2015 | RE GAS DEV LLC | Produced Fluid | 790.00 Bbl | INJECTION DISPOSAL WELL | 34-007-21847 |
2016 | RE GAS DEV LLC | Produced Fluid | 310.00 Bbl | INJECTION DISPOSAL WELL | 34-151-21179 |
2016 | RE GAS DEV LLC | Produced Fluid | 490.00 Bbl | INJECTION DISPOSAL WELL | 34-007-21847 |
2016 | RE GAS DEV LLC | Produced Fluid | 560.00 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2016 | RE GAS DEV LLC | Produced Fluid | 105.00 Bbl | INJECTION DISPOSAL WELL | 34-155-24063 |
2016 | RE GAS DEV LLC | Produced Fluid | 380.00 Bbl | INJECTION DISPOSAL WELL | 34-133-24462 |
2016 | RE GAS DEV LLC | Produced Fluid | 670.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | 3192 |
2017 | RE GAS DEV LLC | Produced Fluid | 90.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | 3192 |
2017 | RE GAS DEV LLC | Produced Fluid | 190.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW019 |
2017 | RE GAS DEV LLC | Produced Fluid | 1,610.00 Bbl | INJECTION DISPOSAL WELL | 34-099-23158 |
2017 | RE GAS DEV LLC | Produced Fluid | 1,062.00 Bbl | REUSE (AT WELL PAD) | |
2017 | RE GAS DEV LLC | Produced Fluid | 90.00 Bbl | INJECTION DISPOSAL WELL | 34-155-24079 |
2018 | RE GAS DEV LLC | Produced Fluid | 840.00 Bbl | REUSE (AT WELL PAD) | |
2018 | RE GAS DEV LLC | Produced Fluid | 1,100.00 Bbl | INJECTION DISPOSAL WELL | 34-099-23158 |
2018 | RE GAS DEV LLC | Produced Fluid | 200.00 Bbl | INJECTION DISPOSAL WELL | 34-155-24079 |
2018 | PENNENERGY RESOURCES LLC | Produced Fluid | 210.00 Bbl | INJECTION DISPOSAL WELL | 34-155-23223 |
2019 | PENNENERGY RESOURCES LLC | Produced Fluid | 387.71 Bbl | INJECTION DISPOSAL WELL | 34-155-23196 |
2019 | PENNENERGY RESOURCES LLC | Produced Fluid | 675.00 Bbl | INJECTION DISPOSAL WELL | 34-155-23795 |
2019 | PENNENERGY RESOURCES LLC | Produced Fluid | 215.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NW009 |
2019 | PENNENERGY RESOURCES LLC | Produced Fluid | 400.00 Bbl | INJECTION DISPOSAL WELL | 34-155-23223 |
2019 | PENNENERGY RESOURCES LLC | Produced Fluid | 1,299.11 Bbl | REUSE (AT WELL PAD) | |
2019 | PENNENERGY RESOURCES LLC | Produced Fluid | 109.00 Bbl | INJECTION DISPOSAL WELL | 34-155-21893 |
2019 | PENNENERGY RESOURCES LLC | Produced Fluid | 305.00 Bbl | INJECTION DISPOSAL WELL | 34-155-22403 |
2019 | PENNENERGY RESOURCES LLC | Produced Fluid | 90.00 Bbl | INJECTION DISPOSAL WELL | 34-099-23158 |
For data sources see[7]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
2063413 | Primary Facility | 2012-04-19 | Routine/Complete Inspection | No Violations Noted | |
2064101 | Primary Facility | 2012-04-27 | Routine/Complete Inspection | No Violations Noted | |
2068124 | Primary Facility | 2012-05-11 | Routine/Complete Inspection | No Violations Noted | |
2070570 | Primary Facility | 2012-05-23 | Drilling/Alteration | No Violations Noted | |
2071094 | Primary Facility | 2012-05-23 | Routine/Complete Inspection | No Violations Noted | |
2073183 | Primary Facility | 2012-06-04 | Drilling/Alteration | No Violations Noted | |
2073770 | Primary Facility | 2012-06-06 | Drilling/Alteration | No Violations Noted | |
2076160 | Primary Facility | 2012-06-12 | Drilling/Alteration | No Violations Noted | |
2076163 | Primary Facility | 2012-06-15 | Drilling/Alteration | No Violations Noted | |
2077271 | Primary Facility | 2012-06-20 | Drilling/Alteration | No Violations Noted | |
2078803 | Primary Facility | 2012-06-25 | Routine/Complete Inspection | No Violations Noted | |
2081287 | Primary Facility | 2012-07-05 | Drilling/Alteration | No Violations Noted | |
2089607 | Primary Facility | 2012-07-17 | Routine/Complete Inspection | No Violations Noted | |
2091040 | Primary Facility | 2012-07-18 | Routine/Partial Inspection | No Violations Noted | |
2092049 | Primary Facility | 2012-07-24 | Routine/Partial Inspection | No Violations Noted | |
2093210 | Primary Facility | 2012-08-21 | Routine/Partial Inspection | No Violations Noted | |
2113623 | Primary Facility | 2012-11-07 | Routine/Complete Inspection | No Violations Noted | |
2147620 | Primary Facility | 2013-02-14 | Routine/Partial Inspection | No Violations Noted | |
2196601 | Primary Facility | 2013-07-31 | Routine/Partial Inspection | No Violations Noted | |
2284414 | Primary Facility | 2014-07-07 | Routine/Partial Inspection | No Violations Noted | |
2312881 | Primary Facility | 2014-10-15 | Routine/Complete Inspection | No Violations Noted | |
2336918 | Primary Facility | 2015-01-20 | Routine/Complete Inspection | No Violations Noted | |
2349822 | Primary Facility | 2015-03-09 | Routine/Complete Inspection | No Violations Noted | |
2425382 | Primary Facility | 2015-11-16 | Routine/Complete Inspection | No Violations Noted | |
2553899 | Primary Facility | 2017-01-20 | Routine/Partial Inspection | No Violations Noted | |
2847292 | Primary Facility | 2019-03-04 | Routine/Complete Inspection | No Violations Noted | Routine inspection of well pad and two producing wells. Site recently snow-plowed. Access road open; well pad gate locked. Gas processing units and tanks are inside dike. Cattle guard around both wellheads. Methanol tank with drip line at wellheads. Two wells on site: Hufnagel Unit 1H (073-20356) and Perry Township Unit 1HD (073-20397). No issues. |
For data sources see[8]