X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

37-073-20484

Well Details

Well ID: 37-073-20484
Loading map...
Country: United States
State: Pennsylvania
County: Lawrence
Municipality: Pulaski Township
Operator Name: HILCORP ENERGY CO
Well Pad ID: 151644
Farm/Lease Name: PULASKI CHRASTINA 4H
License Status:
Spud Date:
Permit Date: 2014-09-03
Well Type: COMB. OIL&GAS
Unconventional Well: Y
Configuration: Horizontal Well
Conservation: Yes
Latitude: 41.099903
Longitude: -80.413767

For data sources see[1][2][3]

Well History

Date Event
2014-09-03 New Permit Application
2014-12-19 Performed Spud Operation
2015-03-30 Drilling Completion
2015-05-29 Perforation
2015-12-04 DEVIATED

For data sources see[4]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2015-07-04 2015-07-10 7,532 8,921,300 0

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Hydrochloric Acid (7.5%) Axiall Acidizing Hydrogen Chloride 7647-01-0 7.5 0.0861771 74168.2
K-Bac 1020 WST Biocide Polyethylene Glycol 25322-68-3 50 0.0139349 11993
Water 7732-18-5 30 0.00836091 7195.81
2,2-Dibromo-3-nitrilopropionamide 10222-01-2 20 0.00557394 4797.21
Water Hilcorp Carrier/Base Fluid Water 7732-18-5 100 86.5025 74,448,300.0
Scale Hib A Nalco Scale Inhibitor Triethanolamine Tri(Phosphate Ester), Sodium Salt 68171-29-9 30 0.00337334 2903.26
Ethylene Glycol 107-21-1 30 0.00337334 2903.26
Unihib G GeoSafe Acid Inhibitor Methanol 67-56-1 5 0.00001894 16.298
Ethoxylated alcohol 68002-97-1 35 0.000132556 114.084
Formaldehyde 50-00-0 1 0.00000379 3.26
Acetophenone 98-86-2 1 0.00000379 3.26
Short chained glycol ether 112-34-5 60 0.000227239 195.573
Thiourea 62-56-6 1 0.00000379 3.26
Sand (Proppant) Sargent Proppant Silica 14808-60-7 99.9 12.2266 10,522,800.0
Unislick ST50 CESI Friction Reducer Petroleum Distillates, Hydrotreated Light 64742-47-8 30 0.0210348 18103.6
Alcohols, ethoxylated 68439-50-9 5 0.00350581 3017.27
Alcohols, ethoxylated 68551-12-2 5 0.00350581 3017.27
Ammonium Acetate 631-61-8 13 0.00911509 7844.9
Alcohols, ethoxylated 68002-97-1 5 0.00350581 3017.27

For data sources see[5]

Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2014 HILCORP ENERGY CO 0.00 0 0.00 0 0.00 0
2015 HILCORP ENERGY CO 441,425.00 153 0.00 0 1,398.00 153
2016 HILCORP ENERGY CO 607,764.00 362 0.00 0 1,164.00 362
2017 HILCORP ENERGY CO 630,209.00 355 0.00 0 302.00 355
2018 HILCORP ENERGY CO 409,629.00 359 0.00 0 82.00 329
2019 HILCORP ENERGY CO 290,312.00 360 93.00 213 0.00 0

For data sources see[6]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2015 HILCORP ENERGY CO Produced Fluid 844.00 Bbl INJECTION DISPOSAL WELL 34-133-21076
2015 HILCORP ENERGY CO Produced Fluid 351.00 Bbl CENT WASTE TRT FAC NPDES EPA ID: 748-163
2015 HILCORP ENERGY CO Drilling Fluid Waste 215.00 Bbl CENT WASTE TRT FAC NPDES EPA ID: 748-163
2015 HILCORP ENERGY CO Drilling Fluid Waste 215.00 Bbl CENT WASTE TRT FAC NPDES DISCHARGE EPA ID: 748-163
2015 HILCORP ENERGY CO Produced Fluid 351.00 Bbl CENT WASTE TRT FAC NPDES DISCHARGE EPA ID: 748-163
2015 HILCORP ENERGY CO Produced Fluid 257.00 Bbl INJECTION DISPOSAL WELL 34-007-24355
2016 HILCORP ENERGY CO Produced Fluid 902.00 Bbl INJECTION DISPOSAL WELL 34-133-22523
2017 HILCORP ENERGY CO Produced Fluid 1,141.00 Bbl INJECTION DISPOSAL WELL 34-133-22523
2017 HILCORP ENERGY CO Produced Fluid 4,497.75 Bbl INJECTION DISPOSAL WELL 34-099-23158
2018 HILCORP ENERGY CO Produced Fluid 2,308.03 Bbl INJECTION DISPOSAL WELL 34-099-23158
2018 HILCORP ENERGY CO Produced Fluid 10,180.14 Bbl INJECTION DISPOSAL WELL 34-155-24079
2019 HILCORP ENERGY CO Produced Fluid 8,522.27 Bbl INJECTION DISPOSAL WELL 34-099-23158

For data sources see[7]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
2329759 Primary Facility 2014-12-17 Drilling/Alteration No Violations Noted
2330427 Primary Facility 2014-12-19 Drilling/Alteration No Violations Noted
2331204 Primary Facility 2014-12-20 Routine/Partial Inspection No Violations Noted
2336424 Primary Facility 2015-01-16 Drilling/Alteration No Violations Noted
2337690 Primary Facility 2015-01-20 Drilling/Alteration No Violations Noted
2354866 Primary Facility 2015-03-25 Drilling/Alteration No Violations Noted
2384628 Primary Facility 2015-07-02 Drilling/Alteration No Violations Noted
2613931 Primary Facility 2017-06-29 Routine/Partial Inspection No Violations Noted

For data sources see[8]

References