X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

37-081-20109

Well Details

Well ID: 37-081-20109
Loading map...
Country: United States
State: Pennsylvania
County: Lycoming
Municipality: Penn Township
Operator Name: EXCO RESOURCES PA LLC
Well Pad ID: 147783
Farm/Lease Name: BARTO UNIT 1H
License Status: ACTIVE
Spud Date:
Permit Date: 2008-05-13
Well Type: GAS
Unconventional Well: Y
Configuration: Horizontal Well
Conservation: Yes
Latitude: 41.270892
Longitude: -76.659691

For data sources see[1][2][3]

Well History

Date Event
2008-05-13 New Permit Application
2008-09-09 New Permit Application
2008-09-14 Performed Spud Operation
2008-10-26 Drilling Completion
2008-12-23 DEVIATED
2009-03-13 Perforation

For data sources see[4]


Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2008 CHIEF OIL & GAS LLC 0.00 0 0.00 0 0.00 0
2009 CHIEF OIL & GAS LLC 323450.00 263 0.00 0 0.00 0
2010 CHIEF OIL & GAS LLC 296,126.00 345 0.00 0 0.00 0
2011 EXCO RESOURCES PA LLC 172,936.00 305 0.00 0 0.00 0
2012 EXCO RESOURCES PA LLC 195,643.00 366 0.00 0 0.00 0
2013 EXCO RESOURCES PA LLC 157,924.00 365 0.00 0 0.00 0
2014 EXCO RESOURCES PA LLC 131,167.00 363 0.00 0 0.00 0
2015 EXCO RESOURCES PA LLC 141,208.00 323 0.00 0 0.00 0
2016 EXCO RESOURCES PA LLC 119,425.00 278 0.00 0 0.00 0
2017 EXCO RESOURCES PA LLC 124,556.00 339 0.00 0 0.00 0
2018 EXCO RESOURCES PA LLC 118,687.00 364 0.00 0 0.00 0
2019 EXCO RESOURCES PA LLC 103,959.00 364 0.00 0 0.00 0

For data sources see[5]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2008 CHIEF OIL & GAS LLC Drilling 2,702.00 Bbl Brine or Industrial Waste Treatment Plt PA0101508
2009 CHIEF OIL & GAS LLC Fracking Fluid 100.00 Bbl Brine or Industrial Waste Treatment Plt PA0027057
2009 CHIEF OIL & GAS LLC Fracking Fluid 22,155.00 Bbl Brine or Industrial Waste Treatment Plt PA0028665
2009 CHIEF OIL & GAS LLC Brine 5,879.00 Bbl Brine or Industrial Waste Treatment Plt PA0008451
2010 CHIEF OIL & GAS LLC Produced Fluid 260.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR119
2010 CHIEF OIL & GAS LLC Produced Fluid 2,030.50 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0008451
2010 CHIEF OIL & GAS LLC Fracing Fluid Waste 5,461.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR119
2010 CHIEF OIL & GAS LLC Drilling Fluid Waste 2,342.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR119
2010 CHIEF OIL & GAS LLC Produced Fluid 1,114.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR123SW018
2010 CHIEF OIL & GAS LLC Drilling Fluid Waste 1,574.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR123SW018
2010 CHIEF OIL & GAS LLC Produced Fluid 365.00 Bbl INJECTION DISPOSAL WELL 34-155-21893
2010 CHIEF OIL & GAS LLC Fracing Fluid Waste 1.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0027057
2010 CHIEF OIL & GAS LLC Drilling Fluid Waste 3,543.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0008451
2011 CHIEF OIL & GAS LLC Produced Fluid 632.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR119
2011 EXCO RESOURCES PA LLC Produced Fluid 119.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PAS2D205BCLE
2011 CHIEF OIL & GAS LLC Fracing Fluid Waste 131.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0008451
2011 EXCO RESOURCES PA LLC Produced Fluid 119.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0101508
2011 EXCO RESOURCES PA LLC Produced Fluid 476.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0008451
2012 EXCO RESOURCES PA LLC Produced Fluid 485.95 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR119
2012 EXCO RESOURCES PA LLC Drill Cuttings 12.98 Tons LANDFILL 301358
2013 EXCO RESOURCES PA LLC Produced Fluid 147.62 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123NC009
2013 EXCO RESOURCES PA LLC Produced Fluid 9.50 Bbl STORAGE PENDING DISPOSAL OR REUSE
2013 EXCO RESOURCES PA LLC Produced Fluid 219.04 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR119
2014 EXCO RESOURCES PA LLC Produced Fluid 177.40 Bbl INJECTION DISPOSAL WELL PAS2D205BCLE
2014 EXCO RESOURCES PA LLC Produced Fluid 51.30 Bbl REUSE OTHER THAN ROAD SPREADING
2014 EXCO RESOURCES PA LLC Produced Fluid 193.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123NC010
2014 EXCO RESOURCES PA LLC Produced Fluid 277.60 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR119
2014 EXCO RESOURCES PA LLC Produced Fluid 51.20 Bbl STORAGE PENDING DISPOSAL OR REUSE
2014 EXCO RESOURCES PA LLC Produced Fluid 27.40 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123
2015 EXCO RESOURCES PA LLC Produced Fluid 415.60 Bbl INJECTION DISPOSAL WELL PAS2D205BCLE
2015 EXCO RESOURCES PA LLC Produced Fluid 78.60 Bbl REUSE OTHER THAN ROAD SPREADING
2016 EXCO RESOURCES PA LLC Produced Fluid 439.00 Bbl INJECTION DISPOSAL WELL PAS2D205BCLE
2017 EXCO RESOURCES PA LLC Produced Fluid 607.40 Bbl INJECTION DISPOSAL WELL PAS2D205BCLE
2017 EXCO RESOURCES PA LLC Synthetic Liner Materials 75.64 Tons LANDFILL 301358
2018 EXCO RESOURCES PA LLC Produced Fluid 25.60 Bbl REUSE (AT WELL PAD)
2018 EXCO RESOURCES PA LLC Produced Fluid 504.00 Bbl INJECTION DISPOSAL WELL PAS2D205BCLE
2018 EXCO RESOURCES PA LLC Produced Fluid 169.60 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC010
2019 EXCO RESOURCES PA LLC Produced Fluid 376.30 Bbl INJECTION DISPOSAL WELL PAS2D205BCLE
2019 EXCO RESOURCES PA LLC Produced Fluid 108.50 Bbl REUSE (AT WELL PAD)

For data sources see[6]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
1709791 Primary Facility 2008-05-29 Routine/Complete Inspection No Violations Noted
1713211 Primary Facility 2008-06-03 Routine/Complete Inspection No Violations Noted
1729726 Primary Facility 2008-08-07 Drilling/Alteration No Violations Noted
1732915 Primary Facility 2008-09-04 Routine/Complete Inspection No Violations Noted The company was in the process of setting up the drill rig. No violations were observed at the site.
1736086 Primary Facility 2008-09-05 Drilling/Alteration No Violations Noted
1737778 Primary Facility 2008-09-19 Drilling/Alteration No Violations Noted
1755972 Primary Facility 2008-12-11 Routine/Complete Inspection No Violations Noted
1760458 Primary Facility 2009-01-06 Routine/Complete Inspection No Violations Noted
1863151 Primary Facility 2010-02-12 Routine/Complete Inspection No Violations Noted
1899627 Primary Facility 2010-07-21 Routine/Partial Inspection Violation(s) Noted No well tag, pit liner has holes in it and lacks required 2' freeboard
1929505 Primary Facility 2010-11-15 Follow-up Inspection Violation(s) Noted Trash lying all around site
1931768 Primary Facility 2010-12-03 Follow-up Inspection No Violations Noted
1942086 Primary Facility 2011-01-06 Routine/Complete Inspection No Violations Noted
1942160 Primary Facility 2011-01-10 Routine/Complete Inspection Violation(s) Noted
1965808 Primary Facility 2011-04-14 Routine/Complete Inspection No Violations Noted
2069504 Primary Facility 2012-05-18 Routine/Complete Inspection No Violations Noted
2077095 Primary Facility 2012-06-20 Routine/Complete Inspection No Violations Noted
2083395 Primary Facility 2012-07-12 Routine/Complete Inspection No Violations Noted
2120902 Primary Facility 2012-12-04 Complaint Inspection No Violations Noted
2469494 Primary Facility 2016-03-22 Routine/Complete Inspection No Violations Noted At the time of the inspection two wells (081-20109 and 081-20119) were onsite in production. The well pad remains at the originally permitted size and PCSM was implemented for the entire well pad area as permitted by the Lycoming CCD. The well pad is being used as a storage yard for various materials. Please remove the materials/equipment or provide the landowners consent for storage of materials onsite under § 3216 (c) OGA. At some time since the original pad was constructed, the access road was re-routed to accommodate the Barto Compressor Station. The Barto Compressor Station and the re-route of a portion of the access road to your site were covered under ESCGP-1 #4108803 issued to Chief Gathering and currently owned by Regency Energy (Energy Transfer Partners). The plans for the Barto 1-6H well pad do not reflect the current conditions onsite and the permit has now expired. The Department requests you re-permit this well pad from the LOD of the adjacent ESCGP-1# 4108803 to accommodate the well site
2658490 Primary Facility 2017-10-25 Routine/Complete Inspection No Violations Noted The PCSM/Well Site Restoration plans were recently implemented and stabilized with hydro-seed. The footprint of the well pad surface has also been reduced. The 2-part outlet structure on the infiltration basin at the entrance to the site is currently not sealed. This condition currently allows water to discharge several inches below the design capacity. In addition, implementation of the two infiltration basins is not functioning as designed. Currently, water is discharging between the two infiltration features. This concentrated-flow is causing erosion and renders the structures ineffective. Erosion and sedimentation was not noted outside the perimeter E & S controls. I recommend addressing the stabilization, erosion, and PCSM noted above. No violations noted.
2694334 Primary Facility 2018-02-14 Routine/Complete Inspection No Violations Noted Weather was 30° and cloudy at time of inspection. Well has a digital gauge attached to the swab valve and also to the 5 1/2 casing valve. The digital gauge attached to the swab valve read 153 psi and the 5 1/2 casing gauge read 223 psi at time of inspection. There were 2 annulus vents observed during the inspection, but it was unable to be determined where each vent originated from. 0% combustible gas was detected in any location at time of inspection. A steel line appeared it should have been attached to a casing valve for foaming agent was observed to be disconnected at time of inspection. No leaks or apparent spills were observed. No violations were noted at time of inspection.
2793327 Primary Facility 2018-10-23 Routine/Complete Inspection No Violations Noted Two wells in a production phase. Two GPUs within containment. No leaks from production equipment. No violations noted.

Violations Commited

Inspection ID Violation ID Violation Date Date Resolved Violation Code Violation Type Violation Comments
1899627 591543 07/21/2010 2010-07-21 201TAG - Failure to install, in a permanent manner, the permit number on a completed well Administrative
1899627 591544 07/21/2010 2010-07-21 78.56FRBRD - Failure to maintain 2' freeboard in an impoundment Administrative 78.56(a)(4)
1929505 599989 11/15/2010 2010-11-15 SWMA301 - Failure to properly store, transport, process or dispose of a residual waste. Environmental Health & Safety
1942160 602814 01/10/2011 2011-01-10 78.85 - Inadequate, insufficient, and/or improperly installed cement Environmental Health & Safety 150psi on the 5 1/2 x 9 5/8 and may be connected to other annuli such as the 9 5/8 x 13 3/8 annulus. stone in cellar. Steven Travis from American Peak Production who was present told me that he is not certain that the pressure is limited to only annulus
1942160 602815 01/10/2011 2011-01-10 78.86* - Failure to report defective, insufficient, or improperly cemented casing w/in 24 hrs or submit plan to correct w/in 30 days Administrative 150psi on the 5 1/2 x 9 5/8 and may be connected to other annuli such as the 9 5/8 x 13 3/8 annulus. stone in cellar. Steven Travis from American Peak Production who was present told me that he is not certain that the pressure is limited to only annulus

Penalties Applied

Violation ID Penalty ID Penalty Code Penalty Status Penalty Date Enforcement Date Penalty Amount Amount Collected
591543 261031 NOV - Notice of Violation Comply/Closed 2011-08-31
591544 261031 NOV - Notice of Violation Comply/Closed 2011-08-31

For data sources see[7]

References