If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 37-081-20109 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.270892,"lon":-76.659691,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Lycoming | |
Municipality: Penn Township | |
Operator Name: EXCO RESOURCES PA LLC | |
Well Pad ID: 147783 | |
Farm/Lease Name: BARTO UNIT 1H | |
License Status: ACTIVE | |
Spud Date: | |
Permit Date: 2008-05-13 | |
Well Type: GAS | |
Unconventional Well: Y | |
Configuration: Horizontal Well | |
Conservation: Yes | |
Latitude: 41.270892 | |
Longitude: -76.659691 |
Date | Event |
---|---|
2008-05-13 | New Permit Application |
2008-09-09 | New Permit Application |
2008-09-14 | Performed Spud Operation |
2008-10-26 | Drilling Completion |
2008-12-23 | DEVIATED |
2009-03-13 | Perforation |
For data sources see[4]
Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
---|---|---|---|---|---|---|---|
2008 | CHIEF OIL & GAS LLC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2009 | CHIEF OIL & GAS LLC | 323450.00 | 263 | 0.00 | 0 | 0.00 | 0 |
2010 | CHIEF OIL & GAS LLC | 296,126.00 | 345 | 0.00 | 0 | 0.00 | 0 |
2011 | EXCO RESOURCES PA LLC | 172,936.00 | 305 | 0.00 | 0 | 0.00 | 0 |
2012 | EXCO RESOURCES PA LLC | 195,643.00 | 366 | 0.00 | 0 | 0.00 | 0 |
2013 | EXCO RESOURCES PA LLC | 157,924.00 | 365 | 0.00 | 0 | 0.00 | 0 |
2014 | EXCO RESOURCES PA LLC | 131,167.00 | 363 | 0.00 | 0 | 0.00 | 0 |
2015 | EXCO RESOURCES PA LLC | 141,208.00 | 323 | 0.00 | 0 | 0.00 | 0 |
2016 | EXCO RESOURCES PA LLC | 119,425.00 | 278 | 0.00 | 0 | 0.00 | 0 |
2017 | EXCO RESOURCES PA LLC | 124,556.00 | 339 | 0.00 | 0 | 0.00 | 0 |
2018 | EXCO RESOURCES PA LLC | 118,687.00 | 364 | 0.00 | 0 | 0.00 | 0 |
2019 | EXCO RESOURCES PA LLC | 103,959.00 | 364 | 0.00 | 0 | 0.00 | 0 |
For data sources see[5]
Period | Operator | Waste Type | Quantity | Disposal Method | Waste Facility ID |
---|---|---|---|---|---|
2008 | CHIEF OIL & GAS LLC | Drilling | 2,702.00 Bbl | Brine or Industrial Waste Treatment Plt | PA0101508 |
2009 | CHIEF OIL & GAS LLC | Fracking Fluid | 100.00 Bbl | Brine or Industrial Waste Treatment Plt | PA0027057 |
2009 | CHIEF OIL & GAS LLC | Fracking Fluid | 22,155.00 Bbl | Brine or Industrial Waste Treatment Plt | PA0028665 |
2009 | CHIEF OIL & GAS LLC | Brine | 5,879.00 Bbl | Brine or Industrial Waste Treatment Plt | PA0008451 |
2010 | CHIEF OIL & GAS LLC | Produced Fluid | 260.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | WMGR119 |
2010 | CHIEF OIL & GAS LLC | Produced Fluid | 2,030.50 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0008451 |
2010 | CHIEF OIL & GAS LLC | Fracing Fluid Waste | 5,461.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | WMGR119 |
2010 | CHIEF OIL & GAS LLC | Drilling Fluid Waste | 2,342.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | WMGR119 |
2010 | CHIEF OIL & GAS LLC | Produced Fluid | 1,114.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | WMGR123SW018 |
2010 | CHIEF OIL & GAS LLC | Drilling Fluid Waste | 1,574.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | WMGR123SW018 |
2010 | CHIEF OIL & GAS LLC | Produced Fluid | 365.00 Bbl | INJECTION DISPOSAL WELL | 34-155-21893 |
2010 | CHIEF OIL & GAS LLC | Fracing Fluid Waste | 1.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0027057 |
2010 | CHIEF OIL & GAS LLC | Drilling Fluid Waste | 3,543.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0008451 |
2011 | CHIEF OIL & GAS LLC | Produced Fluid | 632.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | WMGR119 |
2011 | EXCO RESOURCES PA LLC | Produced Fluid | 119.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PAS2D205BCLE |
2011 | CHIEF OIL & GAS LLC | Fracing Fluid Waste | 131.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0008451 |
2011 | EXCO RESOURCES PA LLC | Produced Fluid | 119.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0101508 |
2011 | EXCO RESOURCES PA LLC | Produced Fluid | 476.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0008451 |
2012 | EXCO RESOURCES PA LLC | Produced Fluid | 485.95 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | WMGR119 |
2012 | EXCO RESOURCES PA LLC | Drill Cuttings | 12.98 Tons | LANDFILL | 301358 |
2013 | EXCO RESOURCES PA LLC | Produced Fluid | 147.62 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NC009 |
2013 | EXCO RESOURCES PA LLC | Produced Fluid | 9.50 Bbl | STORAGE PENDING DISPOSAL OR REUSE | |
2013 | EXCO RESOURCES PA LLC | Produced Fluid | 219.04 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | WMGR119 |
2014 | EXCO RESOURCES PA LLC | Produced Fluid | 177.40 Bbl | INJECTION DISPOSAL WELL | PAS2D205BCLE |
2014 | EXCO RESOURCES PA LLC | Produced Fluid | 51.30 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2014 | EXCO RESOURCES PA LLC | Produced Fluid | 193.00 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NC010 |
2014 | EXCO RESOURCES PA LLC | Produced Fluid | 277.60 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR119 |
2014 | EXCO RESOURCES PA LLC | Produced Fluid | 51.20 Bbl | STORAGE PENDING DISPOSAL OR REUSE | |
2014 | EXCO RESOURCES PA LLC | Produced Fluid | 27.40 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123 |
2015 | EXCO RESOURCES PA LLC | Produced Fluid | 415.60 Bbl | INJECTION DISPOSAL WELL | PAS2D205BCLE |
2015 | EXCO RESOURCES PA LLC | Produced Fluid | 78.60 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2016 | EXCO RESOURCES PA LLC | Produced Fluid | 439.00 Bbl | INJECTION DISPOSAL WELL | PAS2D205BCLE |
2017 | EXCO RESOURCES PA LLC | Produced Fluid | 607.40 Bbl | INJECTION DISPOSAL WELL | PAS2D205BCLE |
2017 | EXCO RESOURCES PA LLC | Synthetic Liner Materials | 75.64 Tons | LANDFILL | 301358 |
2018 | EXCO RESOURCES PA LLC | Produced Fluid | 25.60 Bbl | REUSE (AT WELL PAD) | |
2018 | EXCO RESOURCES PA LLC | Produced Fluid | 504.00 Bbl | INJECTION DISPOSAL WELL | PAS2D205BCLE |
2018 | EXCO RESOURCES PA LLC | Produced Fluid | 169.60 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NC010 |
2019 | EXCO RESOURCES PA LLC | Produced Fluid | 376.30 Bbl | INJECTION DISPOSAL WELL | PAS2D205BCLE |
2019 | EXCO RESOURCES PA LLC | Produced Fluid | 108.50 Bbl | REUSE (AT WELL PAD) |
For data sources see[6]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
1709791 | Primary Facility | 2008-05-29 | Routine/Complete Inspection | No Violations Noted | |
1713211 | Primary Facility | 2008-06-03 | Routine/Complete Inspection | No Violations Noted | |
1729726 | Primary Facility | 2008-08-07 | Drilling/Alteration | No Violations Noted | |
1732915 | Primary Facility | 2008-09-04 | Routine/Complete Inspection | No Violations Noted | The company was in the process of setting up the drill rig. No violations were observed at the site. |
1736086 | Primary Facility | 2008-09-05 | Drilling/Alteration | No Violations Noted | |
1737778 | Primary Facility | 2008-09-19 | Drilling/Alteration | No Violations Noted | |
1755972 | Primary Facility | 2008-12-11 | Routine/Complete Inspection | No Violations Noted | |
1760458 | Primary Facility | 2009-01-06 | Routine/Complete Inspection | No Violations Noted | |
1863151 | Primary Facility | 2010-02-12 | Routine/Complete Inspection | No Violations Noted | |
1899627 | Primary Facility | 2010-07-21 | Routine/Partial Inspection | Violation(s) Noted | No well tag, pit liner has holes in it and lacks required 2' freeboard |
1929505 | Primary Facility | 2010-11-15 | Follow-up Inspection | Violation(s) Noted | Trash lying all around site |
1931768 | Primary Facility | 2010-12-03 | Follow-up Inspection | No Violations Noted | |
1942086 | Primary Facility | 2011-01-06 | Routine/Complete Inspection | No Violations Noted | |
1942160 | Primary Facility | 2011-01-10 | Routine/Complete Inspection | Violation(s) Noted | |
1965808 | Primary Facility | 2011-04-14 | Routine/Complete Inspection | No Violations Noted | |
2069504 | Primary Facility | 2012-05-18 | Routine/Complete Inspection | No Violations Noted | |
2077095 | Primary Facility | 2012-06-20 | Routine/Complete Inspection | No Violations Noted | |
2083395 | Primary Facility | 2012-07-12 | Routine/Complete Inspection | No Violations Noted | |
2120902 | Primary Facility | 2012-12-04 | Complaint Inspection | No Violations Noted | |
2469494 | Primary Facility | 2016-03-22 | Routine/Complete Inspection | No Violations Noted | At the time of the inspection two wells (081-20109 and 081-20119) were onsite in production. The well pad remains at the originally permitted size and PCSM was implemented for the entire well pad area as permitted by the Lycoming CCD. The well pad is being used as a storage yard for various materials. Please remove the materials/equipment or provide the landowners consent for storage of materials onsite under § 3216 (c) OGA. At some time since the original pad was constructed, the access road was re-routed to accommodate the Barto Compressor Station. The Barto Compressor Station and the re-route of a portion of the access road to your site were covered under ESCGP-1 #4108803 issued to Chief Gathering and currently owned by Regency Energy (Energy Transfer Partners). The plans for the Barto 1-6H well pad do not reflect the current conditions onsite and the permit has now expired. The Department requests you re-permit this well pad from the LOD of the adjacent ESCGP-1# 4108803 to accommodate the well site |
2658490 | Primary Facility | 2017-10-25 | Routine/Complete Inspection | No Violations Noted | The PCSM/Well Site Restoration plans were recently implemented and stabilized with hydro-seed. The footprint of the well pad surface has also been reduced. The 2-part outlet structure on the infiltration basin at the entrance to the site is currently not sealed. This condition currently allows water to discharge several inches below the design capacity. In addition, implementation of the two infiltration basins is not functioning as designed. Currently, water is discharging between the two infiltration features. This concentrated-flow is causing erosion and renders the structures ineffective. Erosion and sedimentation was not noted outside the perimeter E & S controls. I recommend addressing the stabilization, erosion, and PCSM noted above. No violations noted. |
2694334 | Primary Facility | 2018-02-14 | Routine/Complete Inspection | No Violations Noted | Weather was 30° and cloudy at time of inspection. Well has a digital gauge attached to the swab valve and also to the 5 1/2 casing valve. The digital gauge attached to the swab valve read 153 psi and the 5 1/2 casing gauge read 223 psi at time of inspection. There were 2 annulus vents observed during the inspection, but it was unable to be determined where each vent originated from. 0% combustible gas was detected in any location at time of inspection. A steel line appeared it should have been attached to a casing valve for foaming agent was observed to be disconnected at time of inspection. No leaks or apparent spills were observed. No violations were noted at time of inspection. |
2793327 | Primary Facility | 2018-10-23 | Routine/Complete Inspection | No Violations Noted | Two wells in a production phase. Two GPUs within containment. No leaks from production equipment. No violations noted. |
Inspection ID | Violation ID | Violation Date | Date Resolved | Violation Code | Violation Type | Violation Comments |
---|---|---|---|---|---|---|
1899627 | 591543 | 07/21/2010 | 2010-07-21 | 201TAG - Failure to install, in a permanent manner, the permit number on a completed well | Administrative | |
1899627 | 591544 | 07/21/2010 | 2010-07-21 | 78.56FRBRD - Failure to maintain 2' freeboard in an impoundment | Administrative | 78.56(a)(4) |
1929505 | 599989 | 11/15/2010 | 2010-11-15 | SWMA301 - Failure to properly store, transport, process or dispose of a residual waste. | Environmental Health & Safety | |
1942160 | 602814 | 01/10/2011 | 2011-01-10 | 78.85 - Inadequate, insufficient, and/or improperly installed cement | Environmental Health & Safety | 150psi on the 5 1/2 x 9 5/8 and may be connected to other annuli such as the 9 5/8 x 13 3/8 annulus. stone in cellar. Steven Travis from American Peak Production who was present told me that he is not certain that the pressure is limited to only annulus |
1942160 | 602815 | 01/10/2011 | 2011-01-10 | 78.86* - Failure to report defective, insufficient, or improperly cemented casing w/in 24 hrs or submit plan to correct w/in 30 days | Administrative | 150psi on the 5 1/2 x 9 5/8 and may be connected to other annuli such as the 9 5/8 x 13 3/8 annulus. stone in cellar. Steven Travis from American Peak Production who was present told me that he is not certain that the pressure is limited to only annulus |
Violation ID | Penalty ID | Penalty Code | Penalty Status | Penalty Date | Enforcement Date | Penalty Amount | Amount Collected |
---|---|---|---|---|---|---|---|
591543 | 261031 | NOV - Notice of Violation | Comply/Closed | 2011-08-31 | |||
591544 | 261031 | NOV - Notice of Violation | Comply/Closed | 2011-08-31 |
For data sources see[7]