X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

37-081-20198

Well Details

Well ID: 37-081-20198
Loading map...
Country: United States
State: Pennsylvania
County: Lycoming
Municipality: McHenry Township
Operator Name: ARD OPR LLC
Well Pad ID: 148061
Farm/Lease Name: COP TRACT 289 B1009H
License Status:
Spud Date:
Permit Date: 2009-10-02
Well Type: GAS
Unconventional Well: Y
Configuration: Horizontal Well
Conservation: No
Latitude: 41.380736
Longitude: -77.521939

For data sources see[1][2][3]

Well History

Date Event
2009-10-02 New Permit Application
2010-07-12 Performed Spud Operation
2010-10-02 New Permit Application
2010-11-01 Drilling Completion
2011-01-03 DEVIATED
2011-01-04 Perforation
2011-01-11 Perforation
2012-03-06 NEWLY DRILLED

For data sources see[4]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2011-01-04 2011-01-04 8,302 5,689,914

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 CS-39 Halliburton Energy Services Clay Stabilizer Proprietary inorganic chemical 20.00 0.02
Proprietary poly electrolyte 40.00 0.05
Chloride 16887-00-6 30.00 0.04
Water 7732-18-5 60.00 0.08
Sand Halliburton Energy Services Proppant Quartz 14808-60-7 100.00 11.81
LCA-1 Solvent Halliburton Energy Services Solvent Paraffinic solvent 100.00 0.00306000
HAI-OS ACID INHIBITOR Halliburton Energy Services Corrosion Inhibitor Propargyl alcohol 107-19-7 10.00 0.00005000
Methanol 67-56-1 60.00 0.00031000
LP-65 Halliburton Energy Services Scale Inhibitor Ammonium chloride 12125-02-9 10.00 0.00250000
SP Halliburton Energy Services Gel Breaker Sodium persulfate 7775-27-1 100.00 0.00011000
LGC-36 UC Halliburton Energy Services Liquid Gel Concentrate Naphtha, petroleum, hydrotreated heavy 64742-48-9 60.00 0.00549000
Guar gum 9000-30-0 60.00 0.00549000
Acid, Hydrochloric (7.5) Halliburton Energy Services Solvent Hydrochloric acid 7647-01-0 7.50 0.04
FDP-S944-09 Halliburton Energy Services Friction Reducer Distillates, petroleum, hydrotreated light 64742-47-8 30.00 0.01
GBW-30 BREAKER Halliburton Energy Services Gelling Agent Carbohydrates 95.00 0.00011000
Hemicellulase enzyme 9012-54-8 15.00 0.00002000
Water Anadarko Carrier/Base Fluid Water 7732-18-5 100.00 87.33
BE-9M Halliburton Energy Services Biocide Tri-n-butyl tetradecyl phosphonium chloride 81741-28-8 10.00 0.00217000
Methanol 67-56-1 30.00 0.00652000

For data sources see[5]

Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2009 ANADARKO E&P ONSHORE LLC 0.00 0 0.00 0 0.00 0
2010 ANADARKO E&P ONSHORE LLC 0.00 0 0.00 0 0.00 0
2011 ANADARKO E&P ONSHORE LLC 1,424,803.00 323 0.00 0 0.00 0
2012 ANADARKO E&P ONSHORE LLC 859,918.00 366 0.00 0 0.00 0
2013 ANADARKO E&P ONSHORE LLC 739,619.00 365 0.00 0 0.00 0
2014 ANADARKO E&P ONSHORE LLC 493,587.00 365 0.00 0 0.00 0
2015 ANADARKO E&P ONSHORE LLC 383,331.00 275 0.00 0 0.00 0
2016 ANADARKO E&P ONSHORE LLC 370,090.00 364 0.00 0 0.00 0
2017 ARD OPR LLC 315,805.78 365 0.00 0 0.00 0
2018 ARD OPR LLC 282,714.66 365 0.00 0 0.00 0
2019 ARD OPR LLC 251,622.53 365 0.00 0 0.00 0

For data sources see[6]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2012 ANADARKO E&P ONSHORE LLC Produced Fluid 522.23 Bbl REUSE OTHER THAN ROAD SPREADING
2013 ANADARKO E&P ONSHORE LLC Produced Fluid 968.76 Bbl REUSE OTHER THAN ROAD SPREADING
2014 ANADARKO E&P ONSHORE LLC Produced Fluid 607.43 Bbl REUSE OTHER THAN ROAD SPREADING
2015 ANADARKO E&P ONSHORE LLC Produced Fluid 216.10 Bbl REUSE OTHER THAN ROAD SPREADING
2015 ANADARKO E&P ONSHORE LLC Produced Fluid 200.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR119
2015 ANADARKO E&P ONSHORE LLC Produced Fluid 49.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123
2016 ANADARKO E&P ONSHORE LLC Produced Fluid 175.52 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123NC010
2016 ANADARKO E&P ONSHORE LLC Produced Fluid 272.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR123NW005
2016 ANADARKO E&P ONSHORE LLC Produced Fluid 128.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123
2016 ANADARKO E&P ONSHORE LLC Produced Fluid 33.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123
2016 ANADARKO E&P ONSHORE LLC Produced Fluid 105.00 Bbl STORAGE PENDING DISPOSAL OR REUSE
2016 ANADARKO E&P ONSHORE LLC Produced Fluid 33.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC010
2017 ANADARKO E&P ONSHORE LLC Produced Fluid 46.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW005
2017 ARD OPR LLC Produced Fluid 42.33 Bbl REUSE (AT WELL PAD)
2017 ANADARKO E&P ONSHORE LLC Produced Fluid 78.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC010
2017 ANADARKO E&P ONSHORE LLC Produced Fluid 33.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123
2018 ARD OPR LLC Produced Fluid 148.51 Bbl REUSE (AT WELL PAD)
2019 ARD OPR LLC Produced Fluid 205.95 Bbl REUSE (AT WELL PAD)

For data sources see[7]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
1925065 Primary Facility 2010-10-25 Routine/Complete Inspection No Violations Noted
1939267 Primary Facility 2010-12-22 Routine/Partial Inspection No Violations Noted
1941588 Primary Facility 2011-01-07 Follow-up Inspection No Violations Noted
1945778 Primary Facility 2011-01-26 Routine/Partial Inspection No Violations Noted
1949093 Primary Facility 2011-02-07 Follow-up Inspection No Violations Noted
1952589 Primary Facility 2011-02-25 Follow-up Inspection No Violations Noted
2027279 Primary Facility 2011-12-06 Routine/Complete Inspection No Violations Noted
2075163 Primary Facility 2012-05-25 Routine/Partial Inspection No Violations Noted Site has achieved 70% veg. cover
2177013 Primary Facility 2013-06-20 Routine/Complete Inspection No Violations Noted
2487149 Primary Facility 2016-05-19 Routine/Complete Inspection No Violations Noted
2773734 Primary Facility 2018-08-31 Routine/Complete Inspection No Violations Noted Department representative Sue Herzing conducted a routine site inspection at ARD Operating's COP 289 Pad B on August 31, 2018.

The site sign, PPC plan, site specific plan, monthly tank maintenance log, and weekly inspection log were onsite for review. There are 5 producing Marcellus wells (081-20181, 081-20191, 081-20192, 081-20193, and 081-20198) and 1 plugged well 081-20029 located on this well pad. The well pad remains at full built for production work purposes. PCSM infiltration berms have been installed. Area surrounding the well pad is very well vegetated.

No violations noted.

For data sources see[8]

References