37-081-20241

Well Details

Well ID: 37-081-20241
Loading map...
Country: United States
State: Pennsylvania
County: Lycoming
Municipality: Penn Township
Operator Name: EXCO RESOURCES PA LLC
Well Pad ID: 149017
Farm/Lease Name: PATTERSON UNIT 2H
License Status:
Spud Date:
Permit Date: 2009-12-22
Well Type: GAS
Unconventional Well: Y
Configuration: Horizontal Well
Conservation: No
Latitude: 41.275677
Longitude: -76.650126

For data sources see[1][2][3]

Well History

Date Event
2009-12-22 New Permit Application
2010-02-01 Performed Spud Operation
2010-03-02 Drilling Completion
2010-07-25 Perforation
2010-09-23 DEVIATED

For data sources see[4]


Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2009 CHIEF OIL & GAS LLC 0.00 0 0.00 0 0.00 0
2010 CHIEF OIL & GAS LLC 395,890.00 88 0.00 0 0.00 0
2011 EXCO RESOURCES PA LLC 1,060,022.00 305 0.00 0 0.00 0
2012 EXCO RESOURCES PA LLC 984,830.00 366 0.00 0 0.00 0
2013 EXCO RESOURCES PA LLC 699,762.00 365 0.00 0 0.00 0
2014 EXCO RESOURCES PA LLC 633,648.00 365 0.00 0 0.00 0
2015 EXCO RESOURCES PA LLC 440,242.00 320 0.00 0 0.00 0
2016 EXCO RESOURCES PA LLC 414,096.00 277 0.00 0 0.00 0
2017 EXCO RESOURCES PA LLC 452,158.00 337 0.00 0 0.00 0
2018 EXCO RESOURCES PA LLC 432,033.00 364 0.00 0 0.00 0
2019 EXCO RESOURCES PA LLC 390,673.00 363 0.00 0 0.00 0

For data sources see[5]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2010 CHIEF OIL & GAS LLC Produced Fluid 6,252.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR123SW018
2010 CHIEF OIL & GAS LLC Drilling Fluid Waste 162.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR123SW018
2010 CHIEF OIL & GAS LLC Fracing Fluid Waste 2,199.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0008451
2010 CHIEF OIL & GAS LLC Drilling Fluid Waste 1,253.50 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0008451
2010 CHIEF OIL & GAS LLC Produced Fluid 128.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0008451
2011 CHIEF OIL & GAS LLC Fracing Fluid Waste 100.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR119
2011 CHIEF OIL & GAS LLC Produced Fluid 830.90 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR119
2011 EXCO RESOURCES PA LLC Produced Fluid 238.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0101508
2011 EXCO RESOURCES PA LLC Produced Fluid 119.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PAS2D205BCLE
2011 EXCO RESOURCES PA LLC Produced Fluid 357.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0008451
2012 EXCO RESOURCES PA LLC Produced Fluid 54.76 Bbl REUSE OTHER THAN ROAD SPREADING
2012 EXCO RESOURCES PA LLC Produced Fluid 385.70 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR119
2013 EXCO RESOURCES PA LLC Produced Fluid 54.76 Bbl STORAGE PENDING DISPOSAL OR REUSE
2013 EXCO RESOURCES PA LLC Produced Fluid 204.76 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR119
2013 EXCO RESOURCES PA LLC Produced Fluid 23.80 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR119
2013 EXCO RESOURCES PA LLC Produced Fluid 57.14 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123NC009
2014 EXCO RESOURCES PA LLC Produced Fluid 126.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR119
2014 EXCO RESOURCES PA LLC Produced Fluid 27.40 Bbl INJECTION DISPOSAL WELL PAS2D205BCLE
2014 EXCO RESOURCES PA LLC Produced Fluid 1,665.20 Bbl STORAGE PENDING DISPOSAL OR REUSE
2014 EXCO RESOURCES PA LLC Produced Fluid 15.50 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123NC024
2014 EXCO RESOURCES PA LLC Produced Fluid 1,503.70 Bbl REUSE OTHER THAN ROAD SPREADING
2014 EXCO RESOURCES PA LLC Produced Fluid 154.70 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123NC010
2015 EXCO RESOURCES PA LLC Produced Fluid 164.80 Bbl INJECTION DISPOSAL WELL PAS2D205BCLE
2015 EXCO RESOURCES PA LLC Produced Fluid 2,193.50 Bbl REUSE OTHER THAN ROAD SPREADING
2016 EXCO RESOURCES PA LLC Produced Fluid 220.00 Bbl INJECTION DISPOSAL WELL PAS2D205BCLE
2017 EXCO RESOURCES PA LLC Produced Fluid 819.50 Bbl INJECTION DISPOSAL WELL PAS2D205BCLE
2018 EXCO RESOURCES PA LLC Produced Fluid 135.00 Bbl INJECTION DISPOSAL WELL PAS2D205BCLE
2018 EXCO RESOURCES PA LLC Produced Fluid 122.90 Bbl REUSE (AT WELL PAD)
2018 EXCO RESOURCES PA LLC Produced Fluid 121.40 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC010
2019 EXCO RESOURCES PA LLC Produced Fluid 227.00 Bbl INJECTION DISPOSAL WELL PAS2D205BCLE
2019 EXCO RESOURCES PA LLC Produced Fluid 80.00 Bbl REUSE (AT WELL PAD)

For data sources see[6]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
1862155 Primary Facility 2010-02-09 Routine/Complete Inspection No Violations Noted
1865827 Primary Facility 2010-02-16 Drilling/Alteration Violation(s) Noted
1929614 Primary Facility 2010-11-15 Follow-up Inspection No Violations Noted
1941449 Primary Facility 2011-01-05 Routine/Complete Inspection No Violations Noted
1961804 Primary Facility 2011-03-30 Routine/Partial Inspection No Violations Noted
1965853 Primary Facility 2011-01-14 Routine/Complete Inspection No Violations Noted
1966510 Primary Facility 2011-04-18 Routine/Complete Inspection No Violations Noted
2060351 Primary Facility 2012-04-17 Routine/Complete Inspection No Violations Noted
2062941 Primary Facility 2012-04-25 Routine/Complete Inspection No Violations Noted
2092499 Primary Facility 2012-08-15 Routine/Complete Inspection No Violations Noted
2116530 Primary Facility 2012-11-15 Incident- Response to Accident or Event No Violations Noted
2120889 Primary Facility 2012-12-04 Compliance Evaluation No Violations Noted
2462734 Primary Facility 2016-03-09 Routine/Complete Inspection Violation(s) Noted Methane monitoring yielded 4% on 13-3/8" x 9-5/8" annulus
2543924 Primary Facility 2016-12-08 Routine/Complete Inspection No Violations Noted Routine Inspection; 12/8/2016. I entered the location at 09:57 and began the inspection. At the time of the inspection, the Patterson Unit 1H (081-20240), 2H (081-20241), 4H (081-20243), and 5H (081-20244) wells were in production. The well pad area was well vegetated and can be considered permanently stabilized. The well site has not been restored and the Well Site Compliance Information Request reply (submitted 9/21/2015) says the well site has been restored and the Notice of Termination was to be submitted in September of 2015. The well pad remains at its original size and the site currently does not conform to the permitted restoration plan. The original ESCGP has been expired since 11/23/2014.
The Department considers a well site to be restored under Section 3216(c) of the 2012 Oil and Gas Act when the oil or gas owners or operators meet the following:
1. All permanent post construction stormwater control features as identified in the Post Construction Stormwater Management/Site Restoration Pla
2577272 Primary Facility 2017-03-28 Routine/Complete Inspection Outstanding Violations - Viols Req'd Arrived @ 10:00. Weather: cloudy, warm, light rain. There are 4 wells capable of production on location. At the time of my inspection the 1H and 2H were in production, 4H and 5H were locked and shut-in. There were 3 annular vent pipes at each well. All well cellars were filled with gravel. The annuli for the 2H were configured differently, but for the other wells, the 20” x 13-3/8” and 13-3/8” x 9-5/8” were open and the 9-5/8” x 5-1/2” was plumbed to a dump line. The annuli were monitored with an Altair 5X gas meter calibrated on 03/28/17. No combustible gas was detected at the annuli of the: 1H, 4H, and 5H. The annuli for the 2H were linked together and it was not possible at the time of my inspection to test for gas (see photo).

Patterson 1H: top gauge: 300 psi (0-5000 analog) Patterson 2H; top gauge: 300 psi (0-3000 analog) No new violations were observed during this inspection. The result for this inspection is OUTST, for outstanding violation because a violation for defective cement was cited on 3/9/1

2584429 Primary Facility 2017-04-18 Follow-up Inspection Outstanding Violations - Viols Req'd : Arrived @ 8:30. Weather sunny. Met with Bird Smith and Bobby Hamel (EXCO) to better understand the Patterson 2H annular venting configuration observed in my previous inspection (03/28/17, IR#: 2577272). For the 2H annuli, ¼” stainless tubing connected the 20” x 13-3/8” and 13-3/8” x 9-5/8” to the 9-5/8” x 5-1/2” annular vent. Needle valves on the ¼” could isolate any annulus. The well tender, Bobby Hamel, explained that he added the tubing to allow more control for monitoring or sample collection following my inspection of 3/9/16 which cited a violation of defective cement because methane was detected on the 13-3/8” x 9-5/8” annulus (IR# 2462734). Field monitoring of the annular vents (Altair 5X gas meter calibrated on 4/11/17) did not detect combustible gas on the 20” x 13-3/8” and 13-3/8” x 9-5/8”. For the 9-5/8” x 5-1/2” annulus, 20% combustible gas was detected. The result of this inspection is OUTST, for outstanding violation, because a violation for defective cement was cited on 3/9/16 (IR# 2462734)
2679414 Primary Facility 2018-01-03 Routine/Complete Inspection No Violations Noted Arrived at 15:00. 4 wells on location, 1H and 2H producing, 4H and 5H locken and shut-in. All wells on active status. Followed up with Bird Smith who said that wells produce large amounts of water, so production is limited.
2694385 Primary Facility 2018-02-14 Routine/Complete Inspection No Violations Noted Weather was 30° and cloudy at time of inspection. Met with lease operator Bobby Hamel on location at time of inspection. Well had an analog pressure gauge attached above the swab valve. Pressure was approximately 270 psi at time of inspection. There were three annulus vents plumbed to surface. The 5 1/2 x 9 5/8 annulus vent was plumbed across location to the produced water tanks. The 9 5/8 x 13 3/8 and 13 3/8 x 20 annulus vents were open and 0% combustible gas was detected at time of inspection. No violations were noted at time of inspection.
2832709 Primary Facility 2019-01-28 Routine/Complete Inspection No Violations Noted On January 28, 2019, Department representative Brad Kline conducted a routine site inspection at EXCO Resources, LLC. Patterson Unit 1 pad. Site inspection log was onsite for review. No E&S issues were observed during the time of inspection. The site is stable and well vegetated meeting the 70% uniform, perennial, vegetative cover.

There are a total of 4 producing wells located on this well pad. All wells are tagged with API/well permit numbers. Well cellars are filled in with gravel. There are 4 GPU’s and 2 steel vertical production fluids tanks onsite. Production fluid tanks and GPUs were stationed in separate secondary containment.

No violations noted. The Department recommends submitting a Notice of Termination and a Post-Drilling Well Site Restoration Report when the criteria are met and weather conditions permit.

Violations Commited

Inspection ID Violation ID Violation Date Date Resolved Violation Code Violation Type Violation Comments
1865827 582190 02/16/2010 2010-02-16 201G - Failure to post permit number, operator name, address, telephone number in a conspicuous manner at the site during drilling Administrative
2462734 753751 2016-03-09 78.86 Environmental Health & Safety 13-3/8-9-5/8" annular vent monitoring yields 4% methane
2577272 782214 2016-03-09 78.86 Environmental Health & Safety 5% methane on the 13-3/8" x 9-5/8" annulus.
2584429 783541 2016-03-09 78.86 Environmental Health & Safety

For data sources see[7]

References