If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 37-081-20544 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.434631,"lon":-76.899964,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Lycoming | |
Municipality: Cascade Township | |
Operator Name: ARD OPR LLC | |
Well Pad ID: 145763 | |
Farm/Lease Name: EUGENE NELSON A 4H | |
License Status: Plugged and Abandoned | |
Spud Date: 2011-09-17 | |
Permit Date: 2011-03-22 | |
Well Type: GAS | |
Unconventional Well: Y | |
Configuration: Vertical Well | |
Conservation: Yes | |
Latitude: 41.434631 | |
Longitude: -76.899964 |
Date | Event |
---|---|
NEWLY DRILLED | |
2011-03-22 | New Permit Application |
2011-09-17 | Drilling Completion |
2011-09-18 | Performed Spud Operation |
2013-07-22 | New Permit Application |
2014-11-23 | Begin Plugging |
2014-11-23 | Finished Plugging |
2019-03-07 | Fully Plugged |
For data sources see[4]
Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
---|---|---|---|---|---|---|---|
2011 | ANADARKO E&P ONSHORE LLC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2012 | ANADARKO E&P ONSHORE LLC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2013 | ANADARKO E&P ONSHORE LLC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2014 | ANADARKO E&P ONSHORE LLC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2015 | ANADARKO E&P ONSHORE LLC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2016 | ANADARKO E&P ONSHORE LLC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2017 | ARD OPR LLC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
For data sources see[5]
Period | Operator | Waste Type | Quantity | Disposal Method | Waste Facility ID |
---|---|---|---|---|---|
2011 | ANADARKO E&P ONSHORE LLC | Drill Cuttings | 10.70 Tons | LANDFILL | 100955 |
For data sources see[6]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
2052988 | Primary Facility | 2012-03-21 | Routine/Partial Inspection | No Violations Noted | |
2077406 | Primary Facility | 2012-06-18 | Routine/Complete Inspection | No Violations Noted | |
2240414 | Primary Facility | 2014-01-27 | Drilling/Alteration | No Violations Noted | |
2322945 | Primary Facility | 2014-11-20 | Routine/Complete Inspection | No Violations Noted | |
2485598 | Primary Facility | 2016-05-17 | Routine/Complete Inspection | No Violations Noted | Routine Inspection; 5/17/2016.
I entered the location at 09:48 and began the inspection. At the time of the inspection, the Eugene P. Nelson A 3H (081-20526), 4H (081-20544), and 202H (081-21256) wells were in production. The well pad area and access road are all stabilized and no erosion was noted. The well site remains at its originally constructed size and has not been restored according to the PCSM (Post Construction Stormwater Management) plan in the ESCGP. The ESCGP expired on 8/16/2015. The revised restoration assessment indicates this site will be re-permitted sometime in 2016 and those revisions will be implemented sometime in 2017. The Department considers a well site to be restored under Section 3216(c) of the 2012 Oil and Gas Act when the oil or gas owners or operators meet the following: 1. All permanent post construction stormwater control features as identified in the Post Construction Stormwater Management/Site Restoration Plan are in place. 2. Remaining impervious areas are minimiz |
2580736 | Primary Facility | 2017-03-28 | Routine/Complete Inspection | No Violations Noted | |
2724151 | Primary Facility | 2018-04-26 | Plugging(Includes Plugged/Mined Through) | No Violations Noted | A routine inspection of the Eugene Nelson A 4H was conducted April 26, 2018. The purpose of the site visit is to confirm and inspect the plugging of this well after receiving a certificate of well plugging earlier this week. At the time of inspection; the well was a conductor only with a plate on top, cut below grade in a cellar with a 2" candy cane vent installed extending above ground level with a marker as a plugged well monument. No obvious issues were observed at the plugged well. The well was plugged 11/23/2014 according to the certificate of well plugging submitted. |
2785141 | Primary Facility | 2018-10-05 | Routine/Complete Inspection | No Violations Noted | Two wells staged for production phase. Two each sand and water separators. No leaks detected from production equipment. No violations noted.
Maintenance on a pneumatic regulator valve was being performed by the well tender. |
For data sources see[7]