Well Details

Well ID: 37-081-20676
Loading map...
Country: United States
State: Pennsylvania
County: Lycoming
Municipality: Cummings Township
Operator Name: ARD OPR LLC
Well Pad ID: 148079
Farm/Lease Name: COP TRACT 356 G 1040H
License Status: Plugged and Abandoned
Spud Date: 2012-01-06
Permit Date: 2011-08-11
Well Type: GAS
Unconventional Well: Y
Configuration: Horizontal Well
Conservation: No
Latitude: 41.334456
Longitude: -77.349394

For data sources see[1][2][3]

Well History

Date Event
2011-08-11 New Permit Application
2012-01-06 Drilling Completion
2012-01-06 Performed Spud Operation
2012-11-08 Begin Plugging
2012-11-21 Finished Plugging
2013-05-23 NEWLY DRILLED
2014-10-01 New Permit Application

For data sources see[4]


Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2011 ANADARKO E&P ONSHORE LLC 0.00 0 0.00 0 0.00 0
2012 ANADARKO E&P ONSHORE LLC 0.00 0 0.00 0 0.00 0
2014 ANADARKO E&P ONSHORE LLC 0.00 0 0.00 0 0.00 0
2015 ANADARKO E&P ONSHORE LLC 0.00 0 0.00 0 0.00 0
2016 ANADARKO E&P ONSHORE LLC 0.00 0 0.00 0 0.00 0
2017 ARD OPR LLC 0.00 0 0.00 0 0.00 0
2018 ARD OPR LLC 550,238.09 139 0.00 0 0.00 0
2019 ARD OPR LLC 853,239.85 365 0.00 0 0.00 0

For data sources see[5]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2014 ANADARKO E&P ONSHORE LLC Drill Cuttings 1,021.00 Tons LANDFILL 301626
2018 ARD OPR LLC Produced Fluid 9,078.15 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC010
2018 ARD OPR LLC Synthetic Liner Materials 21.67 Tons LANDFILL 100955
2018 ARD OPR LLC Produced Fluid 681.03 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123
2018 ARD OPR LLC Produced Fluid 7,172.66 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR119
2018 ARD OPR LLC Produced Fluid 10,172.35 Bbl REUSE (AT WELL PAD)
2018 ARD OPR LLC Produced Fluid 1,149.77 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW011
2019 ARD OPR LLC Produced Fluid 2,401.21 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC010
2019 ARD OPR LLC Synthetic Liner Materials 0.84 Tons LANDFILL 100955
2019 ARD OPR LLC Drilling Fluid Waste 25.20 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123
2019 ARD OPR LLC Produced Fluid 7,737.46 Bbl REUSE (AT WELL PAD)
2019 ARD OPR LLC Produced Fluid 117.99 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123
2019 ARD OPR LLC Servicing Fluid 31.00 Bbl REUSE (AT WELL PAD)
2019 ARD OPR LLC Other Oil & Gas Wastes 58.83 Bbl REUSE (AT WELL PAD)
2019 ARD OPR LLC Produced Fluid 530.41 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC018

For data sources see[6]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
2113473 Primary Facility 2012-10-25 Routine/Complete Inspection No Violations Noted 1037-1040H cellars, conductor, and mousehole set. No E&S issues
2123782 Primary Facility 2012-12-14 Plugging(Includes Plugged/Mined Through) No Violations Noted
2312975 Primary Facility 2014-10-15 Routine/Complete Inspection No Violations Noted
2322515 Primary Facility 2014-11-19 Drilling/Alteration No Violations Noted
2347982 Primary Facility 2015-02-24 Routine/Complete Inspection No Violations Noted At the time of inspection sunny sky, ~15” snow cover and 5 degrees F.
2467447 Primary Facility 2016-03-22 Routine/Complete Inspection No Violations Noted
2496247 Primary Facility 2016-06-07 Routine/Complete Inspection No Violations Noted Routine inspection of unconventional well for inactive status application. No violations noted at this time.
2701095 Primary Facility 2018-02-21 Routine/Complete Inspection No Violations Noted 2/21/2018; routine inspection.

I met with Ben Gamble (DCNR) at approximately 09:05 and we met with the company man (Bryan Billiot) and we walked the site. At the time of the inspection, Keane was onsite to complete several wells which were previously drilled to TD. The COP Tract 356 G 1039H well was being prepared for the first stage of the frac. The site containment was in good condition and foam berms were adequate. The containment berms were of different heights at several locations causing some confusion about the containment. I recommend evaluating the containment at the flowback tanks in the future. I also talked to Carl Wool from Keane concerning individual containments under equipment and general practices. No violations noted.

2744757 Primary Facility 2018-06-20 Routine/Complete Inspection No Violations Noted Site active, moving equipment. No company man on location. Containment appeared to be in good condition. Several spots on the liner had puddles that exhibited elevated conductivity (3.2- greater than 19.99 mS/cm), with no evidence of the same on the pad surface. I recommend that the containment continue to be vacced regularly.
2758536 Primary Facility 2018-07-30 Routine/Complete Inspection No Violations Noted Weather was 71° and raining at time of inspection. Met with Alta representative Charles Egli on location. Well was shut in at time of inspection. Well had recently been stimulated by hydraulic fracturing. Crews were on location welding and hooking up Gas production equipment. Well was locked out and tagged out. There was no tag on the well at time of inspection. I received a call recently from Rick Hall that new metal tags were in the process of being made and attached. There was one annulus vent that was plumbed to surface that was shut in at time of inspection. No violations noted at time of inspection.
2781604 Primary Facility 2018-09-26 Routine/Complete Inspection No Violations Noted Arrived on site for routine inspection of pads F & G. Pad F is currently empty but appears stable. Wells on pad G were somewhat recently altered/stimulated.

Several temporary flowback tanks were onsite at the time of inspection. The tanks were in good condition and in secondary containment.

It appears that wells 1039H, 1040H, 1041H are staged for production and 1037H, 1042H have been granted inactive status. There are 4 produced water tanks onsite and in secondary containment. There are also 4 GPUs onsite and in secondary containment.

There is an additional unlabeled storage tank not in secondary containment. There are also wells that appear to be missing proper tags (Photos #11, 12, 13, 14). The missing tags have been previously noted in inspection #2758529 on 7/30/18. Spoke to Rick Hall on 9/28/18; the tags are made and will be installed after the well heads are painted.

Overall all the site is well vegetated and appears stable. Secondary containment is in good condition except for one area on the east

2825995 Primary Facility 2019-01-10 Routine/Complete Inspection No Violations Noted On January 10, 2019, Department representative Brad Kline conducted a routine site inspection at ARD Operating , LLC. COP Tract 356 Pad F & G. No E&S issues were observed during the time of inspection. The site is stable and well vegetated meeting the 70% uniform, perennial, vegetative cover.

There are a total of 5 producing wells located on this well pad. All wells are tagged with API/well permit numbers. No bubbling within the cellars was observed. There are 5 GPU’s and 4 steel vertical production fluids tanks onsite. Production fluid tanks and flowback tanks were stationed in secondary containment.

Pad G has no wells drilled on it, but appears to be stable.

No violations noted.

For data sources see[7]