Well Details

Well ID: 37-081-21011
Loading map...
Country: United States
State: Pennsylvania
County: Lycoming
Municipality: Cogan House Township
Operator Name: ARD OPR LLC
Well Pad ID: 148484
Farm/Lease Name: HARRY W STRYKER A 5H
License Status: INACTIVE
Spud Date:
Permit Date: 2012-09-19
Well Type: GAS
Unconventional Well: Y
Configuration: Horizontal Well
Conservation: No
Latitude: 41.422389
Longitude: -77.187822

For data sources see[1][2][3]

Well History

Date Event
2012-09-19 New Permit Application
2013-01-24 Performed Spud Operation
2013-03-23 Drilling Completion
2015-04-30 DEVIATED

For data sources see[4]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2018-06-26 2018-07-03 7,358 11,041,100 0

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 HCl, 5.1 - 7.5 BJ Services Acidizing MSDS and NON-MSDS are listed below the green line. Listed Below 0 0.674527 743868
Crystalline Silica (Quartz) 14808-60-7 100 15.5716 17,172,300.0
Acrylamide Modified Acrylic Polymer 38193-60-1 60 0.0768334 84731.9
Olefin 64743-02-8 5 0.00005652 62.3251
Citric Acid 77-92-9 60 0.00294935 3252.54
Sorbian, mono-(9Z)-9octadecenoate 1338-43-8 5 0.00640278 7060.99
2-propenoic, polymer with sodium phosphinate, sodium salt 71050-62-9 20 0.00519454 5728.54
Sodium Chloride 7647-14-5 5 0.00666251 7347.42
Glutaraldehyde 111-30-8 10 0.00195058 2151.1
Ethanol 64-17-5 5 0.000975292 1075.55
Polyoxyalkylenes 68951-67-7 30 0.000339092 373.95
Formaldehyde 50-00-0 1 0.00001130 12.465
Oxyalkylated Alcohol 78330-21-9 5 0.00640278 7060.99
Propargyl Alcohol 107-19-7 5 0.00005652 62.3251
Sorbitan monooleate ethoxylate 9005-65-6 5 0.00640278 7060.99
Modified Thiourea Polymer 68527-49-1 7 0.00007912 87.2551
Hydrochloric Acid 7647-01-0 7.5 0.0525401 57941.2
Calcium Chloride 10043-52-4 5 0.00129863 1432.14
Ethylene Glycol 107-21-1 30 0.00779181 8592.81
Potassium Chloride 7447-40-7 1 0.000259727 286.427
Methanol 67-56-1 100 0.00113031 1246.5
Benzyl-(C12-C16 Alkyl)-Dimethyl-Ammonium Chloride 68424-85-1 30 0.00585175 6453.31
Fatty Acids 61790-12-3 10 0.000113031 124.65
Petroleum distillates 64742-47-8 30 0.0384167 42366
Acetic acid, Potassium Salt 64-19-7 0.1 0.000128056 141.22
Acetic acid 127-08-2 1 0.00128056 1412.2
Ammonium Persulfate 7727-54-0 100 0.00199492 2200
Tetrasodium EDTA 64-02-8 0.1 0.000128056 141.22
Water Operator Carrier Water 7732-18-5 100 83.4772 92,058,700.0
ThinFrac MP BJ Services Friction Reducer MSDS and NON-MSDS are listed below the green line. Listed Below 0 0.219231 241768
FraCare SI 720 BJ Services Scale Inhibitor MSDS and NON-MSDS are listed below the green line. Listed Below 0 0.0277908 30647.7
Other Chemical(s) BJ Services See Trade Name(s) List Water 7732-18-5 92.5 0.72793 802761
GBW-5 BJ Services Breaker MSDS and NON-MSDS are listed below the green line. Listed Below 0 0.00199492 2200
Sand, White BJ Services Proppant MSDS and NON-MSDS are listed below the green line. Listed Below 0 15.5716 17,172,300.0
CI-14 BJ Services Corrosion Inhibitor MSDS and NON-MSDS are listed below the green line. Listed Below 0 0.00180849 1994.4
ResCare IC 300L BJ Services Iron Control MSDS and NON-MSDS are listed below the green line. Listed Below 0 0.00540714 5963
BIOC11139A BJ Services Biocide MSDS and NON-MSDS are listed below the green line. Listed Below 0 0.0204811 22586.6

For data sources see[5]

Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2013 ANADARKO E&P ONSHORE LLC 0.00 0 0.00 0 0.00 0
2014 ANADARKO E&P ONSHORE LLC 0.00 0 0.00 0 0.00 0
2015 ANADARKO E&P ONSHORE LLC 0.00 0 0.00 0 0.00 0
2016 ANADARKO E&P ONSHORE LLC 0.00 0 0.00 0 0.00 0
2017 ARD OPR LLC 0.00 0 0.00 0 0.00 0
2018 ARD OPR LLC 680,103.07 81 0.00 0 0.00 0
2019 ARD OPR LLC 2,225,723.27 365 0.00 0 0.00 0

For data sources see[6]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2013 ANADARKO E&P ONSHORE LLC Drill Cuttings 321.19 Tons LANDFILL 301626
2013 ANADARKO E&P ONSHORE LLC Drill Cuttings 406.51 Tons LANDFILL 100955
2018 ARD OPR LLC Produced Fluid 2,258.61 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC010
2018 ARD OPR LLC Produced Fluid 254.22 Bbl INJECTION DISPOSAL WELL 34-031-27177
2018 ARD OPR LLC Produced Fluid 428.62 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123
2018 ARD OPR LLC Unused Fracturing Fluid Waste 7.61 Tons LANDFILL 100955
2018 ARD OPR LLC Synthetic Liner Materials 2.04 Tons LANDFILL 100955
2018 ARD OPR LLC Produced Fluid 7,009.85 Bbl REUSE (AT WELL PAD)
2018 ARD OPR LLC Produced Fluid 984.96 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW011
2018 ARD OPR LLC Produced Fluid 82.60 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR119
2018 ARD OPR LLC Produced Fluid 353.81 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC018
2019 ARD OPR LLC Produced Fluid 122.88 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC010
2019 ARD OPR LLC Synthetic Liner Materials 0.56 Tons LANDFILL 100955
2019 ARD OPR LLC Drilling Fluid Waste 28.80 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123
2019 ARD OPR LLC Produced Fluid 5,299.86 Bbl REUSE (AT WELL PAD)
2019 ARD OPR LLC Produced Fluid 108.03 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123
2019 ARD OPR LLC Produced Fluid 17.40 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR119
2019 ARD OPR LLC Servicing Fluid 7.00 Bbl REUSE (AT WELL PAD)
2019 ARD OPR LLC Other Oil & Gas Wastes 165.05 Bbl REUSE (AT WELL PAD)
2019 ARD OPR LLC Produced Fluid 2,193.08 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC018
2019 ARD OPR LLC Synthetic Liner Materials 1.08 Tons LANDFILL 301358

For data sources see[7]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
2141268 Primary Facility 2013-02-20 Routine/Complete Inspection No Violations Noted
2153349 Primary Facility 2013-04-02 Drilling/Alteration No Violations Noted
2216089 Primary Facility 2013-10-23 Routine/Complete Inspection No Violations Noted flowing-back. small tear in liner no vio.
2521509 Primary Facility 2016-09-15 Routine/Complete Inspection No Violations Noted Routine Inspection; 9/15/2016.

I entered the location at 13:55 and began the inspection. At the time of the inspection, the four wells onsite are on inactive status (081-20501, 081-20502, 081-21011, and 081-21012). The well pad surface was overgrown but in good condition and no E&S issues were observed. The site has no active well permits that have not been drilled.

ESX11-081-0127 expires on 11/2/2016. The well site has not been restored and PCSM requirements have not been met. Anadarko’s most recent restoration timeline submission indicates PCSM will be permitted in 2016 and installed in 2017.

The Department considers a well site to be restored under Section 3216(c) of the 2012 Oil and Gas Act when the oil or gas owners or operators meet the following:

1. All permanent post construction stormwater control features as   the Post Construction Stormwater Management/Site Restoration Plan are in place.

2. Remaining impervious areas are minimized. See Section 102.8 (b)(4). Impervious areas include, but

2528570 Primary Facility 2016-10-03 Routine/Complete Inspection No Violations Noted routine inspection
2755603 Primary Facility 2018-07-13 Routine/Complete Inspection No Violations Noted Routine Inspection; 7/13/2018.

We entered the site and talked to Merek Romatowski (Company Man). Mr. Romatowski said they were under pressure on stage 22 of 26 on the Harry Stryker A 2H (081-20501). The containment at the ramps over the containment berm has been damaged and has a few small holes but has clearly been patched several times already. I recommend continuing to monitor and repair containment as needed. A soft spot under containment was noted southeast of the wellheads. I recommend monitoring this area as it does appear to be in the travel lane on containment and more susceptible to damage. No violations noted.

2759774 Primary Facility 2018-08-01 Routine/Complete Inspection No Violations Noted I met Rodney Blanton of ARD when I arrived. The frac was active, with 17 of 26 stages completed on the 6H well. BJ Services was performing the frac. I walked the site with Rodney, testing conductivity in the numerous puddles on the pad and locations on containment. Puddles on the pad were from .35-.675 mS/cm, and water on containment was from .15-1.5 mS/cm. Rodney informed me that he had a vac truck working at the blender constantly to clean up the area. Sitewide and secondary containments appeared to be in good condition.
2831859 Primary Facility 2019-01-25 Routine/Complete Inspection No Violations Noted Weather was 21°, sunny and windy at time of inspection. There were no Alta representatives on location at time of inspection. There was no wind sock on location at time of inspection. There was a west wind blowing an estimated 10-15 mph. No odors were noted anywhere on location at time of inspection. There were 2 trucks on location that were hauling away produced water at time of inspection. There was no visible evidence of any spillage during transfer of water from the tanks to the trucks. Walked around location with an Altair 5x multi-gas meter that was calibrated on 1/23/2019. 0% combustible gas was detected anywhere on location at time of inspection. Well had digital pressure monitoring equipment attached to the production casing, the production tubing, and the production annulus vent. Tubing pressure was 1407 psi, casing pressure was 2177 psi and annulus pressure was 402 psi at time of inspection. There were no other annulus vents plumbed to surface. No violations were noted at time of inspection.

For data sources see[8]

References