X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

37-081-21092

Well Details

Well ID: 37-081-21092
Loading map...
Country: United States
State: Pennsylvania
County: Lycoming
Municipality: Upper Fairfield Township
Operator Name: INFLECTION ENERGY (PA) LLC
Well Pad ID: 149482
Farm/Lease Name: ULTIMATE WARRIOR 1HA
License Status:
Spud Date:
Permit Date: 2012-12-24
Well Type: GAS
Unconventional Well: Y
Configuration: Horizontal Well
Conservation: No
Latitude: 41.285789
Longitude: -76.911942

For data sources see[1][2][3]

Well History

Date Event
2012-12-24 New Permit Application
2013-01-03 Performed Spud Operation
2013-03-06 Drilling Completion
2013-04-26 Perforation
2014-12-23 DEVIATED

For data sources see[4]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2013-04-23 2013-04-29 5,924 5,408,170 0

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Water Customer & CWS Base Fluid & Mix Water Water 7732-18-5 100 89.2316 45,219,500.0
Sand (Proppant), DAP-901, DAP-925,
DWP-111, DWP-612, DWP-901,
BioClear 2000, Hydrochloric Acid
CWS Propping Agent, Scale Inhibitor, Acid Corrosion Inhibitor, Gel Slurry, Friction Reducer, Breaker, Biocide, Clean Perforations Organic phosphonate 1 Proprietary 30 0.00324 1640.54
Quaternary ammonium compounds,
bis(hydrogenated tallow alkyl)dimethyl,
salts with bentonite
68953-58-2 5 0.00016 79.55
Ammonium chloride 12125-02-9 10 0.00065 328.11
Paraffinic hydrocarbon solvent 64742-47-8 30 0.02034 10306.8
Calcite 471-34-1 1 0.02057 10422.6
Organic phosphonate 2 Proprietary 10 0.00108 546.85
Oxirane, 2-methyl-, polymer with oxirane, monodecyl ether 37251-67-5 1.5 0.00005000 23.87
Crystalline silica (Quartz) 14808-60-7 100 10.5535 5,348,140.0
Oxyalkylated polyamine Proprietary 5 0.00054 273.42
2,2-Dibromo-3-Nitrilopropionamide 10222-01-2 20 0.00571 2895.65
Biotite 1302-27-8 0.1 0.00177 897.15
Guar gum 9000-30-0 60 0.00188 954.63
Polyoxyalkylenes surfactant Proprietary 5 0.00339 1717.81
Amine salt Proprietary 5 0.00054 273.42
Ammonium Persulfate 7727-54-0 100 0.00027 135
Methanol 67-56-1 60 0.00331 1675.96
Illite 12173-60-3 1 0.00214 1082.26
Polyacrylamide polymer Proprietary 40 0.02712 13742.5
Hydrochloric acid 7647-01-0 37 0.1047 53059.5
Acetic acid 64-19-7 1 0.00011 54.68
Goethite 1310-14-1 0.1 0.00373 1889.78
Fatty acids Proprietary 30 0.00003000 17.71
Olefin Proprietary 5 0.00001000 2.95
Polyethylene glycol mixture 25322-68-3 70 0.00571 2895.65
Distillates (petroleum), hydrotreated middle 64742-46-7 60 0.00188 954.63
Formaldehyde 50-00-0 0.1 0.00002000 8.81
Apatite 64476-38-6 0.1 0.00177 897.15
Propargyl Alcohol 107-19-7 10 0.00001000 5.91
Modified thiourea polymer 68527-49-1 30 0.00003000 17.71
Ilmenite 98072-94-7 0.1 0.00079 400.84
Nonionic surfactant Proprietary 5 0.00339 1717.81
Polyoxyalkylenes Proprietary 30 0.00003000 17.71
Sodium chloride 7647-14-5 1 0.00001000 0.59

For data sources see[5]

Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2013 INFLECTION ENERGY LLC 604,205.00 217 0.00 0 0.00 0
2014 INFLECTION ENERGY (PA) LLC 678,734.00 356 0.00 0 0.00 0
2015 INFLECTION ENERGY (PA) LLC 459,988.29 358 0.00 0 0.00 0
2016 INFLECTION ENERGY (PA) LLC 245,677.56 355 0.00 0 0.00 0
2017 INFLECTION ENERGY (PA) LLC 160,686.00 359 0.00 0 0.00 0
2018 INFLECTION ENERGY (PA) LLC 117,429.00 203 0.00 0 0.00 0
2019 INFLECTION ENERGY (PA) LLC 149,510.63 364 0.00 0 0.00 0

For data sources see[6]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2013 INFLECTION ENERGY LLC Produced Fluid 878.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123NC010
2013 INFLECTION ENERGY LLC Produced Fluid 1,171.00 Bbl REUSE OTHER THAN ROAD SPREADING
2013 INFLECTION ENERGY LLC Produced Fluid 435.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123
2013 INFLECTION ENERGY LLC Produced Fluid 238.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123SW018
2014 INFLECTION ENERGY LLC Produced Fluid 435.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123
2014 INFLECTION ENERGY LLC Produced Fluid 878.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123NC010
2014 INFLECTION ENERGY LLC Produced Fluid 257.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123SW018
2014 INFLECTION ENERGY LLC Produced Fluid 1,171.00 Bbl REUSE OTHER THAN ROAD SPREADING
2015 INFLECTION ENERGY (PA) LLC Produced Fluid 296.43 Bbl REUSE OTHER THAN ROAD SPREADING
2016 INFLECTION ENERGY (PA) LLC Produced Fluid 232.34 Bbl REUSE OTHER THAN ROAD SPREADING
2017 INFLECTION ENERGY (PA) LLC Produced Fluid 82.50 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR119
2017 INFLECTION ENERGY (PA) LLC Produced Fluid 319.25 Bbl REUSE (AT WELL PAD)
2017 INFLECTION ENERGY (PA) LLC Produced Fluid 5.67 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC010
2017 INFLECTION ENERGY (PA) LLC Produced Fluid 28.05 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123
2017 INFLECTION ENERGY (PA) LLC Produced Fluid 346.00 Bbl REUSE OTHER THAN ROAD SPREADING
2018 INFLECTION ENERGY (PA) LLC Produced Fluid 80.00 Bbl REUSE (AT WELL PAD)
2018 INFLECTION ENERGY (PA) LLC Other Oil & Gas Wastes 83.33 Bbl REUSE (AT WELL PAD)
2019 INFLECTION ENERGY (PA) LLC Produced Fluid 103.33 Bbl REUSE (AT WELL PAD)
2019 INFLECTION ENERGY (PA) LLC Produced Fluid 46.67 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC018
2019 INFLECTION ENERGY (PA) LLC Other Oil & Gas Wastes 13.33 Bbl REUSE (AT WELL PAD)
2019 INFLECTION ENERGY (PA) LLC Other Oil & Gas Wastes 10.83 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR119

For data sources see[7]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
2132674 Primary Facility 2013-01-16 Routine/Complete Inspection No Violations Noted
2140799 Primary Facility 2013-02-19 Drilling/Alteration No Violations Noted
2145719 Primary Facility 2013-03-01 Routine/Complete Inspection No Violations Noted
2147750 Primary Facility 2013-03-08 Drilling/Alteration No Violations Noted
2153080 Primary Facility 2013-03-27 Routine/Complete Inspection No Violations Noted
2161621 Primary Facility 2013-04-15 Routine/Partial Inspection No Violations Noted Responded to ER notification of white powdery substance. fine white sand onsite, no dust, NoVio.
2170181 Primary Facility 2013-05-28 Routine/Complete Inspection No Violations Noted
2463879 Primary Facility 2016-03-08 Routine/Complete Inspection No Violations Noted Monitored annular vents with an Altair 5X meter calibrated on 03/01/2016:

20" x 13-3/8”: 0% methane, 13-3/8” x 9-5/8”: 0% methane, 9-5/8” x 5-1/2”: 7% methane. No violations were noted at the time of my inspection. Left location @ 12:10.

2465537 Primary Facility 2016-03-16 Routine/Complete Inspection No Violations Noted At the time of the inspection, 6 wells onsite were in production. The access road, well pad, and reserve pit remain installed as constructed. The Fresh Water Impoundment (FWI) has been removed and that area has been returned to approximate original contours. The entire permit area is currently well vegetated. No Violations Noted.
2514921 Primary Facility 2016-08-24 Routine/Complete Inspection No Violations Noted Routine Inspection; 8/24/2016.

I entered the site off SR 87 at 11:37 to evaluate Inflection Energy’s plan to discharge from the FWI (Fresh Water Impoundment) onsite. At the time of the inspection 6 wells onsite were in production. The dewatering plan indicated Option A will discharge water via a sprinkler system at approximately 57 GPM while Option B involves a filter bag dewatering structure to apply approximately 63 GPM. Overall, both area are well vegetated. The infiltration testing included with the plan demonstrates known rates of infiltration which do help evaluate application rates. The proposed discharge locations and application rates appear to be reasonable but I recommend monitoring the dewatering rate and adjusting accordingly. Please remember to notify the Department prior to discharging as indicated in your plan. No Violations Noted.

2780124 Primary Facility 2018-09-26 Routine/Complete Inspection No Violations Noted Six wells staged for production phase. Five each water separators within containment. No leaks detected from production equipment. No violations noted.
2780126 Primary Facility 2018-09-26 Routine/Complete Inspection No Violations Noted Six wells staged for production phase. Five each water separators within containment. No leaks detected from production equipment. No violations noted.
2840519 Primary Facility 2019-02-14 Routine/Complete Inspection No Violations Noted I arrived on site with Dave Hooker of the Department's Air Quality Program. Site was covered with icy snow. Production tank containment had 2-4" of ice and snow in it; one of the tanks had some minimal rust streaking, but the other two tanks appeared to be in pristine condition. Wells were tagged.

For data sources see[8]

References