If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 37-081-21112 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.444264,"lon":-76.864839,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Lycoming | |
Municipality: Cascade Township | |
Operator Name: ARD OPR LLC | |
Well Pad ID: 149066 | |
Farm/Lease Name: PLANTS EVERGREEN FARMS A 210H | |
License Status: | |
Spud Date: | |
Permit Date: 2013-01-31 | |
Well Type: GAS | |
Unconventional Well: Y | |
Configuration: Horizontal Well | |
Conservation: No | |
Latitude: 41.444264 | |
Longitude: -76.864839 |
Date | Event |
---|---|
2013-01-31 | New Permit Application |
2013-03-21 | Performed Spud Operation |
2013-05-28 | Drilling Completion |
2013-09-15 | Perforation |
2014-02-20 | DEVIATED |
For data sources see[4]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 2013-09-28 | 2013-10-04 | 6,769 | 2,853,210 | 0 |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | Sand (Proppant) | Trican Well Service | Proppant | Quartz | 14808-60-7 | 99 | 16.4555 | 4,734,240.0 |
Hexamethylenetretramine | 100-97-0 | 1 | 0.166217 | 47820.6 | ||||
AI-7NR | Trican Well Service | Corrosion Inhibitor | Prop-2-yn-1-ol | 107-19-7 | 1 | 0.00001914 | 5.508 | |
Bio-Clear 1000 | Trican Well Service | Biocide | 2,2-Dibromo-3-nitrilopropionamide | 10222-01-2 | 98 | 0.00008175 | 23.52 | |
Aqucar DB 5 | Trican Well Service | Biocide | Polyethylene glycol | 25322-68-3 | 65.2 | 0.02981 | 8576.34 | |
Sodium bromide | 7647-15-6 | 1.5 | 0.000685813 | 197.308 | ||||
Dibromoacetonitrile | 3252-43-5 | 50 | 0.0228604 | 6576.94 | ||||
2,2-Dibromo-3-nitrilopropionamide | 10222-01-2 | 5 | 0.00228604 | 657.694 | ||||
FR-15 | Trican Well Service | Friction Reducer | Paraffinic, Naphthenic Solvent | 64742-47-8 | 25 | 0.0163724 | 4710.34 | |
Proprietary Amide | Proprietary | 2.5 | 0.00163724 | 471.034 | ||||
Hydrochloric Acid (7.5%) | Trican Well Service | Acidizing | Hydrochloric Acid | 7647-01-0 | 7.5 | 0.0375569 | 10805.1 | |
Water | 7732-18-5 | 92.5 | 0.463201 | 133263 | ||||
FEAC-20 | Trican Well Service | Iron Control | Acetic Acid | 64-19-7 | 50 | 0.00225898 | 649.909 | |
Citric Acid | 77-92-9 | 30 | 0.00135539 | 389.945 | ||||
Water | Anadarko | Carrier/Base Fluid | Water | 7732-18-5 | 100 | 82.7598 | 23,810,000.0 |
For data sources see[5]
Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
---|---|---|---|---|---|---|---|
2013 | ANADARKO E&P ONSHORE LLC | 69,266.00 | 12 | 0.00 | 0 | 0.00 | 0 |
2014 | ANADARKO E&P ONSHORE LLC | 1,194,510.00 | 274 | 0.00 | 0 | 0.00 | 0 |
2015 | ANADARKO E&P ONSHORE LLC | 183,405.00 | 116 | 0.00 | 0 | 0.00 | 0 |
2016 | ANADARKO E&P ONSHORE LLC | 340,001.00 | 360 | 0.00 | 0 | 0.00 | 0 |
2017 | ARD OPR LLC | 171,086.58 | 339 | 0.00 | 0 | 0.00 | 0 |
2018 | ARD OPR LLC | 190,829.41 | 304 | 0.00 | 0 | 0.00 | 0 |
2019 | ARD OPR LLC | 137,250.85 | 365 | 0.00 | 0 | 0.00 | 0 |
For data sources see[6]
Period | Operator | Waste Type | Quantity | Disposal Method | Waste Facility ID |
---|---|---|---|---|---|
2013 | ANADARKO E&P ONSHORE LLC | Drill Cuttings | 17.63 Tons | LANDFILL | 301626 |
2013 | ANADARKO E&P ONSHORE LLC | Produced Fluid | 1,471.96 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2014 | ANADARKO E&P ONSHORE LLC | Produced Fluid | 7,680.12 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2015 | ANADARKO E&P ONSHORE LLC | Produced Fluid | 906.30 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2016 | ANADARKO E&P ONSHORE LLC | Produced Fluid | 486.28 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR119 |
2016 | ANADARKO E&P ONSHORE LLC | Produced Fluid | 12.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NC010 |
2016 | ANADARKO E&P ONSHORE LLC | Produced Fluid | 13.00 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NC010 |
2016 | ANADARKO E&P ONSHORE LLC | Produced Fluid | 130.00 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123 |
2017 | ANADARKO E&P ONSHORE LLC | Produced Fluid | 133.66 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NC010 |
2017 | ANADARKO E&P ONSHORE LLC | Produced Fluid | 3.26 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR119 |
2017 | ARD OPR LLC | Produced Fluid | 25.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NW005 |
2017 | ARD OPR LLC | Produced Fluid | 10.33 Bbl | REUSE (AT WELL PAD) | |
2017 | ANADARKO E&P ONSHORE LLC | Produced Fluid | 5.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123 |
2018 | ARD OPR LLC | Produced Fluid | 4.60 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NC010 |
2018 | ARD OPR LLC | Produced Fluid | 14.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123 |
2018 | ARD OPR LLC | Produced Fluid | 65.85 Bbl | REUSE (AT WELL PAD) | |
2019 | ARD OPR LLC | Produced Fluid | 47.61 Bbl | REUSE (AT WELL PAD) |
For data sources see[7]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
2153072 | Primary Facility | 2013-03-27 | Routine/Complete Inspection | No Violations Noted | |
2213957 | Primary Facility | 2013-10-16 | Routine/Complete Inspection | No Violations Noted | |
2465526 | Primary Facility | 2016-03-16 | Routine/Complete Inspection | No Violations Noted | At the time of the inspection, eight wells were in production. The well site is predominantly vegetated but erosion and was noted on the topsoil stockpile and the area lacks adequate vegetation to prevent accelerated erosion. In addition, the well site remains at the originally constructed size and has not been restored as indicated in the permitted plans. The requirement under Section 3216 (c) of the Oil and Gas Act requires that "within nine months after completion of drilling of a well, the owner or operator shall restore the well site." The approved plans call for a portion of the well site to be scarified and production facilities are installed where the site is to be scarified. I recommend re-permitting the site to incorporate a feasible restoration of the site. No Violations Noted |
2583455 | Primary Facility | 2017-04-13 | Routine/Complete Inspection | No Violations Noted | Plants Evergreen A209H: Could not read top gauge, 9-5/8” x 5-1/2”: 72 psi.
Plants Evergreen A2H: Top gauge: 0 psi, 0 9-5/8” x 5-1/2”: 0 psi, well not in production Plants Evergreen A4H: Top gauge, could not read exactly, >1000 psi, 9-5/8” x 5-1/2”: 0 psi Plants Evergreen A6H: Top gauge: 960 psi Plants Evergreen A211H: Top gauge: 1066 psi, 9-5/8x 5-1/2: 471 psi. mechanical lift. These signs were: rust at the lower part of the fitting, salt crystals at the lower portion of the joint, rusty discoloration on the pad below. Plants Evergreen A210H: Top gauge: could not read exactly, > 900 psi, 9-5/8” x 5-1/2”: 1 psi Called Rick Hall and sent photos of the leaks, which were addressed by replacing the fittings, and using a shovel to remove the discharge on the pad, which was minor. There were no violations observed at the time of my inspection. Left location @ 13:50. |
2755633 | Primary Facility | 2018-07-13 | Routine/Complete Inspection | No Violations Noted | Notice of Termination Inspection; 7/13/2018.
The wells onsite are in production and workers leaving the site said they had just finished painting the wellheads. The site is permanently stabilized and Post Construction Stormwater Management has been implemented using the natural vegetated filter strip. I recommend approving the NOT request and I recommend approving the Well Site Restoration Report when it is submitted. |
For data sources see[8]