X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

37-081-21112

Well Details

Well ID: 37-081-21112
Loading map...
Country: United States
State: Pennsylvania
County: Lycoming
Municipality: Cascade Township
Operator Name: ARD OPR LLC
Well Pad ID: 149066
Farm/Lease Name: PLANTS EVERGREEN FARMS A 210H
License Status:
Spud Date:
Permit Date: 2013-01-31
Well Type: GAS
Unconventional Well: Y
Configuration: Horizontal Well
Conservation: No
Latitude: 41.444264
Longitude: -76.864839

For data sources see[1][2][3]

Well History

Date Event
2013-01-31 New Permit Application
2013-03-21 Performed Spud Operation
2013-05-28 Drilling Completion
2013-09-15 Perforation
2014-02-20 DEVIATED

For data sources see[4]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2013-09-28 2013-10-04 6,769 2,853,210 0

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Sand (Proppant) Trican Well Service Proppant Quartz 14808-60-7 99 16.4555 4,734,240.0
Hexamethylenetretramine 100-97-0 1 0.166217 47820.6
AI-7NR Trican Well Service Corrosion Inhibitor Prop-2-yn-1-ol 107-19-7 1 0.00001914 5.508
Bio-Clear 1000 Trican Well Service Biocide 2,2-Dibromo-3-nitrilopropionamide 10222-01-2 98 0.00008175 23.52
Aqucar DB 5 Trican Well Service Biocide Polyethylene glycol 25322-68-3 65.2 0.02981 8576.34
Sodium bromide 7647-15-6 1.5 0.000685813 197.308
Dibromoacetonitrile 3252-43-5 50 0.0228604 6576.94
2,2-Dibromo-3-nitrilopropionamide 10222-01-2 5 0.00228604 657.694
FR-15 Trican Well Service Friction Reducer Paraffinic, Naphthenic Solvent 64742-47-8 25 0.0163724 4710.34
Proprietary Amide Proprietary 2.5 0.00163724 471.034
Hydrochloric Acid (7.5%) Trican Well Service Acidizing Hydrochloric Acid 7647-01-0 7.5 0.0375569 10805.1
Water 7732-18-5 92.5 0.463201 133263
FEAC-20 Trican Well Service Iron Control Acetic Acid 64-19-7 50 0.00225898 649.909
Citric Acid 77-92-9 30 0.00135539 389.945
Water Anadarko Carrier/Base Fluid Water 7732-18-5 100 82.7598 23,810,000.0

For data sources see[5]

Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2013 ANADARKO E&P ONSHORE LLC 69,266.00 12 0.00 0 0.00 0
2014 ANADARKO E&P ONSHORE LLC 1,194,510.00 274 0.00 0 0.00 0
2015 ANADARKO E&P ONSHORE LLC 183,405.00 116 0.00 0 0.00 0
2016 ANADARKO E&P ONSHORE LLC 340,001.00 360 0.00 0 0.00 0
2017 ARD OPR LLC 171,086.58 339 0.00 0 0.00 0
2018 ARD OPR LLC 190,829.41 304 0.00 0 0.00 0
2019 ARD OPR LLC 137,250.85 365 0.00 0 0.00 0

For data sources see[6]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2013 ANADARKO E&P ONSHORE LLC Drill Cuttings 17.63 Tons LANDFILL 301626
2013 ANADARKO E&P ONSHORE LLC Produced Fluid 1,471.96 Bbl REUSE OTHER THAN ROAD SPREADING
2014 ANADARKO E&P ONSHORE LLC Produced Fluid 7,680.12 Bbl REUSE OTHER THAN ROAD SPREADING
2015 ANADARKO E&P ONSHORE LLC Produced Fluid 906.30 Bbl REUSE OTHER THAN ROAD SPREADING
2016 ANADARKO E&P ONSHORE LLC Produced Fluid 486.28 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR119
2016 ANADARKO E&P ONSHORE LLC Produced Fluid 12.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC010
2016 ANADARKO E&P ONSHORE LLC Produced Fluid 13.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123NC010
2016 ANADARKO E&P ONSHORE LLC Produced Fluid 130.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123
2017 ANADARKO E&P ONSHORE LLC Produced Fluid 133.66 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC010
2017 ANADARKO E&P ONSHORE LLC Produced Fluid 3.26 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR119
2017 ARD OPR LLC Produced Fluid 25.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW005
2017 ARD OPR LLC Produced Fluid 10.33 Bbl REUSE (AT WELL PAD)
2017 ANADARKO E&P ONSHORE LLC Produced Fluid 5.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123
2018 ARD OPR LLC Produced Fluid 4.60 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC010
2018 ARD OPR LLC Produced Fluid 14.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123
2018 ARD OPR LLC Produced Fluid 65.85 Bbl REUSE (AT WELL PAD)
2019 ARD OPR LLC Produced Fluid 47.61 Bbl REUSE (AT WELL PAD)

For data sources see[7]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
2153072 Primary Facility 2013-03-27 Routine/Complete Inspection No Violations Noted
2213957 Primary Facility 2013-10-16 Routine/Complete Inspection No Violations Noted
2465526 Primary Facility 2016-03-16 Routine/Complete Inspection No Violations Noted At the time of the inspection, eight wells were in production. The well site is predominantly vegetated but erosion and was noted on the topsoil stockpile and the area lacks adequate vegetation to prevent accelerated erosion. In addition, the well site remains at the originally constructed size and has not been restored as indicated in the permitted plans. The requirement under Section 3216 (c) of the Oil and Gas Act requires that "within nine months after completion of drilling of a well, the owner or operator shall restore the well site." The approved plans call for a portion of the well site to be scarified and production facilities are installed where the site is to be scarified. I recommend re-permitting the site to incorporate a feasible restoration of the site. No Violations Noted
2583455 Primary Facility 2017-04-13 Routine/Complete Inspection No Violations Noted Plants Evergreen A209H: Could not read top gauge, 9-5/8” x 5-1/2”: 72 psi.

Plants Evergreen A2H: Top gauge: 0 psi, 0 9-5/8” x 5-1/2”: 0 psi, well not in production Plants Evergreen A4H: Top gauge, could not read exactly, >1000 psi, 9-5/8” x 5-1/2”: 0 psi Plants Evergreen A6H: Top gauge: 960 psi Plants Evergreen A211H: Top gauge: 1066 psi, 9-5/8x 5-1/2: 471 psi. mechanical lift. These signs were: rust at the lower part of the fitting, salt crystals at the lower portion of the joint, rusty discoloration on the pad below. Plants Evergreen A210H: Top gauge: could not read exactly, > 900 psi, 9-5/8” x 5-1/2”: 1 psi

Called Rick Hall and sent photos of the leaks, which were addressed by replacing the fittings, and using a shovel to remove the discharge on the pad, which was minor. There were no violations observed at the time of my inspection. Left location @ 13:50.

2755633 Primary Facility 2018-07-13 Routine/Complete Inspection No Violations Noted Notice of Termination Inspection; 7/13/2018.

The wells onsite are in production and workers leaving the site said they had just finished painting the wellheads. The site is permanently stabilized and Post Construction Stormwater Management has been implemented using the natural vegetated filter strip. I recommend approving the NOT request and I recommend approving the Well Site Restoration Report when it is submitted.

For data sources see[8]

References