If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 37-081-21691 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.54535,"lon":-77.178756,"icon":""}]} |
| Country: United States | |
| State: Pennsylvania | |
| County: Lycoming | |
| Municipality: Jackson Township | |
| Operator Name: SWN PROD CO LLC | |
| Well Pad ID: 153432 | |
| Farm/Lease Name: BROWN 1H | |
| License Status: | |
| Spud Date: | |
| Permit Date: 2017-08-11 | |
| Well Type: GAS | |
| Unconventional Well: Y | |
| Configuration: Horizontal Well | |
| Conservation: No | |
| Latitude: 41.545350 | |
| Longitude: -77.178756 |
| Date | Event |
|---|---|
| 2017-08-11 | New Permit Application |
| 2017-08-19 | Performed Spud Operation |
For data sources see[4]
| Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
|---|---|---|---|---|---|
| 1 | 2018-03-07 | 2018-04-13 | 7,868 | 15,285,300 | 0 |
| Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
|---|---|---|---|---|---|---|---|---|
| 1 | HAI-150E | Halliburton | Corrosion Inhibitor | Listed Below | Listed Below | 0 | 0 | 0 |
| FR-76 | Halliburton | Friction Reducer | Listed Below | Listed Below | 0 | 0 | 0 | |
| BE-9W | Halliburton | Biocide | Listed Below | Listed Below | 0 | 0 | 0 | |
| HYDROCHLORIC ACID | Halliburton | Solvent | Listed Below | Listed Below | 0 | 0 | 0 | |
| EXCELERATE LX-1 | Halliburton | Friction Reducer | Listed Below | Listed Below | 0 | 0 | 0 | |
| SAND-PREMIUM WHITE-30/50, BULK | Halliburton | Proppant | Listed Below | Listed Below | 0 | 0 | 0 | |
| Fresh Water | Operator | Base Fluid | Water | 7732-18-5 | 100 | 87.3564 | 127,479,000.0 | |
| SAND-COMMON WHITE-100 MESH, SSA-2, BULK (100003676) | Halliburton | Proppant | Listed Below | Listed Below | 0 | 0 | 0 | |
| Ethoxyalted fatty acid | Proprietary | 5 | 0.00005210 | 77 | ||||
| Hydrochloric acid | 7647-01-0 | 15 | 0.198042 | 289003 | ||||
| Non-hazardous food substance | Proprietary | 100 | 0.00100905 | 1473 | ||||
| Crystalline silica, quartz | 14808-60-7 | 100 | 11.1541 | 16,277,200.0 | ||||
| Fatty acid ester | Proprietary | 5 | 0.000104192 | 154 | ||||
| Organic phosphonate | Proprietary | 60 | 0.0123437 | 18014 | ||||
| Inorganic salt | Proprietary | 30 | 0.032199 | 46988 | ||||
| Sodium chloride | 7647-14-5 | 5 | 0.00005210 | 77 | ||||
| Polyacrylate | Proprietary | 30 | 0.000312577 | 457 | ||||
| Ammonium chloride | 12125-02-9 | 30 | 0.00622393 | 9084 | ||||
| Tributyl tetradecyl phosphonium chloride | 81741-28-8 | 10 | 0.00393149 | 5738 | ||||
| Propylene glycol | 57-55-6 | 60 | 0.0235889 | 34424 | ||||
| Acrylamide acrylate copolymer | Proprietary | 30 | 0.032199 | 46988 | ||||
| Hydrotreated light petroleum distillate | 64742-47-8 | 30 | 0.032199 | 46988 | ||||
| Diammonium phosphate | 7783-28-0 | 5 | 0.00102864 | 1502 | ||||
| Hydroteated light petroleum distillate | 64742-47-8 | 30 | 0.000312577 | 457 | ||||
| Ingredients | Listed Above | Listed Above | Water | 7732-18-5 | 100 | 1.43696 | 2,096,960.0 | |
| LP-65 MC | Halliburton | Scale Inhibitor | Listed Below | Listed Below | 0 | 0 | 0 |
For data sources see[5]
| Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
|---|---|---|---|---|---|---|---|
| 2017 | SWN PROD CO LLC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
| 2018 | SWN PROD CO LLC | 3,187,088.00 | 259 | 0.00 | 0 | 0.00 | 0 |
| 2019 | SWN PROD CO LLC | 1,494,925.00 | 243 | 0.00 | 0 | 0.00 | 0 |
For data sources see[6]
| Period | Operator | Waste Type | Quantity | Disposal Method | Waste Facility ID |
|---|---|---|---|---|---|
| 2017 | SWN PROD CO LLC | Other Oil & Gas Wastes | 10.00 Bbl | REUSE (AT WELL PAD) | |
| 2018 | SWN PROD CO LLC | Produced Fluid | 73.33 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NC010 |
| 2018 | SWN PROD CO LLC | Produced Fluid | 14,376.68 Bbl | SURFACE IMPOUNDMENT | 95-16-65420-013 |
| 2018 | SWN PROD CO LLC | Drilling Fluid Waste | 730.00 Bbl | REUSE (AT WELL PAD) | |
| 2018 | SWN PROD CO LLC | Other Oil & Gas Wastes | 67.94 Bbl | SURFACE IMPOUNDMENT | 826342 |
| 2018 | SWN PROD CO LLC | Other Oil & Gas Wastes | 86.67 Bbl | REUSE (AT WELL PAD) | |
| 2018 | SWN PROD CO LLC | Produced Fluid | 32,293.33 Bbl | REUSE (AT WELL PAD) | |
| 2018 | SWN PROD CO LLC | Drill Cuttings | 1,758.93 Tons | LANDFILL | 301626 |
| 2018 | SWN PROD CO LLC | Produced Fluid | 18,669.00 Bbl | SURFACE IMPOUNDMENT | 826342 |
| 2018 | SWN PROD CO LLC | Soil Contaminated by Oil & Gas Related Spills | 0.17 Tons | RESIDUAL WASTE PROCESSING FACILITY | 301333 |
| 2018 | SWN PROD CO LLC | Produced Fluid | 583.33 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123 |
| 2018 | SWN PROD CO LLC | Other Oil & Gas Wastes | 51.67 Bbl | SURFACE IMPOUNDMENT | 95-16-65420-013 |
| 2018 | SWN PROD CO LLC | Waste Water Treatment Sludge | 4.62 Tons | LANDFILL | 301358 |
| 2018 | SWN PROD CO LLC | Drilling Fluid Waste | 36.67 Bbl | SURFACE IMPOUNDMENT | 95-16-65420-013 |
| 2018 | SWN PROD CO LLC | Other Oil & Gas Wastes | 470.25 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NC010 |
| 2018 | SWN PROD CO LLC | Unused Fracturing Fluid Waste | 320.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123 |
| 2018 | SWN PROD CO LLC | Synthetic Liner Materials | 59.34 Tons | LANDFILL | 301358 |
| 2018 | SWN PROD CO LLC | Other Oil & Gas Wastes | 146.67 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123 |
| 2018 | SWN PROD CO LLC | Drilling Fluid Waste | 36.67 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NC010 |
| 2018 | SWN PROD CO LLC | Filter Socks | 0.96 Tons | RESIDUAL WASTE PROCESSING FACILITY | 301333 |
| 2019 | SWN PROD CO LLC | Other Oil & Gas Wastes | 36.67 Bbl | SURFACE IMPOUNDMENT | 95-16-65420-013 |
| 2019 | SWN PROD CO LLC | Produced Fluid | 110.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NC010 |
| 2019 | SWN PROD CO LLC | Produced Fluid | 3,570.02 Bbl | REUSE (AT WELL PAD) | |
| 2019 | SWN PROD CO LLC | Other Oil & Gas Wastes | 146.67 Bbl | SURFACE IMPOUNDMENT | 826342 |
| 2019 | SWN PROD CO LLC | Produced Fluid | 506.67 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NC035 |
| 2019 | SWN PROD CO LLC | Produced Fluid | 1,210.00 Bbl | SURFACE IMPOUNDMENT | 826342 |
| 2019 | SWN PROD CO LLC | Other Oil & Gas Wastes | 576.67 Bbl | REUSE (AT WELL PAD) | |
| 2019 | SWN PROD CO LLC | Produced Fluid | 5,253.33 Bbl | SURFACE IMPOUNDMENT | 95-16-65420-013 |
| 2019 | SWN PROD CO LLC | Synthetic Liner Materials | 35.00 Tons | LANDFILL | 101247 |
| 2019 | SWN PROD CO LLC | Waste Water Treatment Sludge | 32.27 Tons | LANDFILL | 301358 |
For data sources see[7]
| Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
|---|---|---|---|---|---|
| 2591131 | Primary Facility | 2017-05-03 | Routine/Complete Inspection | No Violations Noted | Routine Inspection; 5/2/2017.
I entered the site at approximately 10:40 and talked to Tom Chitwood (SWN). The first 100+ feet of the access road and construction entrance was constructed and extra base rock was stockpiled for maintenance. The contractor used the existing road (withbase rock upgrades as needed) to get back to the last few hundred feet of access road and the well pad itself. The well pad area has been cleared and perimeter E&S controls have been installed. At the time of the inspection, the contractor was scraping topsoil from the shallow bedrock. The rock on the pad will be drilled and shot and the resulting material will be used as base rock throughout the site. Overall, the site is in good condition. No Violations Noted. |
| 2601958 | Primary Facility | 2017-06-06 | Routine/Complete Inspection | No Violations Noted | Routine inspection; 6/6/2017.
I entered the site at 13:18. At the time of the inspection, the majority of the bulk earthmoving was complete and work to establish drainage and ditches was underway. The topsoil stockpile was seeded and stabilized while disturbed soils along the access road were temporarily stabilized. Perimeter E&S controls are functioning properly and are in good condition no E&S issues were noted. Final grading and seeding/stabilization has yet to be completed. Top rock on the entire location will need to be completed as well. Overall the site looks good. No violations noted. |
| 2608326 | Primary Facility | 2017-06-27 | Routine/Complete Inspection | No Violations Noted | Routine inspection; 6/27/2017.
I entered the site at 08:55. At the time of the inspection, the access road was complete (including top-rock) and previously disturbed soils were seeded and stabilized. The berm for the infiltration basin was constructed and topsoiled. The under-drain, rock, geo-fabric, and amended soils were being installed on the infiltration basin. The pad area was complete except for clean-up, topsoiling, seed/stabilization, and top-rock. The E&S controls are installed and functioning properly. No E&S issues were noted. This inspection fulfills the pre-operational inspection requirement of the Oil and Gas Act as amended by Act 13. Overall the site looks good. No violations noted. |
| 2635363 | Primary Facility | 2017-08-30 | Routine/Complete Inspection | No Violations Noted | Routine inspection of spudded unconventional wells. No violations noted at time of inspection. |
| 2638800 | Primary Facility | 2017-09-18 | Drilling/Alteration | No Violations Noted | The site is well vegetated but not yet permanently stabilized. Pipeline is being tied-in on the northern edge of the pad while rig mats and barricades are staged onsite. The site is in good condition. No violations noted. |
| 2665237 | Primary Facility | 2017-11-28 | Routine/Complete Inspection | No Violations Noted | I met Jonathan Woodburn when I arrived. SWN rig 45 on location drilling the 3H well at a depth of 6793', currently drilling on air. Woody walked the site with me. Sitewide containment appeared to be in good condition, and secondary containments around the mud tanks and diesel tank were also in good condition. The site was clean and well maintained. |
| 2669256 | Primary Facility | 2017-12-11 | Routine/Complete Inspection | No Violations Noted | Weather was 28 degrees F. And snowy at time of inspection. Well has a steel plate welded over it. Performed a brief visual inspection to ensure there were no changes in cellar conditions after another well on the pad was drilled and cemented to completion. |
| 2672544 | Primary Facility | 2017-12-15 | Routine/Complete Inspection | No Violations Noted | Met with Andrew Griffith on location. Routine inspection of spudded conductor to verify cellar condtions have not changed due to drilling on location. No violations noted at time of inspection. |
| 2677073 | Primary Facility | 2018-01-02 | Routine/Complete Inspection | No Violations Noted | Weather was 12 degrees F. At time of inspection. Met with Johnathan Woodburn to discuss the previous weeks operations. The rig finished up the production cement job on the 2H at 12:00 pm on 1/1/18. Rig was in the process of moving to the 1H the commence drilling. Surface casing is estimated to be set at 798 ft. No violations noted at time of inspection. |
| 2681309 | Primary Facility | 2018-01-11 | Routine/Complete Inspection | No Violations Noted | Weather was 33 degrees F. At time of inspection. Met with Andrew Griffith to discuss the previous weeks operations. Reviewed the cement job logs from the surface and intermediate casing. No discrepancies noted. Good cement returns to surface on both jobs and cement density was maintained throughout each job. Rig was in the process of drilling the 8 3/4 hole for the production casing and was currently at a depth of 3985' at time of inspection. The estimated kick off point for the well is 6750'. No violations noted at time of inspection. |
| 2684540 | Primary Facility | 2018-01-18 | Routine/Complete Inspection | No Violations Noted | Weather was 15 degrees F. At time of inspection. Met with Johnathan Woodburn to discuss the previous weeks operations. Rig was currently in the process of drilling the 8 1/2" hole. They were currently at a depth of 11263'. Drilling was paused at time of inspection for a rig move meeting. No violations noted at time of inspection. |
| 2685762 | Primary Facility | 2018-01-23 | Routine/Complete Inspection | No Violations Noted | Weather was 45 degrees F. and raining at time of inspection. Met with Johnathan Woodburn to discuss the previous weeks operations. Rig was No violations noted at time of inspection. The rig finished drilling to a total depth(TD) of 17571' at 7:30 am. They were circulating the well at time of inspection. They plan to cement Thursday early morning after casing is run to TD. This will be the last hole drilled on the pad for now. There are 2 other wells permitted on the pad to be drilled at a future date. No violations noted at time of inspection. |
| 2692551 | Primary Facility | 2018-02-06 | Routine/Complete Inspection | No Violations Noted | When I was 26° and cloudy at time of inspection. Well was shut in. Gas production units were in the process of being installed on the well pad at time of inspection. Well has one annulus vent plumbed to surface from the 5 1/2 x 9 5/8 annulus. It was shut in at time of inspection. The 9 5/8 x 13 3/8 annulus and 13 3/8 x 20 annulus were visually observed to have cement to surface at time of inspection. There was an analog pressure gauge attached to the well head that would show the production casing pressure. At time of inspection the gauge was shut off by a needle valve. No violations were noted at time of inspection. |
| 2699877 | Primary Facility | 2018-02-28 | Routine/Complete Inspection | No Violations Noted | I met Mark MacPherson, company man, when I arrived. Frac was active, currently fracing stage 26 on the 3H well. Tracy Gregory of SWN arrived as I began my inspection, and accompanied me. Containment appeared to be in good condition. Nearly all of the puddles on the pad surface showed low conductance (.45-.65 mS/cm). There were 2 puddles that showed slightly higher conductance (1.0 mS/cm), one near the sandboxes (approximately 1 gallon) and one near the command trailer (5-10 gallons). Tracy informed Mac and instructed him to have these areas vacced. |
| 2756401 | Primary Facility | 2018-07-26 | Routine/Complete Inspection | No Violations Noted | Weather was 71° and sunny at time of inspection. There had been substantial rain over the last four days previous to inspection. There were no SWN representatives on location at time of inspection. Cellar was filled in and covered with black felt containment. Well had a digital pressure gauge on the tubing that read 486 psi at time of inspection. There was an analog 0-10k psi pressure gauge attached above the swab valve that read approximately 450 psi at time inspection. No violations noted at time of inspection. |
| 2775212 | Primary Facility | 2018-09-11 | Site Restoration | No Violations Noted | The operator submitted a post-drill well site restoration report for this site which prompted this inspection. A SWN employee arrived at the site simultaneously. Another SWN employee, Tyler Parsons, arrived at the site during the inspection. Mr. Parsons relayed that the five frac tanks on location are in use as temporary additional storage for produced water.
Three of seven permitted wells (Brown 1H, 2H, and 3H) have been drilled and stimulated. These three wells were in production at the time of inspection. The site is stable with 70 percent vegetative cover overall. A bioretention basin and a rock-lined ditch provide PCSM. These appear to be functioning as designed. The site has been permitted to remain at full pad size. At this time, due to the presence of three roll off tanks, a battery of five frac tanks used for temporary produced water storage, and secondary containment around the wellheads and frac tanks, the site does not yet meet all of the post-drilling site restoration criteria under 78a.65. |
| 2801760 | Primary Facility | 2018-11-13 | Routine/Complete Inspection | No Violations Noted | Three wells staged for production. Three each sand and water separators within containment. No leaks.
Pipeline project being run to site at this time. |
| 2842771 | Primary Facility | 2019-02-21 | Routine/Complete Inspection | No Violations Noted | Weather was 41 degrees and sunny. There were no Southwestern representatives on location at time of inspection. Well had digital pressure monitoring equipment attached to the production tubing. Tubing pressure was 321 PSI at time of inspection. The 9x5 annulus vent was plumbed into the pay line. 0% combustable gas was detected around the well at time of inspection. No violations noted at time of insoection. |
For data sources see[8]