X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

37-081-21691

Well Details

Well ID: 37-081-21691
Loading map...
Country: United States
State: Pennsylvania
County: Lycoming
Municipality: Jackson Township
Operator Name: SWN PROD CO LLC
Well Pad ID: 153432
Farm/Lease Name: BROWN 1H
License Status:
Spud Date:
Permit Date: 2017-08-11
Well Type: GAS
Unconventional Well: Y
Configuration: Horizontal Well
Conservation: No
Latitude: 41.545350
Longitude: -77.178756

For data sources see[1][2][3]

Well History

Date Event
2017-08-11 New Permit Application
2017-08-19 Performed Spud Operation

For data sources see[4]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2018-03-07 2018-04-13 7,868 15,285,300 0

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 HAI-150E Halliburton Corrosion Inhibitor Listed Below Listed Below 0 0 0
FR-76 Halliburton Friction Reducer Listed Below Listed Below 0 0 0
BE-9W Halliburton Biocide Listed Below Listed Below 0 0 0
HYDROCHLORIC ACID Halliburton Solvent Listed Below Listed Below 0 0 0
EXCELERATE LX-1 Halliburton Friction Reducer Listed Below Listed Below 0 0 0
SAND-PREMIUM WHITE-30/50, BULK Halliburton Proppant Listed Below Listed Below 0 0 0
Fresh Water Operator Base Fluid Water 7732-18-5 100 87.3564 127,479,000.0
SAND-COMMON WHITE-100 MESH, SSA-2, BULK (100003676) Halliburton Proppant Listed Below Listed Below 0 0 0
Ethoxyalted fatty acid Proprietary 5 0.00005210 77
Hydrochloric acid 7647-01-0 15 0.198042 289003
Non-hazardous food substance Proprietary 100 0.00100905 1473
Crystalline silica, quartz 14808-60-7 100 11.1541 16,277,200.0
Fatty acid ester Proprietary 5 0.000104192 154
Organic phosphonate Proprietary 60 0.0123437 18014
Inorganic salt Proprietary 30 0.032199 46988
Sodium chloride 7647-14-5 5 0.00005210 77
Polyacrylate Proprietary 30 0.000312577 457
Ammonium chloride 12125-02-9 30 0.00622393 9084
Tributyl tetradecyl phosphonium chloride 81741-28-8 10 0.00393149 5738
Propylene glycol 57-55-6 60 0.0235889 34424
Acrylamide acrylate copolymer Proprietary 30 0.032199 46988
Hydrotreated light petroleum distillate 64742-47-8 30 0.032199 46988
Diammonium phosphate 7783-28-0 5 0.00102864 1502
Hydroteated light petroleum distillate 64742-47-8 30 0.000312577 457
Ingredients Listed Above Listed Above Water 7732-18-5 100 1.43696 2,096,960.0
LP-65 MC Halliburton Scale Inhibitor Listed Below Listed Below 0 0 0

For data sources see[5]

Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2017 SWN PROD CO LLC 0.00 0 0.00 0 0.00 0
2018 SWN PROD CO LLC 3,187,088.00 259 0.00 0 0.00 0
2019 SWN PROD CO LLC 1,494,925.00 243 0.00 0 0.00 0

For data sources see[6]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2017 SWN PROD CO LLC Other Oil & Gas Wastes 10.00 Bbl REUSE (AT WELL PAD)
2018 SWN PROD CO LLC Produced Fluid 73.33 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC010
2018 SWN PROD CO LLC Produced Fluid 14,376.68 Bbl SURFACE IMPOUNDMENT 95-16-65420-013
2018 SWN PROD CO LLC Drilling Fluid Waste 730.00 Bbl REUSE (AT WELL PAD)
2018 SWN PROD CO LLC Other Oil & Gas Wastes 67.94 Bbl SURFACE IMPOUNDMENT 826342
2018 SWN PROD CO LLC Other Oil & Gas Wastes 86.67 Bbl REUSE (AT WELL PAD)
2018 SWN PROD CO LLC Produced Fluid 32,293.33 Bbl REUSE (AT WELL PAD)
2018 SWN PROD CO LLC Drill Cuttings 1,758.93 Tons LANDFILL 301626
2018 SWN PROD CO LLC Produced Fluid 18,669.00 Bbl SURFACE IMPOUNDMENT 826342
2018 SWN PROD CO LLC Soil Contaminated by Oil & Gas Related Spills 0.17 Tons RESIDUAL WASTE PROCESSING FACILITY 301333
2018 SWN PROD CO LLC Produced Fluid 583.33 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123
2018 SWN PROD CO LLC Other Oil & Gas Wastes 51.67 Bbl SURFACE IMPOUNDMENT 95-16-65420-013
2018 SWN PROD CO LLC Waste Water Treatment Sludge 4.62 Tons LANDFILL 301358
2018 SWN PROD CO LLC Drilling Fluid Waste 36.67 Bbl SURFACE IMPOUNDMENT 95-16-65420-013
2018 SWN PROD CO LLC Other Oil & Gas Wastes 470.25 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC010
2018 SWN PROD CO LLC Unused Fracturing Fluid Waste 320.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123
2018 SWN PROD CO LLC Synthetic Liner Materials 59.34 Tons LANDFILL 301358
2018 SWN PROD CO LLC Other Oil & Gas Wastes 146.67 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123
2018 SWN PROD CO LLC Drilling Fluid Waste 36.67 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC010
2018 SWN PROD CO LLC Filter Socks 0.96 Tons RESIDUAL WASTE PROCESSING FACILITY 301333
2019 SWN PROD CO LLC Other Oil & Gas Wastes 36.67 Bbl SURFACE IMPOUNDMENT 95-16-65420-013
2019 SWN PROD CO LLC Produced Fluid 110.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC010
2019 SWN PROD CO LLC Produced Fluid 3,570.02 Bbl REUSE (AT WELL PAD)
2019 SWN PROD CO LLC Other Oil & Gas Wastes 146.67 Bbl SURFACE IMPOUNDMENT 826342
2019 SWN PROD CO LLC Produced Fluid 506.67 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC035
2019 SWN PROD CO LLC Produced Fluid 1,210.00 Bbl SURFACE IMPOUNDMENT 826342
2019 SWN PROD CO LLC Other Oil & Gas Wastes 576.67 Bbl REUSE (AT WELL PAD)
2019 SWN PROD CO LLC Produced Fluid 5,253.33 Bbl SURFACE IMPOUNDMENT 95-16-65420-013
2019 SWN PROD CO LLC Synthetic Liner Materials 35.00 Tons LANDFILL 101247
2019 SWN PROD CO LLC Waste Water Treatment Sludge 32.27 Tons LANDFILL 301358

For data sources see[7]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
2591131 Primary Facility 2017-05-03 Routine/Complete Inspection No Violations Noted Routine Inspection; 5/2/2017.

I entered the site at approximately 10:40 and talked to Tom Chitwood (SWN). The first 100+ feet of the access road and construction entrance was constructed and extra base rock was stockpiled for maintenance. The contractor used the existing road (withbase rock upgrades as needed) to get back to the last few hundred feet of access road and the well pad itself. The well pad area has been cleared and perimeter E&S controls have been installed. At the time of the inspection, the contractor was scraping topsoil from the shallow bedrock. The rock on the pad will be drilled and shot and the resulting material will be used as base rock throughout the site. Overall, the site is in good condition. No Violations Noted.

2601958 Primary Facility 2017-06-06 Routine/Complete Inspection No Violations Noted Routine inspection; 6/6/2017.

I entered the site at 13:18. At the time of the inspection, the majority of the bulk earthmoving was complete and work to establish drainage and ditches was underway. The topsoil stockpile was seeded and stabilized while disturbed soils along the access road were temporarily stabilized. Perimeter E&S controls are functioning properly and are in good condition no E&S issues were noted. Final grading and seeding/stabilization has yet to be completed. Top rock on the entire location will need to be completed as well. Overall the site looks good. No violations noted.

2608326 Primary Facility 2017-06-27 Routine/Complete Inspection No Violations Noted Routine inspection; 6/27/2017.

I entered the site at 08:55. At the time of the inspection, the access road was complete (including top-rock) and previously disturbed soils were seeded and stabilized. The berm for the infiltration basin was constructed and topsoiled. The under-drain, rock, geo-fabric, and amended soils were being installed on the infiltration basin. The pad area was complete except for clean-up, topsoiling, seed/stabilization, and top-rock. The E&S controls are installed and functioning properly. No E&S issues were noted. This inspection fulfills the pre-operational inspection requirement of the Oil and Gas Act as amended by Act 13. Overall the site looks good. No violations noted.

2635363 Primary Facility 2017-08-30 Routine/Complete Inspection No Violations Noted Routine inspection of spudded unconventional wells. No violations noted at time of inspection.
2638800 Primary Facility 2017-09-18 Drilling/Alteration No Violations Noted The site is well vegetated but not yet permanently stabilized. Pipeline is being tied-in on the northern edge of the pad while rig mats and barricades are staged onsite. The site is in good condition. No violations noted.
2665237 Primary Facility 2017-11-28 Routine/Complete Inspection No Violations Noted I met Jonathan Woodburn when I arrived. SWN rig 45 on location drilling the 3H well at a depth of 6793', currently drilling on air. Woody walked the site with me. Sitewide containment appeared to be in good condition, and secondary containments around the mud tanks and diesel tank were also in good condition. The site was clean and well maintained.
2669256 Primary Facility 2017-12-11 Routine/Complete Inspection No Violations Noted Weather was 28 degrees F. And snowy at time of inspection. Well has a steel plate welded over it. Performed a brief visual inspection to ensure there were no changes in cellar conditions after another well on the pad was drilled and cemented to completion.
2672544 Primary Facility 2017-12-15 Routine/Complete Inspection No Violations Noted Met with Andrew Griffith on location. Routine inspection of spudded conductor to verify cellar condtions have not changed due to drilling on location. No violations noted at time of inspection.
2677073 Primary Facility 2018-01-02 Routine/Complete Inspection No Violations Noted Weather was 12 degrees F. At time of inspection. Met with Johnathan Woodburn to discuss the previous weeks operations. The rig finished up the production cement job on the 2H at 12:00 pm on 1/1/18. Rig was in the process of moving to the 1H the commence drilling. Surface casing is estimated to be set at 798 ft. No violations noted at time of inspection.
2681309 Primary Facility 2018-01-11 Routine/Complete Inspection No Violations Noted Weather was 33 degrees F. At time of inspection. Met with Andrew Griffith to discuss the previous weeks operations. Reviewed the cement job logs from the surface and intermediate casing. No discrepancies noted. Good cement returns to surface on both jobs and cement density was maintained throughout each job. Rig was in the process of drilling the 8 3/4 hole for the production casing and was currently at a depth of 3985' at time of inspection. The estimated kick off point for the well is 6750'. No violations noted at time of inspection.
2684540 Primary Facility 2018-01-18 Routine/Complete Inspection No Violations Noted Weather was 15 degrees F. At time of inspection. Met with Johnathan Woodburn to discuss the previous weeks operations. Rig was currently in the process of drilling the 8 1/2" hole. They were currently at a depth of 11263'. Drilling was paused at time of inspection for a rig move meeting. No violations noted at time of inspection.
2685762 Primary Facility 2018-01-23 Routine/Complete Inspection No Violations Noted Weather was 45 degrees F. and raining at time of inspection. Met with Johnathan Woodburn to discuss the previous weeks operations. Rig was No violations noted at time of inspection. The rig finished drilling to a total depth(TD) of 17571' at 7:30 am. They were circulating the well at time of inspection. They plan to cement Thursday early morning after casing is run to TD. This will be the last hole drilled on the pad for now. There are 2 other wells permitted on the pad to be drilled at a future date. No violations noted at time of inspection.
2692551 Primary Facility 2018-02-06 Routine/Complete Inspection No Violations Noted When I was 26° and cloudy at time of inspection. Well was shut in. Gas production units were in the process of being installed on the well pad at time of inspection. Well has one annulus vent plumbed to surface from the 5 1/2 x 9 5/8 annulus. It was shut in at time of inspection. The 9 5/8 x 13 3/8 annulus and 13 3/8 x 20 annulus were visually observed to have cement to surface at time of inspection. There was an analog pressure gauge attached to the well head that would show the production casing pressure. At time of inspection the gauge was shut off by a needle valve. No violations were noted at time of inspection.
2699877 Primary Facility 2018-02-28 Routine/Complete Inspection No Violations Noted I met Mark MacPherson, company man, when I arrived. Frac was active, currently fracing stage 26 on the 3H well. Tracy Gregory of SWN arrived as I began my inspection, and accompanied me. Containment appeared to be in good condition. Nearly all of the puddles on the pad surface showed low conductance (.45-.65 mS/cm). There were 2 puddles that showed slightly higher conductance (1.0 mS/cm), one near the sandboxes (approximately 1 gallon) and one near the command trailer (5-10 gallons). Tracy informed Mac and instructed him to have these areas vacced.
2756401 Primary Facility 2018-07-26 Routine/Complete Inspection No Violations Noted Weather was 71° and sunny at time of inspection. There had been substantial rain over the last four days previous to inspection. There were no SWN representatives on location at time of inspection. Cellar was filled in and covered with black felt containment. Well had a digital pressure gauge on the tubing that read 486 psi at time of inspection. There was an analog 0-10k psi pressure gauge attached above the swab valve that read approximately 450 psi at time inspection. No violations noted at time of inspection.
2775212 Primary Facility 2018-09-11 Site Restoration No Violations Noted The operator submitted a post-drill well site restoration report for this site which prompted this inspection. A SWN employee arrived at the site simultaneously. Another SWN employee, Tyler Parsons, arrived at the site during the inspection. Mr. Parsons relayed that the five frac tanks on location are in use as temporary additional storage for produced water.

Three of seven permitted wells (Brown 1H, 2H, and 3H) have been drilled and stimulated. These three wells were in production at the time of inspection.

The site is stable with 70 percent vegetative cover overall. A bioretention basin and a rock-lined ditch provide PCSM. These appear to be functioning as designed. The site has been permitted to remain at full pad size.

At this time, due to the presence of three roll off tanks, a battery of five frac tanks used for temporary produced water storage, and secondary containment around the wellheads and frac tanks, the site does not yet meet all of the post-drilling site restoration criteria under 78a.65.

2801760 Primary Facility 2018-11-13 Routine/Complete Inspection No Violations Noted Three wells staged for production. Three each sand and water separators within containment. No leaks.

Pipeline project being run to site at this time.

2842771 Primary Facility 2019-02-21 Routine/Complete Inspection No Violations Noted Weather was 41 degrees and sunny. There were no Southwestern representatives on location at time of inspection. Well had digital pressure monitoring equipment attached to the production tubing. Tubing pressure was 321 PSI at time of inspection. The 9x5 annulus vent was plumbed into the pay line. 0% combustable gas was detected around the well at time of inspection. No violations noted at time of insoection.

For data sources see[8]

References