X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

37-081-21729

Well Details

Well ID: 37-081-21729
Loading map...
Country: United States
State: Pennsylvania
County: Lycoming
Municipality: Cogan House Township
Operator Name: ARD OPR LLC
Well Pad ID: 145720
Farm/Lease Name: ELBOW F&G C-213H
License Status:
Spud Date:
Permit Date: 2018-02-28
Well Type: GAS
Unconventional Well: Y
Configuration: Horizontal Well
Conservation: No
Latitude: 41.378242
Longitude: -77.229853

For data sources see[1][2][3]

Well History

Date Event
2018-02-28 New Permit Application
2018-03-29 Performed Spud Operation

For data sources see[4]


Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2019 ARD OPR LLC 1,235,955.59 123 0.00 0 0.00 0

For data sources see[5]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2018 ARD OPR LLC Synthetic Liner Materials 0.17 Tons LANDFILL 100955
2018 ARD OPR LLC Drill Cuttings 1,259.23 Tons LANDFILL 100955
2018 ARD OPR LLC Drilling Fluid Waste 930.00 Bbl REUSE (AT WELL PAD)
2018 ARD OPR LLC Drilling Fluid Waste 105.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC010
2019 ARD OPR LLC Produced Fluid 945.26 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC010
2019 ARD OPR LLC Produced Fluid 352.89 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123
2019 ARD OPR LLC Soil Contaminated by Oil & Gas Related Spills 7.26 Tons LANDFILL 100955
2019 ARD OPR LLC Drilling Fluid Waste 62.00 Bbl REUSE (AT WELL PAD)
2019 ARD OPR LLC Servicing Fluid 15.71 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123
2019 ARD OPR LLC Servicing Fluid 15.06 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC010
2019 ARD OPR LLC Synthetic Liner Materials 11.53 Tons LANDFILL 100955
2019 ARD OPR LLC Servicing Fluid 15.71 Bbl REUSE (AT WELL PAD)
2019 ARD OPR LLC Unused Fracturing Fluid Waste 11.30 Bbl LANDFILL 100955
2019 ARD OPR LLC Waste Water Treatment Sludge 0.30 Tons RESIDUAL WASTE PROCESSING FACILITY WMGR123
2019 ARD OPR LLC Produced Fluid 9,757.03 Bbl REUSE (AT WELL PAD)
2019 ARD OPR LLC Other Oil & Gas Wastes 213.96 Bbl REUSE (AT WELL PAD)
2019 ARD OPR LLC Soil Contaminated by Oil 7.26 Tons LANDFILL 100955

For data sources see[6]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
2754024 Primary Facility 2018-07-19 Routine/Complete Inspection No Violations Noted Weather was 70° and sunny at time of inspection. Met with Alta representative Bill Mitchel on location. At time of inspection well was closed in with a night cap. Rig skidded onto another well after cementing the intermediate and surface casing. Reviewed job logs from the surface and intermediate casing and no discrepancies were noted. Conducted a walk around inspection of location. No violations noted at time of inspection.
2759464 Primary Facility 2018-07-27 Routine/Complete Inspection No Violations Noted Routine Inspection; 7/27/2018.

I entered the site at 15:25 and talked to Bill Mitchell (company man). The Flexrig 225 was onsite drilling the curve (oil based mud) on the Elbow F&G C-213H (081-21729) well at the time of the inspection. The containment was in good condition and i recommend continued vacuuming as water has accumulated from precipitation. Overall, the site and access road have also held up well from the significant rainfall recently. No violations noted.

2769696 Primary Facility 2018-08-30 Routine/Complete Inspection No Violations Noted I met R.D. Mann when I arrived. H&P 225 rig on location, drilling at 6300' on the 215H well. Overall condition of the containment and berms was good, but near the chemical containment area, the berm was completely covered by gravel, making it impossible to see. In the chemical containment area, I noted a rig wash tote set on a pallet that was not completely on the pallet and was leaning slightly as a result; I recommended to R.D that it be stabilized. Some water was present in secondary containments, but did not seem to be excessive. I also noted that the 6" drill mud line was vibrating and abrading the liner at a union near a 90 degree joint. R.D. told me he would see to these issues.
2776402 Primary Facility 2018-09-18 Drilling/Alteration No Violations Noted Seven wells recently drilled. Rig no longer on location. Rig matting removed. Primary felt containment remains at this time. The containment is covered in drilling mud from washing of the rig matting. The operator is reminded to remove standing water before removal of the containment. Three puddles on the pad surface returned 250 uS/cm of conductivity. No spills detected at this time. Site stable. No violations noted.

For data sources see[7]

References