Well ID: 37-081-21741 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.443872,"lon":-76.916631,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Lycoming | |
Municipality: Cascade Township | |
Operator Name: ARD OPR LLC | |
Well Pad ID: 155240 | |
Farm/Lease Name: MAC NORTH B-4H | |
License Status: | |
Spud Date: | |
Permit Date: 2018-05-08 | |
Well Type: GAS | |
Unconventional Well: Y | |
Configuration: Horizontal Well | |
Conservation: No | |
Latitude: 41.443872 | |
Longitude: -76.916631 |
Date | Event |
---|---|
2018-05-08 | New Permit Application |
2018-10-02 | MOD |
2018-10-26 | Performed Spud Operation |
For data sources see[4]
Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
---|---|---|---|---|---|---|---|
2019 | ARD OPR LLC | 1,045,256.97 | 64 | 0.00 | 0 | 0.00 | 0 |
For data sources see[5]
Period | Operator | Waste Type | Quantity | Disposal Method | Waste Facility ID |
---|---|---|---|---|---|
2018 | ARD OPR LLC | Drill Cuttings | 21.09 Tons | LANDFILL | 100955 |
2018 | ARD OPR LLC | Drill Cuttings | 333.37 Tons | LANDFILL | 301358 |
2019 | ARD OPR LLC | Produced Fluid | 90.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123 |
2019 | ARD OPR LLC | Synthetic Liner Materials | 3.98 Tons | LANDFILL | 301358 |
2019 | ARD OPR LLC | Drill Cuttings | 1,452.05 Tons | LANDFILL | 301358 |
2019 | ARD OPR LLC | Waste Water Treatment Sludge | 3.83 Tons | RESIDUAL WASTE PROCESSING FACILITY | WMGR123 |
2019 | ARD OPR LLC | Synthetic Liner Materials | 8.36 Tons | LANDFILL | 100955 |
2019 | ARD OPR LLC | Drill Cuttings | 6.48 Tons | LANDFILL | 100955 |
2019 | ARD OPR LLC | Unused Fracturing Fluid Waste | 50.00 Bbl | LANDFILL | 100955 |
2019 | ARD OPR LLC | Servicing Fluid | 7.25 Bbl | REUSE (AT WELL PAD) | |
2019 | ARD OPR LLC | Other Oil & Gas Wastes | 225.57 Bbl | REUSE (AT WELL PAD) | |
2019 | ARD OPR LLC | Produced Fluid | 542.31 Bbl | REUSE (AT WELL PAD) |
For data sources see[6]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
2785096 | Primary Facility | 2018-10-05 | Routine/Complete Inspection | No Violations Noted | The pad and site remains under construction. An under drain is clearly seen during this inspection ( see photo). Site stable. No erosion. |
2798704 | Primary Facility | 2018-11-06 | Drilling/Alteration | No Violations Noted | Surface hole rig drilling conductor for permitted wells. All cuttings being disposed of properly. All containers within secondary containment. No issues noted. |
2804375 | Primary Facility | 2018-11-13 | Drilling/Alteration | No Violations Noted | Weather was 43° and cloudy at time of inspection. There were no Alta representatives on location at time of inspection. Well was a spud conductor only. Conductor casing was set and cemented in place. The cellar rings were in the process of being installed at time of inspection. No violations were noted at time of inspection. |
2806704 | Primary Facility | 2018-11-19 | Routine/Complete Inspection | No Violations Noted | Weather was 35° and cloudy at time of inspection. There were no Alta representatives on location at time of inspection. Well was a spud conductor only. Conductor casing was set and cemented in place. The casing had a steel plate welded over the top at time of inspection. Well cellar rings were installed. No violations were noted at time of inspection. |
2824562 | Primary Facility | 2019-01-09 | Routine/Complete Inspection | No Violations Noted | I met Bill Mitchell of ARD when I arrived. H&P rig 225 on location, running 9 5/8 casing in the 1H well. Containments appeared to be in good condition. On the south side of the pad, I noted several small puddles with a blue tint that had a soapy foam on them. The rig was being washed at the time, making it likely that this was rig wash water escaping containment. I also noted a pump just off of the east side of the containment that had a light spattering of a red substance frozen in the ice next to it. When I showed these areas to Bill, he noted that the red substance was likely diesel fuel, and told me he would have both areas cleaned up. I also pointed out to Bill a pallet of bags of citric acid that were not in containment, and he told me he would see to it that they were placed in containment. Some water (1-2") had built up around the edges of the containment, and Bill said he would have these areas vacced. |
2827887 | Primary Facility | 2019-01-14 | Drilling/Alteration | No Violations Noted | Weather was 16° and sunny at time of inspection. Met with Alta representative Bill Mitchell on location. Rig was in the process of drilling the 8 3/4" hole for the production casing. They estimated cementing the production string early to mid next week. Reviewed the daily activity reports and cement job logs from the top hole strings and no discrepancies were noted at time of inspection. No violations were noted at time of inspection. |
2839913 | Primary Facility | 2019-02-13 | Drilling/Alteration | No Violations Noted | Weather was 30° and sunny at time of inspection. Met with Alta representative Bill Mitchell on location. This well had its production casing drilled and cemented to TD. Reviewed the job logs and daily activity reports from the job and no discrepancies were noted at time of inspection. Well was closed in with a night cap and covered with rig equipment at time of inspection. No violations were noted at time of inspection. |
2840503 | Primary Facility | 2019-02-14 | Routine/Complete Inspection | No Violations Noted | I met RD Mann when I arrived. H&P 225 rig on site, drilling at 14800' on the 2B well. Snow and ice cover on containment, but berms appear to be in good condition. The area under the rig shakers had an accumulation of oily water, as did the area behind the mud tanks. I recommended to RD that he have these areas vacced. Chemical containment was sound, although snow had accumulated in it. |
2843189 | Primary Facility | 2019-02-22 | Routine/Complete Inspection | No Violations Noted | Weather was 29 degrees and sunny. Met with Alta representative R.D. Mann. Well recently had its production casing drilled and cemented. Well was closed in with a night cap and cover with rig equipment at time of inspection. No violations noted at time of inspection. |
2852932 | Primary Facility | 2019-03-13 | Routine/Complete Inspection | No Violations Noted | Weather was 30 degrees and sunny. Met with Alta representative Bill Mitchell on location. Well recently had is production casing drilled and cemented to TD. Well was currently shut in with a nightcap and covered with rig mating. No violations at time of inspection. |
For data sources see[7]