If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 37-081-21742 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.466608,"lon":-76.901875,"icon":""}]} |
| Country: United States | |
| State: Pennsylvania | |
| County: Lycoming | |
| Municipality: Cascade Township | |
| Operator Name: ARD OPR LLC | |
| Well Pad ID: | |
| Farm/Lease Name: LITTLE FAWN NORTH A-1H | |
| License Status: | |
| Spud Date: | |
| Permit Date: 2018-05-09 | |
| Well Type: GAS | |
| Unconventional Well: Y | |
| Configuration: Horizontal Well | |
| Conservation: No | |
| Latitude: 41.466608 | |
| Longitude: -76.901875 |
| Date | Event |
|---|---|
| 2018-05-09 | New Permit Application |
For data sources see[4]
| Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
|---|---|---|---|---|---|
| 2785060 | Primary Facility | 2018-10-05 | Routine/Complete Inspection | No Violations Noted | The construction of the well site access road is underway at this time. The geo-textile and gravel is being applied to the road at this time. The access road is almost two miles long. The construction of the well pad has not yet started. Construction of the site will take many more weeks. No erosion. Site stable. |
| 2813342 | Primary Facility | 2018-12-11 | Routine/Complete Inspection | No Violations Noted | The well pad access road remains under construction. The road will be finished, but the well pad will not be constructed until spring time. Site stable and the stream crossings have no sediment discharge to them. No violations noted. |
For data sources see[5]