X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

37-081-21781

Well Details

Well ID: 37-081-21781
Loading map...
Country: United States
State: Pennsylvania
County: Lycoming
Municipality: Cogan House Township
Operator Name: ARD OPR LLC
Well Pad ID: 145604
Farm/Lease Name: ELBOW F&G
License Status: Plugged and Abandoned
Spud Date:
Permit Date: 2019-01-16
Well Type: GAS
Unconventional Well: Y
Configuration: Horizontal Well
Conservation: No
Latitude: 41.362525
Longitude: -77.246078

For data sources see[1][2][3]

Well History

Date Event
2019-01-16 New Permit Application
2019-02-08 Performed Spud Operation
2019-05-07 Begin Plugging
2019-05-08 Finished Plugging
2019-09-16 Fully Plugged

For data sources see[4]


Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2019 ARD OPR LLC 98,866.75 14 0.00 0 0.00 0

For data sources see[5]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2019 ARD OPR LLC Produced Fluid 881.88 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC010
2019 ARD OPR LLC Produced Fluid 681.98 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123
2019 ARD OPR LLC Drilling Fluid Waste 79.99 Bbl REUSE (AT WELL PAD)
2019 ARD OPR LLC Drill Cuttings 2,177.40 Tons LANDFILL 301358
2019 ARD OPR LLC Synthetic Liner Materials 5.29 Tons LANDFILL 100955
2019 ARD OPR LLC Servicing Fluid 11.67 Bbl REUSE (AT WELL PAD)
2019 ARD OPR LLC Drill Cuttings 48.28 Tons LANDFILL 100955
2019 ARD OPR LLC Waste Water Treatment Sludge 2.38 Tons RESIDUAL WASTE PROCESSING FACILITY WMGR123
2019 ARD OPR LLC Unused Fracturing Fluid Waste 704.96 Bbl LANDFILL 100955
2019 ARD OPR LLC Other Oil & Gas Wastes 258.80 Bbl REUSE (AT WELL PAD)
2019 ARD OPR LLC Produced Fluid 2,253.13 Bbl REUSE (AT WELL PAD)

For data sources see[6]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
2853472 Primary Facility 2019-03-07 Routine/Complete Inspection No Violations Noted Weather was 12 degrees and sunny. No Alta representatives on location at time of inspection. Well was a Spud conductor only. Conductor casing was set and covered with a steel plate. Mouse hole was set and covered with a steel plate. Cellar was covered by steel grating. This well is set to be completed when drilling is completed at the Mac pad. No violations at time of inspection.

For data sources see[7]

References